    Confined Space And Inner-City Projects – Future Challenge And Opportunity For Diaphragm Walling

    By Alexander Blatt, Franz-Werner Gerressen

    Diaphragm walls are known as underground structural elements commonly used as retention systems for excavation pits and shafts and permanent foundation walls or elements. One can anticipate that globa

    Nov 1, 2022

  • DFI
    Cut-Off-Wall Welzow in the Lausitz, Germany, a 400 Feet (120 M) Deep Hydraulic Barrier between an Existing Lake Region and an Open Pit Coal Mine

    By Stephan Fisch, Franz-Werner Gerressen

    "The use of cut-off-walls (COW) for the open pit coal mines has been used for decades. They have been used to reduce the negative hydraulic impact to the surrounding area caused by the open pit mining

    Jan 1, 2017

  • DFI
    No. 1 Queens Road - Melbourne, Australia

    By Tom George

    "INTRODUCTIONNo. 1 Queens Rd was an existing 10-storey office building founded on large pad footings. This project involved the construction of a 6-level, 15m (50-ft.) deep basement excavated immediat

    Jan 1, 2005

  • DFI
    Design Of Cost-Effective Retaining Wall At The Junction Of Approach Bridge Over A Ramp

    By Dr. Anup Kumar Mandal, Partha Roy, Shuvranshu Kumar Rout, Dipak Mandal, Biswajit Das

    Installation of a new scalping station with bunker, apron feeder, scalping screen, ramp -retaining wall and approach bridge was planned in an existing integrated complex of phosphate fertilizer at a r

    Sep 1, 2022

  • DFI
    The Miniaturization Of Diaphragm Wall Technique – The Cube System

    By Leonhard Weixler, Alexander Blatt, Franz-Werner Gerressen

    Diaphragm wall technique is usually used to construct structural elements in the ground, commonly used for retention systems, permanent foundation elements or deep ground-water barriers, named Cut-Off

    Oct 1, 2022

  • DFI
    Trouble In Paradise: Micropiles As A Solution To Challenging Geotech And Steep, Rugged Terrain On The Island Of Oahu

    By Steve Davidow, Scott Tunison

    As the demand for electric power grows and generation facilities are constructed in more remote areas, the industry faces an increasing number of foundation construction challenges. The importance of

  • DFI
    D-Wall Extreme – Contrast Between Going Deep And Getting Small

    By Alexander Blatt, Franz-Werner Gerressen

    Diaphragm wall technique is usually used to construct structural elements in the ground, commonly used for retention systems, permanent foundation elements or deep groundwater barriers, named Cut-Off-

    May 1, 2022

  • DFI
    The Effc/Dfi Guide To Support Fluids For Deep Foundations

    By Chris Harnan, Christophe Justino

    The European Federation of Foundation Contractors (EFFC) and the Deep Foundations Institute (DFI) jointly published Edition 1 of the ‘EFFC/DFI Guide to Support Fluids for Deep Foundations’ in April 20

    May 1, 2022

  • DFI
    Ground Improvement Using Stone Columns To Mitigate Liquefaction Potential Of Fine Sand By Wet Top Feed Vibro Replacement Method – A Case Study

    By Parameswaran V. S, Anshuman Singh

    This is a case study on ground improvement using Stone columns at Kokrajhar in Assam which comes under seismic Zone V as per IS: 1893. The strata at site comprised of mostly fine sands with low SPTN v

    Nov 1, 2022

  • DFI
    Forensic Evaluation Of Bored Piles For A Factory Project At Jhajjar

    By Sanjay Gupta, Sorabh Gupta, Ravi Sundaram

    A geotechnical forensic evaluation of piles for an industrial facility in Haryana was performed to assess the quality of the piles and to evaluate piles installed using two different types of rigs. Lo

    Sep 1, 2022

  • DFI
    Challenges and Lessons Learned from Shoring Design of 2nd / Broadway Metro Station

    By Babak Mamaqani, Pirooz Barar

    Regional Connector Transit Corridor (RCC) is part of the Los Angeles metro expansion project under construction which adds three new stations into the system. PB&A was responsible for the design of th

    Jan 1, 2019

  • DFI
    Gowanus Pumping Station; Jet Grout Bottom Seal and Deep Support Columns

    By Paul C. Schmall, Kevin Clarke, Paul J. Lewis, John M. Stanbury

    "The $200M rehabilitation of the more than 100-year-old Gowanus Flushing Tunnel and pumping station located on the Gowanus Canal in Brooklyn, NY required deep excavations in an extremely congested urb

    Jan 1, 2016

  • DFI
    Caveat Emptor Or A Buyer's Guide To Pile Integrity Testing - Introduction

    By Joram M. Amir

    During recent years, the integrity testing of piles has made considerable progress. With the availability of portable and powerful computers, practically all integrity testing equipment is now digital

    Jan 1, 1999

  • DFI
    Foundations Of The 'Kö-Galerie' In Düsseldorf Using Top/Down Building Technologies

    By P. Arz

    With a total of five basement levels, ground floor and a further six levels above grade, construction of the Kö-Galerie building, on the Königsallee, in the centre of Düsseldorf, was completed with al

    Jan 1, 1989

  • DFI
    Low Overhead Secant Piles Drilled From Within A Shaft

    By Allen B. Stanton, Parthiv Brahmbhatt, Michael Grimm, Stanley L. Worst

    Constructing a circular shaft consisting of secant piles has its own complications which make it more difficult than typical drilled shaft construction. Add to that performing under low overhead power

    Oct 1, 2022

  • DFI
    Installation Of Three Up To 120M Deep Diaphragm Wall Shafts, With Diameters Between 8M And 35M At Woodsmith Mine In North Yorkshire (England)

    By Gustav Jahner, Michael Baltrusch, Norbert Hoffmann

    Near the port city of Whitby in the north-east of England, Anglo American (AA) is setting up the deepest mine in the UK, which will have a depth of 1,500m. The purpose of the project is to extract and

    Sep 1, 2022

  • DFI
    Army Corps Mega Projects Benefits From Innovative Foundations

    By Dale Berner, Michael O’Sullivan

    "This paper focuses on lessons learned from the innovative designs, in-the-wet construction methodology and modified foundation conditions, for two United States Army Corps of Engineers, USACE, Megapr

    Jan 1, 2017

  • DFI
    Adaptive Design and Contractual Approaches to Address Geotechnical Uncertainties in a Design-Build Ground Improvement Project

    By Kalyani Devabhaktuni, Mike Minton, Mark T. Howe, Yan Zhang

    During the procurement phase of a Design-Build (DB) project, design-build contractors must often commit to a fixed price based on limited or incomplete geotechnical information. This lack of informati

    Jan 1, 2019

  • DFI
    Inference in the Detection of Pile Integrity Defects Using Current Quality Control Methods

    By T. Wulleman, M. Ansriou

    Integrity testing is a primary quality control check on a product that is for the most part not accessible to visual examination. Their cost can be expensive when using direct methods of inspection (l

    Jan 1, 2019

  • DFI
    Protection of Waterfront Properties by Pressed-In Sheet Pile Seawalls

    By Ian Vaz, Takefumi Takuma, Rafael Holcombe, Chris DellAringa

    "This paper will discuss the successful installation of seawalls for the first phase of a project in Long Beach in California known as the Naples Island Permanent Seawall Repair – Phase 1. How an unco

    Jan 1, 2016