Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Aspects of In-Seam Development for Subsequent Full Extraction

    Severe development difficulties were experienced soon after in-seam mining commenced at Appin Colliery in'1962. Thirteen years later no significant pro- gress had been made in overcoming some as

    Jan 1, 1976

  • AUSIMM
    The Race to Finish - From Design to Completion - 5 Km of Three Lane Road Tunnel in Three Years

    By G Munro

    he Melbourne City Link project will complete a missing link between two existing major freeways in the Melbourne road network, providing a much needed bypass of the Central Business District for throu

    Jan 1, 1999

  • AUSIMM
    Chlorine Based In-Situ Leaching of Alluvial Gold Deposits

    Alluvial mining even of shallow deposits is often economically a marginal proposition and causes significant disruption of the land surface through the need for large scale excavation. In-situ leach

    Jan 1, 1992

  • AUSIMM
    MERLIN: The Minerals and Energy Resources, Location and Information Network

    MERLIN, the Queensland Department of Minerals and Energy's corporate geographic information system, provides ready access to all georeferenced data held by the department. Its aim is to provide

    Jan 1, 1995

  • AUSIMM
    Developments in Australian Spiral Separator Technology

    By Stitt P. H

    This paper provides a brief historical review of the invention of the spiral separator and its adoption into Australian metallurgical practice. The purpose of the review is to demonstrate that spira

    Jan 1, 1988

  • AUSIMM
    The Murrin Murrin Nickel Cobalt Project

    By Fazakerley VW

    The Murrin Murrin deposit is located about 210 km NNE of Kalgoorlie and 50 km E of Leonora in the North Eastern Goldfields region of Western Australia at latitude 28¦ 50'S. longitude 121¦ 54&a

    Jan 1, 1996

  • AUSIMM
    Initial Operation of the Hismelt Research and Development Facility

    By Winrove G. S, Herdie G. J, McCarthy C. A

    Production of hot metal from the Hlsmelt Research and Development Facility at Kwinana, Western Australia commenced in October 1993. The stand-alone facility is a unique, coal-based, integrated ironw

    Jan 1, 1995

  • AUSIMM
    The Geology of the Quioma Lead-Zinc-Silver Mine Asientos Mining District, Bolivia

    The Quioma Mine is located along the axis of the Cordillera Oriental, 130 km southeast of Cochabamba, South Central Bolivia. Silver, lead, zinc, antimony, and gold have been intermittently produce

    Jan 1, 1987

  • AUSIMM
    In - Pit Crushing and Conveyor Transportation of Coal at Ulan

    Initial coal production at Ulan was solely from underground mines. A significant increase in demand for steaming coal in the late 1970's emphasised the need to further expand production and led t

    Jan 1, 1985

  • AUSIMM
    Processing Copper-Gold Ores with Ammonia or Ammonia-Cyanide Solutions

    By La Brooy S R, Fenton K

    A low grade copper flotation tailing from Telfer containing 1.2% Cu as chalcocite and cuprite and 5 gt-t Au was leached with ammonia, cyanide and ammonia-cyanide mixtures to extract copper and/or go

    Jan 1, 1991

  • AUSIMM
    The Composition of Disseminated, Gold-bearing Sulfides within the Three-dimensional Framework of Bulk Au, As and Sb in the Globe-Progress Orogenic Gold Deposit, Reefton Goldfield, New Zealand

    By C McIntosh, M Carder, P M. J Durance

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Disseminated, gold-bearing sulfide minerals hosted in sheared, wall rock metasediments and

    Mar 18, 2015

  • AUSIMM
    Planning and Designing Cavities for Underground Power House in Himalayas

    By Garg R. K

    Himalayan ranges on the northern border of India are source of many perennial rivers and suitable sites for large dams have been located therein. However, Himalayas are young mountains and compris

    Jan 1, 1987

  • AUSIMM
    Minimising Blast Damage to the Extraction Level of Northparkes Mine's E26 Block Cave

    Optimal drill and blast design is a process often neglected by many underground hard rock mines. This is even more important to the new mine where ring designs need to be implemented and refined in

    Jan 1, 1995

  • AUSIMM
    Shotcrete Lining Design for Underground Excavations in Rock û The Current State of Practice

    By B Bendtsen, L McQueen

    The use of shotcrete as an efficient means of both temporary and permanent ground support has continued to grow over the last 30 years, with its use underground now commonplace around the world. Howev

    Jan 1, 2008

  • AUSIMM
    Design of Shallow Caverns in an Urban Environment

    By S Pollak, A Amon

    This paper describes the current and finished design work which has been performed for shallow rock station caverns for New York CityÆs first new subway construction in 60 years. A new robust, sophist

    Jan 1, 2008

  • AUSIMM
    Roasting and Treatment of Auriferous Flotation Concentrates

    This paper is intended to continue the subject in the light of recent work, from where it was left at the conclusion of the discussion on the excellent paper by the late Mr. Noel Haszard. The position

    Jan 1, 1939

  • AUSIMM
    Rapid Sealing with Parachute Stoppings

    By Buizen M, Eagleton A. C

    The results of calibration trials conducted on parachute stoppings both overseas and in Australia under a recently completed NERD&DC grant, are presented. Applications of parachute stoppings, for

    Jan 1, 1988

  • AUSIMM
    CaroÆs Acid its Introduction to Uranium Acid Leaching in Australia

    After extensive testing and a period of plant trials to establish the benefits of Caro's acid (H2S05) as an alternative oxidant, Queensland Mines Limited (QML) decided to replace pyrolusite w

    Jan 1, 1984

  • AUSIMM
  • AUSIMM
    Health Monitoring of Underground Mining Machines

    By Steinbrucker G

    Improvements in mining by the application of electronics necessitates analy-sis of the objectives and problems. A detailed analysis has shown that increased tunel-ling performance is one of the most i

    Jan 1, 1985