Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Differential Flotation of Copper, Lead, Zinc and Iron Sulphide Minerals at Lake George Mines Pty. Ltd., Captain's Flat, New South WalesBy Nixon J. C, Reynolds C
Three principal features of the ore at Captain's Flat, New South Wales, tend to complicate concentration of the valuable minerals, these being:1. The ore occurs in three more or less separate bod
Jan 1, 1952
-
Commissioning of the Kanmantoo Copper ConcentratorBy J Seppelt
The Kanmantoo Copper Project is owned and operated by Hillgrove Resources Limited and is situated in the Adelaide Hills region in South Australia. Mining in the area has taken place off and on over th
Oct 29, 2012
-
Cable Tunnel VentilationBy P Ridley
EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil
Mar 8, 2011
-
Geometallurgy and Ore Processing of the Hibbing Taconite Lake Superior-Type Magnetite Taconite Deposit, Mesabi Iron Range, Minnesota, USABy J D. Lubben
Hibbing Taconite is a Lake Superior-type granular magnetite taconite deposit occurring within the Biwabik Iron Formation along Minnesota’s central Mesabi Iron Range. The deposit is situated on the nor
Jul 11, 2011
-
The Application of Measurement and Modelling of Sulfidic Coal Wastes at Pacific Coal's Kestrel Mine for Use in Development of a Closure PlanBy T A. Short, P L. Brown
Kestrel Mine co-disposes around 1.5 Mt of fine (2SO4/t and to date around 9 Mt has been deposited. The mine plans to co-dispose of approximately 39 Mt of material, creating a dump with a maximum heigh
Jan 1, 2003
-
The evolution of the Cadia 40-foot SAG mill to treat the Cadia East orebody: a case study of incremental change leading to operational stabilityBy J Seppelt, B Akerstrom, A Rice, J Bubnich, T Waters
The Concentrator 1 plant at Cadia transitioned from Cadia Hill open pit to the Cadia East block cave ore body in 2013. As a result of this change, major plant upgrades were required to achieve the des
Aug 29, 2018
-
Superior Productivity and Margins Using Modern Mining Management SystemsWith commodities suffering dramatically low real prices, mining business margins are under intense scrutiny. Unfortunately, management systems developed early this century for manufacturing are drivin
Jan 1, 1999
-
Synergic Effect of Collector and Frother on Froth Stability and Flotation Recovery - An Industrial CaseBy S Farrokhpay, M Zanin
Although it is well understood that in flotation collection zone and froth zone are deeply interconnected, and reagents (and in particular collectors and frothers) cannot be selected without consideri
Oct 29, 2012
-
Spontaneous Fire Risk Rating of a Colliery Proposed to be Developed by Short Wall Method of MiningBy Sen S. K, Banerjee D. D, Nandy D. K
It has been stressed that the intrinsic spon- taneous heating characteristics of a coal is not enough in predicting spontaneous fire risk of a mine. The influence of extraneous conditions created f
Jan 1, 1988
-
A Decade of Gravity Gold RecoveryBy A Bax, G Wardell-Johnson, W P. Staunton, J McGrath, J J. Eksteen
Since 2001, the AMIRA P420 gold processing technology project series has been studying the recovery of gold using gravity devices, with particular emphasis on the centrifugal units, Knelson and Falcon
Sep 26, 2013
-
In situ dynamic testing of mesh straps and W-strapsBy P Mikula, B Darlington, J Graham, P Young
In underground mines experiencing dynamic events, there is an ever-present challenge to design and maintain a capable ground support system. One key component of ground support systems is surface supp
Nov 29, 2022
-
Minimum sample mass from reverse circulation grade control drilling at Rocklands copper projectBy M G. Hawtin
The Rocklands copper project is a multilode, iron oxide copper gold (IOCG) + cobalt mineralised system located in the Eastern Fold Belt of the Mt Isa Inlier. Rocklands orebodies cover a range of oxida
Sep 20, 2017
-
Practical measures of process efficiency and opportunityBy G R. Ballantyne, A N. Mainza, M S. Powell, M Evertsson
Quantifying the performance of a comminution circuit relative to the potential that can be achieved is a standard requirement in justifying operating practice (the stick) and seeking operational upsid
Aug 24, 2022
-
Field Trial of CSIRO VirtuoBlast Technology at the KCGM Super Pit - Part 1: Application to Pre- and Post-Blast MeasurementBy Y Wei, P Soole
This paper gives a brief description of VirtuoBlast technology ù a new, automated and highly interactive stereo vision technology which has been developed in CSIRO Exploration and Mining. VirtuoBlast
Jan 1, 1999
-
Transfer Function – New Method to Accurately Predict Resonant Frequencies of a HighwallBy R Osterman
As mining companies have to go deeper in search of ore and coal, the importance of protecting the highwall increases. Wall fatigue also increases with importance of the long life expectancy of a highw
Aug 24, 2015
-
Sampling and Measurements in the Reaction Shaft at Olympic DamBy B Washington, A Campbell, R Taylor
A sampling and measurement program was undertaken on the reaction shaft of the Olympic Dam copper flash smelting furnace. The object of the work was to provide information to validate a mathematical m
Jan 1, 2005
-
In-Line Pressure Jig Preconcentration Plant at the Pirquitas MineBy A H. Gray
Gekko Systems Pty Ltd engaged in the test work, design, manufacturing and commissioning of the pre-concentration plant at Silver Standard Resources Inc’s Pirquitas mine in the north western Jujuy prov
Aug 8, 2011
-
The Perseverance Gold Copper Deposit – A New Peak Mines ChallengeBy B Taylor
The Perseverance deposit is the most southerly known economic copper/gold deposit within the Cobar gold field. The deposit is situated approximately 12 km to the south-southeast of Cobar and is essent
Aug 22, 2011
-
Life cycle GHG emission considerations in overland conveyor designBy T Hicks
Designers of mining facilities play a significant role in defining the overall mine greenhouse gas emissions performance. This demands an appreciation of all the greenhouse gas emissions sources, incl
Sep 1, 2024
-
Laboratory Testing and Stability Analysis of Paste Backfill at the Golden Giant MineBy W F. Bawden, J T. Paynter
This investigation involves laboratory testing and stability analysis of paste fill at the Golden Giant Mine. Site-cast samples are tested in unconfined, confined, and consolidated-undrained triaxial
Jan 1, 1998