    Case Studies In Mission Bay, San Francisco: Deep Foundations In Challenging Soil Conditions

    By Lori A. Simpson

    Mission Bay is a 300-acre reclaimed site in San Francisco, California, that is currently being redeveloped. Plans include new neighborhoods, parks, a new University of California, San Francisco, rese

    Jan 1, 2006

  • DFI
    FDOT Method of Independent Separation of Tip and Skin Capacities of Driven Concrete Pile with Embedded Sensors

    By Sastry Putcha, Vamshi Vemula, Aneesh Goly, Kumar Allady

    Current dynamic testing practice to obtain pile total capacity will not yield optimum capacity due to the strain incompatibility between the side and tip resistances during driving. Superposition of e

    Jan 1, 2018

  • DFI
    Seattle Shored Excavation - Design, Construction, Monitoring

    By David Winter

    The geotechnical design, construction, and monitoring aspects of a tied back excavation 85 feet deep in Seattle, Washington are presented. The excavation was completed in overconsolidated deposits of

    Jan 1, 1987

  • DFI
    "Value Engineering" In United States Of America

    By Maral Papazian Bedian

    Construction contracts in the USA contain the clause "Value Engineering" ? an interesting and curious clause allowing contractor initiated design changes. Misleading is the interpretation of value eng

    Jan 1, 2002

  • DFI
    Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? Summary

    By Chris Harnan

    This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques

    Jan 1, 2000

  • DFI
    Post-Tensioned Diaphragm Wall "T" Panels For Large Unbraced Excavation Spans - Introduction

    By Nino Catalano

    The combination of two top levels of cross-lot braces designed and installed to act as a truss, and vertical post-tensioning of the panels allow the unbraced excavation of a 36' span. Philoso

    Jan 1, 1994

  • DFI
    I - 280 / San Francisco Pile Load Test Results And Seismic Design Guidelines - 1. Earthquake Loading Of Structures - A Brief Overview - 1.1 The 1989 Loma Prieta Earthquake - 1.1.1. CSMIP Records - Recorded Time-History Data

    By James A. Mason

    The State of California has instrumented numerous buildings, bridges, and dams throughout the state with earthquake recording devices. These accelerometers are strategically placed to measure the resp

    Jan 1, 1993

  • DFI
    Design and Construction of the Thames Water Lee Tunnel Shafts, London

    By Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley

    "AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor

    Jan 1, 2014

  • DFI
    Challenges in the Design and Construction of Deep Foundations for Transportation Infrastructure Projects

    By Dan Brown

    Renewal and revitalization of transportation presents a challenge in the need for replacement, repair, and improvements of existing bridges, as well as increased construction of transit systems within

    Jan 1, 1900

  • DFI
    Partnering for Cutoff Wall Project Success

    By Osvaldo Valdez, Matteo Bertoni, Aem Ragy

    The East St. Louis Deep Cutoff Wall project is located in the area of East St. Louis, Illinois, across the Mississippi River from the city of St. Louis, Missouri, along the left descending bank of the

    Sep 1, 2023

  • DFI
    Seal Slab Prestressed Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents experimental results from a study to assess the interface bond between a cast-in-place concrete seal slab and prestressed concrete piles in cofferdams. Three different seal slab p

    Jan 1, 2013

  • DFI
    Some Developments On Laterally Loaded Piles With Particular Reference To P-Y Subgrade Reaction Method - Resume:

    By A. L. Garassino

    Dans cet article on parle sortout de l'approche de calcule pour les pieux charges horizontalement avec particuliere reference aux curbes p-y et è une solution semi-empirique qui prende en conside

    Jan 1, 1994

  • DFI
    Modification of Best-Fit Interpretation Method for Ultimate Capacity of Screw Pile

    By Adnan A. Malik, Tadashi Maejima, Jiro Kuwano

    "ABSTRACTTheoretical approach to estimate the ultimate pile capacity gives a rough idea at the initial stage of design that later on strengthen by the execution of static pile load test at site. The s

    Jan 1, 2014

  • DFI
    Fenway Park Modernization - Foundations For A Red Sox Nation

    By Mark H. Balfe

    Over the last decade, Fenway Park has undergone annual improvements to modernize the facility for players and fans. These renovations include the Monster Seats, the Right Field Roof expansion, a new

    Jan 1, 2011

  • DFI
    Macropiles: Ultra-High-Capacity Micropiles For Foundation Support

    By John R. Wolosick

    MACROPILES are defined as ultra-high-capacity micropiles, with working loads in excess of 250 tons. The piles are typically 9-5/8 to 24 inch (244 to 610 mm) outside diameter. They are drilled and gr

    Jan 1, 2006

  • DFI
    An Introduction to Water-Powered Down-the-Hole Drilling in Specialty Geotechnical Construction

    By Stefan Swartling, Rudy Lyon, Donald A. Bruce

    "Since their first production application in Sweden in 1995, water-powered, down-thehole hammers (WDTH) have been used throughout the world in many different drilling applications, total lines, over 2

    Jan 1, 2015

  • DFI
    Sonic Drilling and Sensitive Infrastructure

    By George Burnhart

    "Sonic drilling is a relatively new technology even though it has been in development since the late 1940s. It was initially funded by the U.S. petroleum industry and then, in the late 40s, Russian sc

    Jan 1, 2008

  • DFI
    The Underwater Cut-Off At The Walter F. George Dam

    By Gianfranco Di Cicco

    Seepage problems were recorded for more then 40 years at the Walter F. George lock and dam. In 2001 the Mobile district of The U.S. Army Corps of Engineers turned to the installation of a 200 feet dee

    Jan 1, 2013

  • DFI
    Skin Friction In Shale: Results Of The Hwy. 81 Bridge, Yankton, SD Drilled Shaft Load Test

    By Scott M. Mackiewicz

    This project includes replacement of the historic vertical-lift span Meridian Bridge (U.S. Highway 81 over the Missouri River) that connects Yankton, South Dakota with rural Cedar County, Nebraska. T

    Jan 1, 2008

  • DFI
    Innovations in the Design and Construction of Marine Foundations

    By Robert B. Bittner

    "AbstractLarge diameter tubular piles offer significant advantages in terms of design performance and economy for major marine structures. This is particularly true for foundations of major overwater

    Jan 1, 2014