Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    High-grade Porphyry Copper-gold Mineralisation in North-west Ecuador – The Alpala Cu-Au Porphyry Discovery

    By J Ward, B Rohrlach, B Rosero, J Silva, O Poma

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Alpala copper-gold deposit is a recent, high-grade porphyry Cu-Au discovery located in

    Mar 18, 2015

  • AUSIMM
    Screening Experience at Australian Iron and Steel, Port Kembla

    The screening of iron ores, sinter and coke, and investigations undertaken to improve screening efficiency and cloth life are discussed. The major modifications to coke screening proposed with the

    Jan 1, 1984

  • AUSIMM
    Integral Pressure Strip/Electrowin Circuit for Gold Recovery from Activated Carbon

    By Macaulay J

    The recovery of gold from cyanide liquors is frequently effected by using activated carbon. Process economics however require non destructive methods of gold extraction from the carbon so that it may

    Jan 1, 1984

  • AUSIMM
    Design Investigations for a Steel Lined Pressure Tunnel in the King River Power Development, Tasmania

    The King River Power Development on the West Coast of Tasmania has involved the storage of the waters of the King River in the new Lake Burbury and their diversion through a 7 km tunnel to a 144 MW po

    Jan 1, 1993

  • AUSIMM
    The Use of Decline Haulage at Mount Charlotte to Enable Production from Horizons Below the Underground Crusher

    The low grade Mount Charlotte orebody was first mined with minimum capital expenditure by mechanised cut and fill stoping. The lower block was prepared simultaneously for open stoping by shaft sink

    Jan 1, 1973

  • AUSIMM
    The Geotechnical Input into the Mining Process at George Fisher South Mine

    Geotechnical input is interwoven into the mining process at George Fisher South Mine from the planning and design of working areas to the closure of worked out areas and maintenance of life of mine an

    Nov 25, 2010

  • AUSIMM
    Reflections on Gold Occurence at Bendigo

    Cessation of mining on the Bendigo goldfield makes it evident that, as the older generation fades away, knowledge of the famous Bendigo saddle reefs will be limited in the future by their written reco

    Jan 1, 1961

  • AUSIMM
    Upper Waimangaroa Northern Opencast Mine: An Overview

    The Upper Waimangaroa mining permit is part of the Buller Coalfield and lies on the eastern side of the Stockton-Denniston Plateau. The mining permit area is estimated to contain a total in-ground coa

    Jan 1, 1998

  • AUSIMM
    Heat Transfer Mechanism in Ignition of Nickel Sulphide Concentrate under Simulated Flash Smelting Conditions

    For small particles of niekel flotation eoncentrate (av. size 50 pm) the predominant heat transfer mechanism under suspension smelting conditions, prior to ignition, is conduction from the gas and not

    Jan 1, 1979

  • AUSIMM
    Sampling, Corporate Governance and Risk Analysis

    By G J. Lyman, F S. Bourgeois

    As the prices of metals slide, financial control of mineral processing operations becomes more and more important. Control of a mineral processing operation implies measurement of grades, recoveries a

    Sep 7, 2015

  • AUSIMM
    Python Underground Processing Plant Critical Design

    Python Underground Processing Plant Critical Design The use of continuous gravity recovery in combination with a controlled breakage fine crushing and screening system followed by flash flotation has

    Sep 13, 2010

  • AUSIMM
    Structural Controls on Mineralisation at the Broken Hills Epithermal Au-Ag Deposit, Coromandel Peninsula, New Zealand

    By J Mauk, J Rowland, S Rabone

    Most epithermal Au-Ag deposits in the Hauraki Goldfield are hosted in late Miocene andesites. Broken Hills is an exception, being one of the few economic deposits hosted in rhyolite. Investigation of

    Jan 1, 2003

  • AUSIMM
    The Relation Between Faulting and Mineralization at the Cowarra Gold Mine in New South Wales

    The Cowarra gold mine is at latitude 36°O'S. and longitude 149°19'E. which is roughly 20 miles north-north-east of Cooma.The deposit was· originally worked towards the end of

    Jan 1, 1965

  • AUSIMM
    Taxation of Mineral Mining Operations in New Zealand

    Consents Required for Overseas Persons Overseas Investment Regulations 1

    Jan 1, 1982

  • AUSIMM
    Capping Stations on Broken Hill South Ltd.

    In the Broken Hill South mine tile practice of issuing to the miner a quantity of fuse and a box of caps from which he made up the "rods" required for a particular blast, has been abandoned.

    Jan 1, 1932

  • AUSIMM
    Rheological Behaviour of Clay-Rich Gangue Mineral Dispersions During Hydrometallurgical Treatment

    Rheological Behaviour of Clay-Rich Gangue Mineral Dispersions During Hydrometallurgical Treatment Alumino-silicate minerals invariable may present an intractable challenge in hydrometallurgical opera

    Sep 13, 2010

  • AUSIMM
    Off-Grid Solar in the Mining Sector - Can Renewable Energy Reduce your Operating Costs?

    By C Chambers

    "AustraliaÆs mining sector faces challenges to its competitiveness; operating costs are being adversely affected as a result of volatile commodity prices and growing international market pressures.Die

    Jul 15, 2013

  • AUSIMM
    Predicting Water Recovery from Flotation Cells

    Predicting Water Recovery from Flotation Cells

    Sep 13, 2010

  • AUSIMM
    Coal Ash Disposal at Rotowaro Minesite: A Reference Condition Approach to Setting Boron Criteria and Assessing Environmental Effects

    By S Speed, N Corlis, A Goldstone, G N. Browne, M Fitzpatrick

    In 2005, Solid Energy New Zealand Limited obtained non-notified consent for the disposal of 1Mt of coal ash at the Rotowaro minesite, forming part of a coal supply agreement with the Huntly Power Stat

    Jan 1, 2006

  • AUSIMM
    The Glass Sand Industry in Australia - Production, Processes and Markets

    By R G. Richards

    The Australian glass sand industry produces some 2.8 million tonnes per annum of silica sand, of which about 2.0 million tonnes are exported and the rest is for the domestic market. Approximate produc

    Jan 1, 1990