An Innovative Foundation Technology For The Construction Of Retaining Walls In Urban Areas - Introduction
By F. Pagliacci
Retaining walls for the construction of underground urban infrastructures have to be executed considering the impact of a deep foundation job-site within an urban network. Traditional excavation syste
Jan 1, 2000
-
Soil Profiles Along The Alignment Of The I-880 Replacement Project
By Mark A. Willian
The purpose of this short paper is to present soil profiles and basic soils information for the portion of the I-880 Replacement Project alignment where highway structures are to be built. The informa
Jan 1, 1996
-
Statnamic Load Testing Of High Capacity Marine Foundations
By Mike Muchard
STATNAMIC load testing augmented with embedded instrumentation has been successfully used to obtain structural and geotechnical design information on large diameter spun cast concrete cylinder piles o
Jan 1, 2005
-
Response to Load for Four Different Types of Bored Piles
By Mario Terceros H., Bengt H. Fellenius
"ABSTRACTFour strain-gage instrumented bored piles were constructed in a sedimentary, dense to very dense, fine to medium sand in Santa Cruz, Bolivia. Two of the test piles were the normally used bore
Jan 1, 2014
-
Designed, Dynamically Load Tested And Installed Pile Foundation In Southwest Florida - A Case History
By Christopher J. Pacitto
This paper presents a case history of an engineered, monitored, and tested program that provided an effective and satisfactory basis for the completion of pile foundations for Twin Dolphins 1 at La Pe
Jan 1, 2002
-
Drilled Pier Foundations for Mercedes-Benz Stadium
By Jean Wehbe, Daniel C. Brahana
"The new Mercedes-Benz Stadium (MBS), home of the Atlanta Falcons, is part of a new era of stadium construction in the U.S. These new-age stadiums are larger and have more amenities than their predece
Jan 1, 2016
-
Soil Mixing Treatment of Marginal Soil for Railway Construction and Maintenance (8f2b4a54-c8f3-43f2-a476-24a3cd46424e)
By Charles M. Wilk
"Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o
Jan 1, 2015
-
High Capacity Hollow Core Bar Piles
By Lawrence F. Johnsen, Felix Ferrer, Dino Tomasetti, Cassandra A. Wetzel
"A 17 story building was constructed at the Brooklyn Navy Yard on a site with a long history of development. Most recently the site supported a dewatering well and craneway to service two adjacent dry
Jan 1, 2017
-
Soil Mixing Treatment of Marginal Soil for Railway Construction and Maintenance
By Charles M. Wilk
"Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o
Jan 1, 2017
-
Use of CSM to Support a Heritage Building
By Chris G. Leach
"Abstract A seven storey Northbridge area of Perth, Western Australia presented residential apartment complex located in the an opportunity for a novel application of Cutter Soil Mix technology (CSM).
Jan 1, 2014
-
RC Harris Water Filtration Plant Expansion Excavation Support Design, Installation And Performance
By Matthew Janes
The RC Harris Filtration Plant, which treats the majority of the fresh water for over 2.5 million Torontonians, is a Canadian Architectural Heritage site demonstrating a classic example of Art Deco A
Jan 1, 2006
-
7-Foot Diameter Drilled Shafts In Weathered Rock: Design, Load Testing, And Construction
By Aly M. Mohammad
The design of large diameter drilled shafts in weathered rock has always presented a challenge to the foundation engineers. Degree of weathering and load transfer mechanism through the rock are essent
Jan 1, 2003
-
Construction of Long Deep Mixing Columns by Low-Height Rig
By Shigenori Horikawa, Nobutaka Tanaka, Toshiro Hara, Kengo Yamamoto
"The CDM-LODIC method(Low Displacement and Control method), a modified the CDM(Cement Deep Mixing) method, reduces the ground displacement through the removal of in-situ soil equivalent to the amount
Jan 1, 2015
-
Case History Of The Support Of Excavation System At The San Diego State University (SDSU) LRT Station
By Allan Sylvester
This paper will discuss the design, construction, and performance of the support of excavation on the San Diego State University LRT Station. The vertical elements of the system include drilled secant
Jan 1, 2002
-
Interstate 70 Construction Through Glenwood Canyon, Colorado - Glenwood Canyon Construction
By Ray Schmahl
The Glenwood Canyon is a 13 mile long river gorge formed by the Colorado River approximately 2 miles East of Glenwood Springs, Colorado and approximately 150 miles West of Denver Colorado, (See Drawin
Jan 1, 1990
-
A Study Of Three Test Sites Comparing Theoretical Ultimate Pile Capacities, Static Pile Load Tests, And Psuedo Static Pile Load Test Results
By Richard D. Short
The Pseudo Static Pile Load Test, PLT, is a rapid method for determining pile capacity. Pile design is usually based on theoretical calculations of ultimate load capacity using soil data from a field
Jan 1, 2000
-
Quality Control For Augered Cast-In-Place Piles In Texas And Louisiana - 1.0 Introduction
By Timothy L. Roberts
For many years practicing geotechnical and structural engineers in Texas and Louisiana were reluctant to include augered cast-in-place (ACIP) piles as a viable deep foundation alternate. Three primary
Jan 1, 1998
-
Deep Bored Piling in Soft Soil and High Lateral Loads
By W. Sondermann
"AbstractThe construction of a distribution centre of minerals for a global mining and resources cooperation demanded the control of deformations and displacement of the stack reclaimer facilities on
Jan 1, 2014
-
Special Topic On Eurocode 7 And Standardization - Eurocode 7 - A European Geotechnical Design Code - The Eurocode System * The Objectives Of The Eurocodes
By Niels Krebs Ovesen
Close economic cooperation was established among the countries in western Europe during the seventies. As a consequence, among others, a need for harmonized technical specifications for civil engineer
Jan 1, 1994
-
Cement-Bentonite Slurry Cut Off Wall Maxent Lagoon Levee Rehabilitation Orleans Parish, Louisiana - Summary
By Edmund J. Cardoza
The paper describes the design, construction and quality control aspects of the installation of a cement-bentonite (CB) cut off wall to impede seepage through a flood control dike. Special emphasis is
Jan 1, 1992