Risks Associated With Finite Element Modelling Of Cut And Cover StructuresBy Tony Suckling
The commercially available finite element program Plaxis has a key benefit over other finite element analysis programs in that it has a relatively simple user interface to input and output data. This
Jan 1, 2010
-
A DC Electrical Resistivity Method for Jet Grouting Column Diameter Quality Control with Case Studies from Grand Paris ProjectBy Sina Z. Yekta, Zhangwei Ning, Pierre Frappin
This paper describes a DC (direct current) electrical resistivity method, which uses the contrasts in resistivity measurements to estimate the diameter of jet grouted columns as soon as they have been
Sep 8, 2021
-
Realistic Estimation Of Water Table Depth For Design Optimization Of Bored Tunnel And Cut & Cover Tunnel Structures For Underground MetroBy Chiranjib Sarkar, Sibapriya Mukherjee, N Kumar Pichumani
With the rapid expansion of urban transportation systems, tunnels and cut & cover structures are considered as the only solution in improving the urban space congestion problem in mass rapid transit s
Nov 1, 2022
-
Interactive 3-Dimensional Modeling of Anchors at Bluestone DamBy Jamey Rosen, Georgette Hlepas
"Bluestone Dam is a concrete gravity structure with an overall length of 2,060 feet and a maximum height of 165 feet above the streambed. Several major project modification designs have been implement
Jan 1, 2016
-
Simulation Of Soil-structure Interaction With Sheet Pile And Retained SoilBy Clarissa Aguiar, Seok hyeon Chai, Thamer Yacoub, Sina Javankhoshdel
Sheet piles are used as an excavation support for soil retention. They are interlocked systems to form a wall for earth support along with anchors to provide an extra lateral support in excavations. T
-
A Case Study Describing The Use Of A Top Down Construction Sequence For A Three Level Basement Using A Diaphragm Wall And Cfa Foundation PilesBy Chris Leach, Lucie Spencer
This case study describes the geotechnical aspects of the basement construction for a multi-storey, residential and hotel complex located in the newly developed Elizabeth Quay precinct in Perth, Weste
Nov 1, 2022
-
S21-Berlin – Design And Underwater Construction Of A Covered Contrustion Pit Without Direct Accessibility From AboveBy Grischa Dette, Thomas Schröder, Holger Merski
For the construction of the tunnel for the new Berlin S21 light rail line, a construction pit had to be built below the crossing B 96 federal road. For this purpose, the construction pit M’ has been b
May 1, 2022
-
Pile Design And Construction Challenges In Partially Thawed Alaskan SoilsBy John D. Thornley
Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alas
-
Pile Design and Construction Challenges in Partially Thawed Alaskan Soils (f9ca4371-20bf-4196-a495-4aa1bd15a8c0)By John D. Thornley
Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alask
Jan 1, 2017
-
Collaborative Data Sharing During Seepage Barrier Wall Construction at Bolivar Dam – Perspectives from Owner, Contractor and Sub-ContractorBy Robert Bachus, Jamey Rosen, Fabio Santillan, Georgette Hlepas
"A seepage barrier of length 4,800 feet and maximum depth 144 feet is being installed at Bolivar Dam in Ohio. This project is owned by the United States Army Corps of Engineers and contracted to Trevi
Jan 1, 2017
-
Integrity Testing of Drilled Displacement Piles at a Major CampusBy Mark D. Fuhriman, Parham Khoshkbari, Robert Fosse
Drilled displacement piles are becoming an increasingly common deep foundation choice for their relatively simple installation methods, applicability to a wide range of subsurface conditions, and vers
Sep 8, 2021
-
Completely Automatized Recognition of the Installation Process in Special Foundation ConstructionBy Christian Hoyme, Jochen Maurer, Hans Regler
Up to today, it has been very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. It is becoming more and more important to be
Sep 8, 2021
-
Ground Freezing for Groundwater Cutoff at the Seattle Seawall Replacement ProjectBy Brenton Cook, Daniel Mageau, Larry Applegate, Aaron McCain
"Ground freezing was successfully used to create an impermeable barrier wall along 3,000 feet of the downtown Seattle waterfront as part of the Seattle Seawall Replacement Project. This $360 million r
Jan 1, 2016
-
On Driven Piles In The Arabian Gulf: Imperfections, Potential Challenges, And Lessons LearnedBy Waddah Akili
The demand on pile installation in the offshore of the Arabian Gulf has, over the last two decades, experienced unprecedented boom, triggered by the construction of platforms, to help facilitate the p
-
Large Diameter Auger Cast Piles At Audi Field, Dc United's New Soccer StadiumBy Christophe H. Locussol
D.C. United, the professional soccer team located in Washington, D.C., completed a 20,000 seat capacity stadium in July 2018 named Audi Field. The project initially considered a foundation system cons
-
Numerical Study On Behavior Of Unreinforced And Reinforced Disconnected Piled Raft FoundationBy P. Seethalakshmi, Yatakuri Yaswanth Naidu
The use of a single pile, group of piles with pile cap, piled raft foundation system, etc., are prevalent in transferring the superstructure load from the soft soil layers to the firm underground laye
Sep 1, 2022
-
Introduction (10b9df94-8559-46e8-b74a-5e5ae2f990b0)"The development of non-destructive testing (NDT) methods for deep foundations occurred in several parts of the world, gradually coming together into the present state of the art. The compilation of t
Jan 1, 2004
-
Calibration of the Gates Pile Driving Equation for LRFD in LouisianaBy Glenn J. Rix, Eduardo Tavera, Raphael Siebenmann, Zhongjie Zhang, Robert C. Bachus, Jongwon Jung
"The Louisiana Department of Transportation and Development (LADOTD) uses a variation of the FHWA-modified Gates equation to verify the nominal pile bearing resistance, typically on smaller projects w
Jan 1, 2017
-
Deep Mixing Column Group Reinforcement by a Shallow Mixing Layer bBeneath an EmbankmentBy Tomohide Takeyama, Binh T. T. Nguyen, Masaki Kitazume
"Deep mixing columns are widely used to support embankments constructed on soft ground area. Researches on the stability of deep mixing columns were done by some authors when the columns do not simult
Jan 1, 2015
-
Bored Pile Construction Challenges in Highly Variable Limestone for a Supertall BuildingBy Seth K. Martin, Tony Nichlany, Alan R. Poeppel, Konstantinos Syngros
"This paper presents a case study on bored pile construction in challenging karst conditions below a supertall building in Kuala Lumpur. Innovative design and construction techniques helped keep the p
Jan 1, 2016