Search Documents

Sort by

  • SME-ICGCM
    Optimization of the Stress Control Method to Improve Productivity and Safety in Underground Coal Mining

    By Shosei Serata

    The Stress Control Method improves productivity and safety in underground coal mining. The method stabilizes the roofs and floors of mine openings in both shallow and deep coal beds, regardless of whe

    Jan 1, 1986

  • DFI
    Report On An Instrumented Continuous Flight Auger Test Pile At Ascot.

    By Peter O. Wilkinson

    Ascot Racecourse in the UK is a major international venue for horseracing. The racecourse is being redeveloped to provide entirely new public facilities. The development includes the construction of a

    Jan 1, 2006

  • DFI
    Methods Of Constructing Concrete Piles On Heavily Contaminated Sites

    By N. C. Matheson

    The West's Shell Pile has been used on sites with very soft ground conditions for over 60 years. Fibre reinforced precast concrete shells 900mm long are threadled onto an internal mandrel which c

    Jan 1, 1989

  • CIM
    Using Millmapper ™ to Reduce Milling Costs and Improve Performance

    By Tom Gabardi, Peter Clarke

    "MillMapperTM is a new 3D laser scanning technology that has only recently been introduced into the North American mining industry. It enables mill operators to gain a much more complete understanding

    Jan 1, 2012

  • SME
    Evaluation Of Alternative Shaft Sinking Methods For Nuclear Waste Repositories

    By Stephen Phillips, Luigi P. Gonano

    Vertical circular shafts have been proposed for multiple access to high level nuclear waste deep geologic repositories. Shaft construction is a critical path item in the commissioning of a repository.

    Jan 1, 1983

  • SME
    Observations on the Prospectors and Developers Association Conference

    By Bruce Geller

    The 2004 Prospectors and Developers Association of Canada (PDAC) conference contained an air of optimism and excitement that has not been seen since 1997. Many segments of the mining industry are ali

    Jan 1, 2004

  • AUSIMM
    Application of Risk-Cost-Benefit Analysis to Highway Subsidence Due to Mining

    By J Joy, A Bye, G V. Kizil

    This paper demonstrates an application of a recently developed Risk-Cost-Benefit (RCB) Framework to environmental risk management in the mining industry. The environmental application of the RCB Frame

    Jul 10, 2012

  • SME
    Urban Blasting Essential to Schedule Driven West Area CSO Tunnel and Pumping Station Project

    By James McNally, Adam Stremcha, John MacGregor

    With 13.7km of TBM tunneling in Atlanta’s hard gneiss well under way, drill and shoot work continues on several sites throughout the city. In order for the City of Atlanta to meet the consent decree i

    Jan 1, 2007

  • DFI
    Mission Valley Viaduct Piledriving - 1998 DFI Conference Seattle, Washington October 8, 1998

    By David A. Jack

    The Mission Valley Viaduct is located in San Diego, California. This structure is the intersection of Interstate 8 and 805. The project consists of the main viaduct, 8 connecting ramps, and one highwa

    Jan 1, 1998

  • IOM3
    Tunnelling '91, sixth international tunnelling symposium held in London, 14-18 April 1991: report of the proceedings of the symposium

    By G. E. Pearse

    Reports, discussions, a written contribution and two written replies are presented from 11 sessions on: Safety and compressed air; Ground movements; Geotechnical; Channel Tunnel (2 sessions); Machines

    Jun 13, 1905

  • AUSIMM
    Environmental Management Plans to Reduce Mine Closure Costs

    By I F. Bell, K P. Hammerschmid

    Well planned and executed environmental management plans can reduce life-of-mine operating costs and the need to deal with major environmental issues at the time of mine closure. With proper planning

    Jan 1, 1995

  • DFI
    Instrumentation Of Construction Vibrations

    By Mark R. Svinkin

    Construction vibrations may adversely affect surrounding buildings and their effects range from human discomfort and disturbance of sensitive devices to visible structural damage. There is no unique c

    Jan 1, 2002

  • SME
    Conceptual Design for a Deep Underground Science and Engineering Laboratory Cascades

    By Roberto J. Guardia, Robert A. Robinson, John Wilkerson, Wick Haxton

    Several candidate sites have been proposed for the Deep Underground Science and Engineering Laboratory (DUSEL), a facility that would provide over 2000 meters of overburden to screen out cosmic rays t

    Jan 1, 2005

  • AUSIMM
    New Developments in the Use of Victorian Brown Coal

    Topography, location of coal bearing land and existing built-up areas severely restrict locations for overburden disposal and dumping sites north of the Latrobe River clear of the coalfields are a

    Jan 1, 1982

  • IOM3
    Risk assessment applied to coal tonnage estimation in the United Kingdom

    By M. K. G. Whateley, W. Hatton

    Paper presented at the conference: Risk assessment in the extractive industries, held in Exeter, UK, 23-24 March 1994, and first published London: IMM, 1994, preprint volume, 20pp., 31 refs. Estimates

    Aug 1, 1995

  • NIOSH
    RI 3439 Mount Weather Testing Adit Progress Report 1 ? Introduction

    By McHenry Mosier

    The Bureau of Mines, United States Department of the Interior, has established a testing adit on the Government reservation at Mount Weather, Virginia, to facility to research on the fundamental tats

    Jan 1, 1939

  • NIOSH
    RI 3439 Mount Weather Testing Adit ? Progress Report 1 ? Introduction (244437c7-5211-45b3-b7ab-9830c781e41d)

    By McHenry Mosier

    The Bureau of Mines, United States Department of the Interior, has established a testing adit on the Government reservation at Mount Weather, Virginia, to facilitate research on the fundamentals of mi

    Jan 1, 1939

  • NIOSH
    RI 9066 - Pillar Load Transfer Associated With Multiple-Seam Mining

    By R. J. Matetic

    The Bureau of Mines, as part of a program to improve mine planning and development, is currently investigating the effects of pillar load transfer, which can impact mining operations wi.thin a multipl

    Jan 1, 1987

  • NIOSH
    RI 8762 Calamity Hollow Mine Fire Project - (In Five Parts) - 1. Development and Construction of the Burnout Control Ventilation System

    By Meherwan C. Irani

    The Bureau of Mines is developing a new technological approach to handling the problems of fires in abandoned coal mines and waste banks. This new technology involves the accelerated combustion of "wa

    Jan 1, 1983

  • ISEE
    Microseconds Matter in Monitoring

    By Gregory B. Poole

    Data collected with 16K sampling at a variety of blasting sites (construction, quarry, trench, mine) and monitoring locations was analyzed to effectively show the 16 different 1K readings all based on

    Feb 1, 2020