Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Field Sampling and Testing for Soil Mixing – Uses and Misuses of Different QA/QC Tests for CDSM Projects – A Contractor’s Perspective
By A. David Miller, Chika Oya
"Field sampling and testing are part of the Quality Assurance/Quality Control (QA/QC) requirements for all Cement Deep Soil Mixing (CDSM) Projects. Field sampling and testing are also used for determi
Jan 1, 2017
-
Improvements in Deep Compaction Using Vibratory Pile Hammers (a877ad8a-6d27-4e33-a419-f0edb9bac870)
By Dennis Nottingham
"Increased interest in seismic soil liquefaction and preventative soil stabilization sets the stage for improved deep compaction methods using pile driving techniques. In 1971, L.B. Foster Company per
Jan 1, 2005
-
Concrete Filled Steel Tubes for Deep Foundations of Transportation Structures
By Charles Roeder, Amy Leland, Dawn E. Lehman
Concrete filled steel tubes (CFSTs) are composite members that are commonly used in many countries today. CFST components are used in the United States, but they are more common in Asia, in part becau
Jan 1, 2019
-
Foundation Design and Construction Challenges with Marsh Deposits in a High Seismic Risk Zone
By M. Reza Saberi, T. Ted Miyake
Driven piles are a common tool in any engineer’s toolbox for supporting large structures over very soft ground, especially in high seismic risk zones. Challenges include achieving sufficient vertical
Jan 1, 2018
-
Piled Foundation Design as Reflected In Codes and Standards
By Bengt H. Fellenius
"ABSTRACTAn example from a guidelines document for the Eurocode is discussed that addresses design for geotechnical strength of piled foundations in settling soil, generating drag force and downdrag.
Jan 1, 2014
-
Complex Deep Foundation System for Tall Tower in New York City
By Renzo D. Verastegui, Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala
"When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high-rise towers in New York City. The 52-story condominium building is located on a 60 ft by 100 f
Jan 1, 2017
-
Design and Construction of Nysted Offshore Wind Farm, Denmark
By Jørn Thomsen, Christoffer Brodbaek
"As governments increasingly accord high priority to sustainable energy, policymakers are finding that wind energy has a long track record as a proven alternative to conventional energy supply.Over th
Jan 1, 2009
-
Experimental Study on Lateral Capacity of Single Pile Embedded in Cement-Treated Sand
By Takeshi Maki, Kh. Adeel Tariq
"The lateral resistance of the structure plays an important role during seismic event and it can be increased by using ground improvement. In this study an attempt has been made to investigate the eff
Jan 1, 2017
-
Laboratory Mixing and Testing for Controlled Waste Disposal Site
By Tomohiro Yamasaki
"At the pre-construction foundations of the controlled waste disposal site built at the Port of Kinuura, the clayey soil account for the most, and with lesser amounts of sand compaction piles and sand
Jan 1, 2015
-
Deep Mixing Technology in Deep Excavation in Soft Soil Area of Shanghai
By Jie-qun Zhai, Jian Jia, Ke Yang, Xiao-lin Xie, Yu Zhang
"With cities’ development, underground space exploitation presents a need for bigger and deeper constructions now. Technical problems founded during the construction of deep foundation pit support bec
Jan 1, 2015
-
Case Study: Large Diameter Helical Pile Foundation for High Voltage Transmission Towers in Soft Glacial Deposits
By John Dunn, Matt Hawley, Kashif Butt, Nicholas Gura
"This paper presents the results of a static load testing program completed on helical pile foundations for the replacement of high voltage transmission line tower structures. The foundations were par
Jan 1, 2017
-
Construction of a Very Flexibility, Impermeable, Bituminous Membrane Seepage Barrier, to Connect an Existing Concrete Dam Structure to a Newly Constructed Abutment Cut-Off Wall
By Brian Wilson, Megan Atkinson, Richard Diggle, Nathan Sweeney
"Ruskin Dam, located near Mission, British Columbia, was constructed in 1929 and 1930 and comprises of a concrete gravity dam structure founded on bedrock. At the right abutment, which consists mostly
Jan 1, 2017
-
San Diego Courthouse Commons Shaft Shoring And Tunnel Canopy Tubes
By Ali Nasirian Ph. D., Gabriel Carvajal
To facilitate the safer and more secure transportation of inmates from San Diego Central Jail to the new San Diego Courthouse, the County of San Diego committed to building a new transfer facility as
Oct 1, 2022
-
Jet Grouting at the West Toronto Diamond Grade Separation Project
By Jim Bruce, Naresh Gurpersaud
"The West Toronto Diamond project, under construction since 2006 and due to be complete in 2015, is a rail-to-rail grade separation project in the heart of urban Toronto. Once complete, a depressed co
Jan 1, 2017
-
Pile Foundations for the San Francisco 49ers NFL Stadium
By Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi
"The new San Francisco 49ers Levi’s Stadium is part of the next generation of sporting facilities. Constructed in Santa Clara, Calif., the new structure has 68,500 open-air bowl seats and includes a 7
Jan 1, 2014
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field Work
By Darrell L. Beddard
Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai
Jan 1, 1996
-
Comparison of Pile Foundations and Ground Improvement for Reduction of Seismic Displacements for a Wastewater Treatment Plant
By Andrew Port, Ali Ghandeharioon
Nonlinear seismic deformation analyses using the finite difference program FLAC were performed for a wastewater treatment plant to estimate foundation displacement and performance of two proposed tric
Jan 1, 2018
-
Dynamic Pile Testing In Soils Exhibiting Set-Up - Introduction
By Juan M. Antorena
A dynamic testing program was performed to evaluate installation procedures, assess capacity of 610-mm (24-inch) diameter open ended steel pipe to evaluate set-up and provide minimum pile tip elevatio
Jan 1, 1995
-
A New Diaphragm Wall Technology Providing Mechanical And Watertightenss Continuity
By P. Dupeuble
Diaphragm walls, owing to their method of construction are discontinuous structures. A new technology for the construction of joints between panels has been developed. This new process allows for the
Jan 1, 2010
-
High Capacity Rock Anchors At The Bear Mountain Bridge
By Frederick C. Rhyner
This paper describes the design and construction of two high-capacity rock anchors to restrain a supplementary backstay for the Bear Mountain Bridge, which is a suspension bridge spanning the Hudson R
Jan 1, 2010