Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application of High Efficient Fine Screen to Improve the Recovery of Tin Concentrate

    By W N. Qin, B Zhang, W Z. Huang, X S Mo

    Mengzi Mining and Metallurgy Co, Ltd (MMMC) polymetallic ore contains recoverable amounts of tin, lead, zinc, pyrite and other valuable minerals. With the change in orebody, the run-of-mine (ROM) ore

    Sep 1, 2014

  • AUSIMM
    Optical and SEM-Based Microscopy Integration for Optimisation of Geometallurgical Modelling and Ore Deposit Characterisation

    By R Hartner

    Digital optical microscopy (DOM) and automated SEM-based (ASEM) mineralogy systems (MLA, QEMSCAN) have experienced significant developments within the last decade. However these developments have been

    Sep 5, 2011

  • AUSIMM
    New Zealand's Steel Industry and Other Mineral Developments

    Government established and financed the NZ Steel Investigating Co in 1960. Its investigations showed that a steel industry was feasible and desirable based uponNorth Island titanomagnetite ironsands,

    Jan 1, 1993

  • AUSIMM
    Improved Cleaner Circuit Design for Better Performance Using the Jameson Cell

    By R Araya, G Harbort, D R. Seaman, L Huynh, P D. Munro

    In today’s operating environment many conventional cleaner circuits struggle to produce final grade concentrate with acceptable levels of non-sulfide gangue and/or penalty elements. This is primarily

    Sep 1, 2014

  • AUSIMM
    Big Bell Coming Back for Seconds, Thirds and Fourths

    In October 1993 it was decided to undertake the fourth phase of mining at Big Bell. This decision followed the exhaustion of open pit reserves in January 1993. Two stages of mining were proposed for t

    Jan 1, 1998

  • AUSIMM
    Geological Controls on Drilling and Blasting Operations

    By T N. Little

    This review paper presents an integrated and practical insight to blasting geology and its importance. This approach involves developing blasting objective up front and implementing geology specific b

    Nov 8, 2011

  • AUSIMM
    The Past Focuses Support for the Future

    The history and milestones in the evolution of support systems utilised in the mass-mined chrysotile mines of Shabanie and King are discussed in detail. The use of block caving, false footwall or subl

    Jan 1, 2000

  • AUSIMM
    Effect of CaO-FexOy-Al2O3-SiO2 Oxide System on the Reduction of Carbon Composite Pellets

    By H Park, V Sahajwalla

    "Due to the increasing amount of gangues in iron ores, a beneficiation process is required more as a preliminary step for ironmaking process. However, mechanical grinding and washing of iron ore needs

    Aug 12, 2013

  • AUSIMM
    Development of the 1 in 5.3 Conveyor Decline at Ridgeway Gold Mine

    Located 350 km west of Sydney and 20 km outside Orange, NSW, lies the Ridgeway Gold Mine û NewcrestÆs flagship Underground Gold Mine. Key to success at Ridgeway has been the fast tracked development o

    Jan 1, 2002

  • AUSIMM
    Geotechnical Centrifuge Technology for Characterising the Interaction of Tailings and Pore Water over Decadal Time Periods

    By D Anderson, W Timms

    "A geotechnical centrifuge can characterise and model the interaction of tailings and fluids over very long time periods by accelerating drainage and consolidation processes. This technology can be co

    Jul 27, 2015

  • AUSIMM
    Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, Australia

    By T J. Sullivan, H Pinkster, G Swarbrick

    From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o

    Nov 5, 2014

  • AUSIMM
    Incremental Improvement of Grade Control Models Using Resource Data

    By A J. Cornah

    "The mine geologist’s role in classifying ore from waste during grade control represents a critical link in the mining value chain. Any improvement in the ore/waste selection success rate (thus reduct

    Aug 18, 2014

  • AUSIMM
    Optimisation of Circuits for Gold Pressure Oxidation

    By F Saloojee, F K. Crundwell

    Refractory ores need to be pretreated prior to cyanide leaching for acceptable gold recovery. Pressure oxidation is one method of rendering the ores more suitable for cyanidation. The focus of this wo

    Sep 26, 2013

  • AUSIMM
    Kinetics of Collector Adsorption on Mineral Surfaces

    By A Holmgren, W Forsling

    In the present study infrared attenuated total reflection (IR-ATR) was used to monitor the rate of in situ adsorption of heptyl xanthate on a layer of zinc sulfide synthesised on a germanium ATR cryst

    Jan 1, 2005

  • AUSIMM
    Investigation into the Implementation of Sensor-based Ore Sorting Systems at a Block Caving Operation

    By D Elmo, M Scoble, Y Liu, B Klein, J Scholar, S Nadolski

    A cave-to-mill study being conducted at the New Afton block caving operation demonstrated the potential for sensor-based ore sorting equipment to reject waste and improve the grade of feed to the mill

    May 9, 2016

  • AUSIMM
    The Application of Hydromechanical Mine-scale Modelling for Large Block Caving Operations

    By A Flatten, F Reusch

    Recent advances in the disciplines involved in simulating large mining operations provide increasingly precise and accurate methods for the study of cave mechanics; however, in large regional-scale mo

    May 9, 2016

  • AUSIMM
    A Review of the In Situ Stress Database for Tunnel Design in the Hawkesbury Sandstone, Sydney, New South Wales

    By G McKay, M Erskine, S Macklin

    The City of Sydney is currently investing in a number of infrastructure projects that require tunnel excavations within the Triassic Hawkesbury Sandstone. It is generally accepted that this formation

    Sep 17, 2014

  • AUSIMM
    Improving the performance of blind uphole rises at Ernest Henry Mine – a case study

    By T Purvis, Z Liu

    Ernest Henry mine (EHM) is an underground sublevel caving mine located in north-west Queensland with a production rate of 6.4 Mt/a. The mine has sublevels spaced with a 25 m vertical interval. The pro

    Oct 16, 2017

  • AUSIMM
    Starter dyke optimisation with Muk3D and GoldSim

    By C A. Cooper, G A. Suter

    The sizing of a starter dam for a Tailings Storage Facility (TSF) involves balancing many competing demands. It should cost as little as possible, be high enough to store tailings until the first rai

    Jul 23, 2018

  • AUSIMM
    Pasminco Century Mine Open Pit Slope Design ù A Geotechnical Perspective

    The geotechnical factors controlling the design of the open pit slopes of the Pasminco Century Mine near Lawn Hill, Queensland are presented below. Pasminco Century is a stratiform shale hosted zinc d

    Jan 1, 2000