The Effect Of Overburden On Pile Capacity In A Calcareous Marl
By William M. Camp
An extensive design phase testing program in which 10 piles and 2 drilled shafts were instrumented and statically load tested to failure, was undertaken to establish relevant foundation design paramet
Jan 1, 1993
-
Deep Diaphragm Wall Activities At Randstadrail Project In Rotterdam, The Netherlands
By Klaus Pöllath
The Netherlands RandstadRail project makes use of a large range of sophisticated geotechnical techniques to allow a shield driven tunnel to approach the central station of Rotterdam. This paper descri
Jan 1, 2006
-
Design And Construction Of Tower Foundations For 345kV Youngheung Marine Transmission Line
By Suk han Jang
This paper describes the tower foundation design and construction experience for the 345kV Youngheung marine transmission line, which has been in commercial operation in Korea since July, 2004. This
Jan 1, 2007
-
New Focus: Environmental Impact Reduction of Proper Slurry Waste Management
By Zachary Q. Maassen
The purpose of this paper is to highlight the environmental benefits of properly managing slurry waste as it is generated on site. The following projects will be used to illustrate the importance of p
Jan 1, 2018
-
Developing Effective Specifications For Tremie-Concrete Placement In Drilled Shafts
By Giuliana A. Zelada-Tumialan
Reduced workability and flowability of the concrete through the tremie tubes and drilled shaft reinforcement have been identified as the main causes of tremie-concrete drilled shaft concrete defects.
Jan 1, 2009
-
Safe Execution Of Special Foundation Works Analysis - Concept - Implementation
By Walter Ensinger
Special foundation works is one of the most innovative sectors in civil engineering and construction. Both engineering techniques and construction machinery are undergoing continuous further developm
Jan 1, 2002
-
Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic Retrofit
By A. R. Dover
The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew
Jan 1, 2008
-
American Developments In The Use Of Small Diameter Inserts As Piles And Insitu Reinforcement
By D. A. Bruce
The use of small diameter cast-in-place bored piles is becoming increasingly popular in the United States. Such inserts are used as conventional load bearing piles, and are generally referred to as pi
Jan 1, 1989
-
Predicting ACIP Pile Settlement Using Case Histories ? Introduction
By Christopher M. Kenney
Augered-cast-in-place (ACIP) piles have been utilized on commercial projects throughout many parts of the country for years, but are only beginning to be scrutinized for use on major infrastructure pr
Jan 1, 2001
-
You Are Safer In Litigation - I. Prologue
By Charles F. Seemann
It is with considerable trepidation that I set out to defend "litigation" to Design Professionals (DPs), as a better method of resolving disputes than arbitration, in the light of my personal feeling
Jan 1, 1988
-
History Of Chicago Foundation Systems & Underground Construction ? Summary
By Theodore R. Maynard
The history of foundation engineering in Chicago is a tale of innovation, made necessary in order to keep pace with structural technology which allowed taller buildings with heavier bearing loads, to
Jan 1, 1991
-
A Case Study On Underreamed Piles ? Synopsis
By Rajesh Minda
160 numbers of double bulb underreamed piles were constructed based on the safe loads specified in IS code at Tripura. The pile load tests yielded a much lower capacity. A detailed investigation work
Jan 1, 1996
-
Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)
By Jeffrey M. Taylor, Arturo Ressi di Cervia
"Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con
Jan 1, 2004
-
Center Rock Sets New Record on St. Louis Metro Project
"The Metropolitan St. Louis Sewer District (MSD) in Missouri, the country’s fourth largest sewer system, is upgrading its storm and wastewater infrastructure in a 23-yearlong, $4.7 billion initiative
Jan 1, 2017
-
Bertha Rescue Shaft – SR99 Tunnel
By Lance Rasband, Richard Hanke
"Seattle Tunnel Partners (STP) started mining on Seattle’s SR99 tunnel on July 30, 2013, working slowly through a 15 ft (4.6 m) thick fiber-reinforced concrete headwall. Once through the headwall, the
Jan 1, 2015
-
Construction of High Road Embankment over Thick Soft Silty Clay- A Case Study
By R. Radhakrishnan, C. Gunasekaran
"Calicut Bypass Phase-II project included construction of 7 m high embankment over soft compressible clays up to 18 m in thickness. Approx 1.5 km length of road out of a total 5 km length consisted of
Jan 1, 2015
-
Securing Rail Infrastructure in Romania
By Andreas Brandner
"At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors
Jan 1, 2017
-
Integrity Testing Of Deep Foundations - Synopsis
By R. T. Stain
Integrity testing of deep foundations is now common practice in Europe, indeed in the City of London such testing is a contractural requirement on every site. This paper is in two parts: Part
Jan 1, 1987
-
Construction Of A Pre-Founded Anchored Wall, Monitoring Of Execution Based On The Eurocode 7 Observation Method, And Taking Account Of The Transmission Of Seismic Forces In The Retaining Structures Towards The Buildings Structure
By Denis Huber
The technical assessment of the final works on the "Stéphany Palace" project at Menton in France's Alpes-Maritimes region shows the importance of daily project monitoring based on the observation
Jan 1, 2002
-
Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin
By Edward Jacobsen
The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in
May 11, 2007