    Offshore Wind Turbine Foundations - In Denmark And Belgium - Introduction

    By Jørn H. Thomsen

    This paper presents the experience gained and the lessons learned over the last decade within the numerous offshore foundation projects undertaken in the offshore waters of Denmark and Belgium by COWI

    Jan 1, 2013

  • DFI
    Drilled Shaft Difficulties and a Micropile Solution

    By Jeff Jackson, Paul Axtell, David Graham

    The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were

    Jan 1, 2018

  • DFI
    In-Situ Permeability Testing For Cement-Bentonite Cutoff Wall ? Lessons Learned

    By François G. Bernardeau

    Cement-bentonite (C-B) slurry walls have been used for ground water cutoff in deep excavations, contamination containment, and other applications. Hydraulic conductivity is of great concern for cement

    Jan 1, 2008

  • DFI
    Application of Mammoth Vibro-Tamper (MVT) for the Shallow Compaction at Airport Runway Expansion Project on Florida Limestone Ground

    By Kazunori Matsushita, Frank Vespi, Emi Walder, Mitsuo Nozu

    During the runway expansion project at the Fort Lauderdale-Hollywood International Airport in Florida (FLL project), therewere complicated geotechnical issues with a number of cavities in the limeston

    Jan 1, 2018

  • DFI
    Reconstruction Of Hudson River Pier 86 - Home Of The USS Intrepid Aircraft Carrier

    By Michael Quadagno

    Hudson River Pier 86, home of the historic USS Intrepid Aircraft Carrier and the Intrepid Sea-Air-Space Museum, is currently undergoing a $30M reconstruction. This project involves the demolition of t

    Jan 1, 2008

  • DFI
    Load In A Drilled Foundation. Where Did It Go And When Did It Get There?

    By Walter E. Vanderpool

    Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.

    Jan 1, 2004

  • DFI
    New Method for Reduction of Settlement Drilling Casings for Steel Core Piles

    By Larsson Lars-Erik, Rani Isa, Martin Jönsson, Håkan Bredenberg, Mats Larsson

    "IntroductionSteel Core Piles are used extensively in Scandinavian countries, where hard rock is found within reasonable depths. A steel core is cast into a drilled steel tube casing and a rock hole i

    Jan 1, 2014

  • DFI
    Anchored Excavation Support Using SMW (Soil Mixed Wall)

    By Seth L. Pearlman

    A major excavation support case history for the Eastern approach to the Third Harbor Tunnel (THT) in Boston, MA is described, which uses an anchored Soil Mixed Wall (SMW). Both general and project spe

    Jan 1, 1993

  • DFI
    Creative Shoring Solutions For A Tight Urban Site

    By David G. Winter

    The Olive 8 excavation site in Seattle was surrounded on three sides by conditions requiring innovation, careful modeling, and extensive instrumentation to support use of a first-of-its-kind shoring s

    Jan 1, 2009

  • DFI
    Continuous Flight Auger Piles In The Blue Ridge: A Case Study Using Instrumentation In Pile Design

    By Jesse R. Jacobson

    A large casino complex in Cherokee, North Carolina recently underwent a $633 million expansion that involved substantial foundation challenges. The site is located in a valley on the southern edge of

    Jan 1, 2011

  • DFI
    The Impact Of Vibro Compaction Adjacent To Large Vertical Maritime Retaining Structures

    By Barry C. Slocombe

    The development of new ports, extensions of existing facilities and reclamation of former docks will involve consideration of a variety of geotechnical problems. This paper presents data including in

    Jan 1, 2008

  • DFI
    Problems Encountered For Deep Caissons For The Second Bassein Creek Bridge At Mumbai, India

    By Deepak B. Deshpande

    This paper enumerates various difficulties encountered in the design and construction of deep caisson foundations for the Second Bassein Creek Bridge constructed over a creek with very difficult site

    Jan 1, 2002

  • DFI
    Press-In Piling Technology For Sustainable Construction

    By Philip Dubbeling

    Conventional dynamic sheetpiling techniques are ill-suited to urban development because of the emission of excessive noise and ground vibrations. Drilled shafts and slurry walls alleviate some of thes

    Jan 1, 2006

  • DFI
    Construction And Instrumentation Of A Deep Foundation ? Synopsis

    By Y. K. Wong

    This paper describes in detail various problems concerning the construction of a pile-raft foundation supporting a 42-storey tower block. The subsurface generally consists of highly weathered sediment

    Jan 1, 2010

  • DFI
    Underwater Concrete - Mix Design And Construction Practices

    By Sam X. Yao

    The underwater concrete technology has historically evolved largely through a trial-and-error process of constructing marine works. Many outstanding examples exist of high quality concrete placed unde

    Jan 1, 2013

  • DFI
    Differing Site Conditions

    By James J. Tansey

    A Deep Foundations Institute meeting with the University of Michigan at Ann Arbor in March of 1984 featured legal rights under Differing Site Conditions. A workshop conducted by the authors and Gerard

    Jan 1, 1985

  • DFI
    History Of Timber Piles And Preservation Techniques - A Presentation At The Deep Foundations Institute Annual Meeting Williamsburg, Virginia, December 1982

    By Bruce Haldeman

    Timber has been used as pile support for structures for 6,000 years. Some means of preservation of wood go back almost that far. Timber piles support all types of structures ? some are buried below th

    Jan 1, 1984

  • DFI
    Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering Techniques

    By Mazin Adnan

    The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e

    Jan 1, 2008

  • DFI
    Amsterdam North South Line Metro - Construction Of Deep Diaphragm Walls For Three Underground Stations.

    By Theo. A. M. Salet

    The historic centre of one of the most beautiful cities in Northern Europe -Amsterdam - is being excavated to accommodate the new North/South metro line. This new line is due for completion in 2012, a

    Jan 1, 2006

  • DFI
    Supported Excavation Movement Causing Lateral Displacement and Cracks in Drilled Shafts - Lessons Learned from a Case Study in Chicago

    By Eric R. Borys, Amaneh E. Kenarsari, Brett Gitskin

    This case study discusses impacts of excessive Earth Retention System (ERS) lateral movement at a project in city of Chicago. The ERS (cantilevered sheeting) moved inward towards the excavation and ca

    Jan 1, 2018