A Cost Benefit Analysis to Explore the Optimal Number of Blast Movement Monitoring LocationsBy J Loeb, D Thornton
Blast movement measurement is a key component of grade control, enabling mines to carry all of the precision involved in locating ore blocks, through a chaotic blast, to production. A monitoring syste
Aug 18, 2014
-
Soft Computing Approach to Predict Blast-induced FlyrockBy N Gupta, R Trivedi, S Bhandari
Managing blasting operations in four mines surrounded by villages is a challenging task. This study aims to compare the blast-induced flyrock as observed in opencast mines by predicting flyrock distan
Aug 24, 2015
-
Dressing of Carbonates by DecrepitationBy Stevak D, Plesingerova B, Ellias K, Tkacova K
This paper presents information on the processing of minerals by decrepitation that can be an integral part of their mineral dressing. In the case of carbonates, processing by decrepitation is a spe
Jan 1, 1993
-
Impurity capacities of non-ferrous slagsBy R G. Reddy
The complexity in treating environmentally harmful impurities such as As, Sb, Bi from the base metal matte or metal in the smelting stage are responsible for the high cost of the refining process. The
Aug 21, 2024
-
Initial Thoughts on Application of the Volume Loss Approach for Estimates of Surface Settlement Due to Tunnelling in Weathered RockBy S Kowalczuk, S V. L Barrett
The potential for adverse surface settlement during tunnelling in soil and rock poses a significant risk to the successful completion of any tunnelling project. Undesirable ground movement may lead to
Sep 17, 2014
-
Acid Rock Drainage Prevention Using Inert Gas Mixture TechnologyBy H Barrie, L Ameglio
"Current methods for acid rock drainage (ARD) mitigation revolve around insulation of the waste from oxygen in the atmosphere with water and dry (soils and liners) covers. Both are of limited effectiv
Jul 27, 2015
-
Analysis on composition and physico-chemical property change of PbO-bearing slag in Pb smeltingBy G Cao, Y R. Cui, J X. Zhao, H P. Gui, G H. Wang, Z M. Wang, M M. Ren, B Li
Pyro-metallurgy is still the main process for lead production and a lot of lead direct smelting processes have been developed in recent years. All the processes will experience two steps in common. Th
Aug 21, 2024
-
Fine grinding circuit process improvement at the Karara mine concentratorBy H Ishikawa, H Zhou, M Spagnolo, R Halomoan, S Palaniandy
The Karara Mine concentrator commenced operation in November 2012 to produce high-grade magnetite concentrate. The circuit consists of three stages of comminution plus magnetic separation at each stag
Sep 11, 2017
-
Impact of Co-disposing Mixed Plant Rejects on Spoil Pile SettlementsBy D J. Williams, A K. Kho, A Shokouhi, N Tucker
The disposal of dewatered coalmine tailings and coarse reject within spoil piles is gaining popularity as a means of eliminating separate surface tailings storage facilities or dams. The contrasting c
Jul 27, 2015
-
Determination of cyanide and potentially toxic elements in gold tailings at Barberton, Mpumalanga, South AfricaBy K E. Mudzanani, T A. M Msagati, D T. Maiga, T T. Phadi, M R. Letsoal, B M. Chabalala, S W. Limani
This paper addresses critical environmental, health, regulatory and scientific concerns related to gold mining activities in the specific area of Barberton, Mpumalanga, South Africa. The paper thus ca
Apr 16, 2024
-
The Simulation of a CIP Plant Incorporating Shifting Equilibria Dependent on Cyanide and CopperBy R C, K L. Rees, J S. J van Deventer
In contrast with previously published models for the carbon-in-pulp (CIP) process, the model proposed in this paper incorporates film transfer, intraparticle diffusion, simultaneous leaching, preg-rob
Jan 1, 1998
-
Production Schedule Optimisation – Meeting Targets by Hedging against Geological Risk while Addressing Environmental and Equipment ConcernsBy M Spleit
A long-term production schedule for the LabMag iron ore deposit in northern Quebec, Canada is derived using stochastic integer programming. The optimisation formulation maximises the schedule’s net pr
Nov 24, 2014
-
An Integrated Optimisation Study of the Barrick Osborne Concentrator: Part A - Crushing and GrindingBy M Korte, J McMaster, C Brent
The Barrick Osborne concentrator has gone through a number of upgrades since commissioning and has increased production from the original 119 t/h design capacity to a milling throughput of 265 t/h in
Jan 1, 2009
-
-
From Magnetite to Chalcopyrite – A Story of Versatility and Efficiency at Glencore’s Ernest Henry Mining?OperationBy K Barns, H Law, T Whebell, P Scobie, T Perkins, J Siliezar, M Larson
With processing a variety of orebodies at Glencore’s Ernest Henry Mining (EHM) has come a changing mineralogy and more complex requirements for treatment in the concentrator. From mid-2013 and into 20
Sep 1, 2014
-
The Use of Geotechnical Instrumentation to Optimise an Engineered Mine Design at Beaconsfield Gold Mine, TasmaniaBy P B. Hills, R J. Walton
Geotechnical instrumentation has been implemented as a key step for monitoring and optimising an engineered mine design for managing seismicity at the Beaconsfield Gold Mine. Measurements of displacem
Jan 1, 2008
-
Use of ?Tunnel Boring Machines in the Mine EnvironmentBy D Mather, H R. Asche
"In the civil tunnelling field, the use of tunnel boring machines (TBM) has now overtaken the use of conventional excavation methods (drill and blast / roadheader). This is due to a number of reasons,
Sep 17, 2014
-
Integrated Optimisation of Grinding and Flotation CircuitsBy P Holtham, K C. Runge, E Tabosa
Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro
Sep 1, 2014
-
Selecting Optimal Operating Conditions for Knelson ConcentratorsBy G K. N Subasinghe
Metallurgists operating Knelson Concentrators (KC) often rely on manufacturerÆs recommendations for selecting operating parameters, such as fluidising water flow rate and cycle time. Recent studies ha
Jan 1, 2006
-
The importance of rate of rise in life-of-mine planning of an upstream raised tailings storage facility – a case studyBy D A. Williams, P J. Chapman
The acceptable rate of rise of the tailings beaches on upstream-raised tailings storage facilities (TSFs) is critical to life of mine planning. This is illustrated through a case study in Western Aus
Jul 23, 2018