Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
- 
                     Pile Design Philosophies For Coralline And Weak Carbonate Rocks Pile Design Philosophies For Coralline And Weak Carbonate RocksBy Rahul Wankhade, Sunil S. Baswankar, Aditya S. Kharatkar Despite advances in pile design methodologies and piling techniques at site, difficulties and uncertainties still exists for design of piles particularly in coralline deposits and weak carbonate rocks Sep 1, 2022 
- 
                     A Coupled FE-BE Formulation For The Prediction Of Vibrations Due To Vibratory And Impact Pile Driving A Coupled FE-BE Formulation For The Prediction Of Vibrations Due To Vibratory And Impact Pile DrivingBy H. R. Masoumi This paper presents a numerical model for the prediction of free field vibrations due to vibratory and impact driving. As the focus is on the response in the far field, where deformations are relative Jan 1, 2006 
- 
                     Foundations Of Self Drilling Micropiles In 4G And 5G Network Telecom Masts In India Foundations Of Self Drilling Micropiles In 4G And 5G Network Telecom Masts In IndiaBy Annika Gram, Teddy Johansson, Lutfi Ay Micropiles transfer tension or compression forces as well as cyclic loads into the ground via skin friction. The Self Drilling Micropiles (SDM) can be utilized for permanent applications. The hollow b Nov 1, 2022 
- 
                     Heating And Cooling Structures With Steel Pile Foundations Closed Loop Standing Column Well Technology Heating And Cooling Structures With Steel Pile Foundations Closed Loop Standing Column Well TechnologyBy Paul Suver The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing co 
- 
                     Soil-Structure Interaction For A Tension Pile Pulled With Strand Soil-Structure Interaction For A Tension Pile Pulled With StrandBy Chandramohan P. V A unique tension pile where the pull is at a point a certain distance below the top of the pile. The pull is transferred by a cable consisting of high tensile strands. The HDPE duct of the cable preve Nov 1, 2022 
- 
                     Application of the Cement Deep Mixing Method for Shallow Water Areas Using the CDM-Float Technique Application of the Cement Deep Mixing Method for Shallow Water Areas Using the CDM-Float TechniqueBy Takeo Asanuma, Sachihiko Tokunaga, Hirofumi Taguchi, Yasuhiro Ootsuka, Yosuke Tanaka The Cement Deep Mixing Method (CDM Method) is a ground improving method that has been used for mainly offshore sites to strengthen the soft ground below the sea bottom by injecting and adequately mixi Jan 1, 2015 
- 
                     R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and Performance R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and PerformanceBy Michael Cianchetti, Nadir Ansari, Matthew Janes "PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations Jan 1, 2007 
- 
                     Rectification Measures And Restoration Of Distressed Pump Foundations Rectification Measures And Restoration Of Distressed Pump FoundationsBy V K. Panwar, Sampat Raj At a Fertilizer plant located in the southern part of India, 74 numbers of pump foundations have shown non-uniform settlements causing the tilting of pump foundations under self-weight primarily due t Nov 1, 2022 
- 
                     Investigations on the Distress to the Pavements/PQC Slab around Monorail Piers, Wadala, Mumbai Investigations on the Distress to the Pavements/PQC Slab around Monorail Piers, Wadala, MumbaiBy Unnikrishnan Nair, Sandeep S. Nikam, Sanjay D. Patil, Prabir C. Basu "Mumbai Metropolitan Region Development Authority (MMRDA) entrusted to implement Monorail Systems in various parts of Mumbai Metropolitan Region (MMR) with the objective to supplement the present tran Jan 1, 2015 
- 
                     Numerical Analysis Of Mono And Group Suction Piles Under Lateral Loadings In Layered Deposits Numerical Analysis Of Mono And Group Suction Piles Under Lateral Loadings In Layered DepositsBy Juhyung Lee Numerical analyses were performed to analyze the behavior of two different type of suction piles (mono type and group type) under various soil layer conditions (uniform silty clay layer, uniform silty 
- 
                     Numerical Analysis of Mono and Group Suction Piles under Lateral Loadings in Layered Deposits (6db428d8-c029-43b4-b834-4c0cdce8dd47) Numerical Analysis of Mono and Group Suction Piles under Lateral Loadings in Layered Deposits (6db428d8-c029-43b4-b834-4c0cdce8dd47)By Ilhan Chang, Ernest Nsabimana, Kiseok Kwak, Juhyung Lee, Young-Hoon Jung "Numerical analyses were performed to analyze the behavior of two different type of suction piles (mono type and group type) under various soil layer conditions (uniform silty clay layer, uniform silt Jan 1, 2017 
- 
                     3D FEM Modelling of a Ground Improvement Solution 3D FEM Modelling of a Ground Improvement SolutionBy Yazen Khasawneh, Osvaldo P. M. Vitali, John E. Agee, Mohammad Nassim A 3D FEM modeling of a ground improvement solution for an ice rink slab with stringent differential settlement limits is presented. Due to the complexity of the geotechnical conditions and strict defo Sep 8, 2021 
- 
                     Three-Dimensional (3D) Limit Equilibrium Method (LEM) Comparative Study of a Landslide Case Study Supported with Piles Three-Dimensional (3D) Limit Equilibrium Method (LEM) Comparative Study of a Landslide Case Study Supported with PilesBy Terence Ma, Seok hyeon Chai, Jeff Lam, Thamer Yacoub, Brigid Cami, Sina Javankhoshdel The Limit Equilibrium (LE) analysis of pile-supported geotechnical structures normally assumes a constant shear force for the pile instead of considering the non-linear capacity of the pile which is r Sep 8, 2021 
- 
                     Analysis of Load Transfer along Large Diameter Bored Piles in Very Dense Sands Analysis of Load Transfer along Large Diameter Bored Piles in Very Dense SandsBy Nabil F. Ismael, Khalid Farraj "The axial load transfer along large diameter bored piles in very dense silty sand was examined by field tests. Two instrumented piles 1.2 m diameter and with embedded length of 18 m and 25 m were loa Jan 1, 2017 
- 
                     CFA Secant Piling In California CFA Secant Piling In CaliforniaBy Philip Derbyshire, Dale J. Scheffler "Continuous Flight Auger (CFA) piling is a variation of Augered Cast-In-Place (ACIP) or augercast piling. In both cases a continuous auger with a hollow stem is used to drill a hole and a pile is form Jan 1, 2005 
- 
                     Installation of 10 Feet Diameter CIDHs in Soft Clay Using Rotator/Oscillator on Trestle Installation of 10 Feet Diameter CIDHs in Soft Clay Using Rotator/Oscillator on TrestleBy Babak Mamaqani, Pirooz Barar The Moanalua trestle spanned over Moanalua Stream, Honolulu, HI and was designed to accommodate construction of five 10 feet diameter cast in drilled hole (CIDH) piers as a part of Honolulu Authority Jan 1, 2019 
- 
                     Accuracy of Low-Strain Pile Integrity Test Results Accuracy of Low-Strain Pile Integrity Test ResultsBy Mahesh Hingorani Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv Jan 1, 2019 
- 
                     Rocky Mountain Arsenal Section 36 Lime Basin Soil Remediation Project – Seepage Barrier Rocky Mountain Arsenal Section 36 Lime Basin Soil Remediation Project – Seepage BarrierBy A. David Miller, Douglas M. Barber "The Rocky Mountain Arsenal was used by the military to produce chemical warfare agents and incendiary munitions for use during World War II and later by private companies for the production of indust Jan 1, 2015 
- 
                     Quality Control and Testing of Jet Grouting and its Interpretation in Relation to the Christchurch Town Hall Restoration Project. Quality Control and Testing of Jet Grouting and its Interpretation in Relation to the Christchurch Town Hall Restoration Project.By David Chadwick, Paul Marsden, Chris Hughes, Mathias Delapille "Following damage caused by the 2011 Christchurch earthquakes, the NZ$127.5million Christchurch Town Hall Restoration project is due for completion in 2018. The building is undergoing extensive repair Jan 1, 1900 
- 
                     Performance Monitoring for Deep Excavations Performance Monitoring for Deep ExcavationsBy Alexi J. Neill "This presentation will showcase two challenging projects with deep excavation support systems in the Atlanta area where state-of-the-art instrumentation and monitoring systems were used to manage ris Jan 1, 2016 
