Search Documents

Sort by

  • AUSIMM
    Adoption of an Integrated Mine Water Management Approach Provides Environmental, Social and Economic Benefits

    By R Vleggaar

    In addressing a short-term operational need for the relocation of a tailings storage facility reclaim pond, a mine has achieved a host of water management objectives. Through effective planning and ad

    Jan 1, 2006

  • SAIMM
    The Development Of A Process Flowsheet For The New Anglo Platinum, PPRust North Concentrator, Incorporating HPGR Technology

    By G. Humphries, E. Wolmarans

    The PPRust North project is an expansion of existing operations on the ?Platreef? orebody in the Limpopo Province of South Africa. Anglo Platinum has been mining and processing the Platreef since 1993

    Jan 1, 2006

  • SME
    AA Pad Reclamation Performance Review At Barrick’s Goldstrike Mine

    By K. L. Myers, R. Espell, C. Deringer

    Construction of the AA Pad reclamation was completed in the fall of 2000. Seeding of the ET cover began in the late fall of 2000 and continued through May of 2001. On Saturday afternoon, June 1, 2002,

    Jan 1, 2003

  • ISEE
    Levee Removal by Explosives, Upper Klamath Lake, Oregon

    By Quentin Rhoton

    To benefit two endangered fish species, waterfowl and other wildlife, and water quality in the lake and downstream, the decision was made to remove levees that had been in place since the 1950s. Becau

    Jan 1, 2009

  • SME
    Review Of Current Research On Coal Ash In The United States

    By John F. Slonaker

    This report is a review of current research being conducted in the United States which is intended to increase the utilization of coal ash. In order that this report be as timely as possible, the majo

    Jan 1, 1974

  • SME
    Artificial Stabilization Of A Pit Slope At Twin Buttes, Arizona ? Introduction

    By Ben L. Seegmiller

    The artificial stabilization of a pit slope at the Twin Buttes Mine near Tucson, Arizona has been completed as part of a practical rock mechanics program. The research program began in June 1971 as a

    Jan 1, 1973

  • SME
    Processes In The Formation Of Crystalline Gold In Placers

    By Ronald C. Severson

    Crystals of native gold occur in placer-type deposits. Gold, as a pure metal, is the most malleable metal known; therefore, delicate gold crystal forms should not survive mechanical transport and conc

    Jan 1, 2013

  • DFI
    Pile Test Results - 1-15 Corridor Reconstruction Project, Salt Lake City, Utah (Abstract Only) - DFI Member Conference - Seattle, 1998

    By D. M. Holloway

    As a part of the 1-15 Reconstruction Project, static and dynamic (high-strain) testing methods formed the basis to estimate long-term axial capacities, and to assess the magnitudes of bearing capacity

    Jan 1, 1998

  • CIM
    Design, Construction and Performance of PKC Dams on Northern Terrain

    By James W. Cassie

    The Snap Lake Diamond Project is located approximately 220 km northeast of Yellowknife, NT, Canada at an approximate latitude of 63?35?. The project location is within the zone of continuous permafros

    May 1, 2003

  • SME
    Results Of Instrumentation And Observation Of A Tunnel In Bedded Rock With High Residual (In Situ) Stresses

    By John D. Morton, J. H. LaVerne Palmer, Douglas J. Belshaw

    An extensive programme of ground instrumentation and observation was carried out for the West Duff in Outfall Sewer tunnel project prior to and during construction, to establish the performance charac

    Jan 1, 1979

  • AUSIMM
    Quantification and Controls on as Distribution in Westland, NZ

    By D Craw, J Pope

    The Greenland Group, Westland, can be characterised with respect to environmental issues by the application of a GIS database (DAME), and specific sampling campaigns. Waters draining gold mineralised

    Jan 1, 2006

  • DFI
    Quality Control of Pile Installation Using Digital Pile Penetration and Rebound Monitoring System

    By Hee-suk Yun, Dae-jin Hwang, Jeong-woo Seok, Myoung-mo Kim

    "In this paper, the accuracy of the data measured by a newly developed displacement measuring system, DPRMs (Digital Pile Penetration and Rebound Monitoring system) and its applicability as a quality

    Jan 1, 2005

  • SME
    Risk analysis for evaluation of mine impounded water

    By Michael Gobla

    "Since 1994 the Bureau of Reclamation (BOR) has used risk analysis to evaluate dams. Risk considers both the likelihood of failure and the expected consequences should failure occur. Risk analysis rel

    Dec 1, 2016

  • CIM
    HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground "CIM Connect 2025"

    By Karl Dufresne

    Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron

    Oct 1, 2024

  • DFI
    Case History Of The Support Of Excavation System Used At The Atlantic Building Project In Washington, DC

    By Joseph C. Gillen

    This paper discusses the design, construction, and performance of the support of excavation system used at The Atlantic Building jobsite. The support of excavation system had to be adaptable to the d

    Jan 1, 2006

  • SME
    AUV- and ROV-based exploration of active and inactive seafloor massive sulfide deposits at the Semyenov and Irinovskoe sites on the Mid-Atlantic Ridge

    By J. W. Jamieson, J. Escartin, A. Steinführer

    Evidence of hydrothermal activity on two Mid-Atlantic Ridge oceanic core complexes (OCCs), at 13º30’N (the Semyenov 1 through 5 fields) and 13º20’N (the Irinovskoe field) (Fig. 1) were studied using C

    Sep 1, 2014

  • IOM3
    Some effects of earth-movement on the Coal-Measures of the Sheffield district (South Yorkshire and the neighbouring parts of West Yorkshire, Derbyshire, and Nottinghamshire), part II, fig. VII: Geological map of the Sheffield district

    By Fearnsides W. G.

    The map shows the sites of collieries and important boreholes in the district, with approximate underground contours of the pre-Permian surface of the Coal-Measures and of the Barnsley Bed

    Dec 1, 1916

  • DFI
    Ensuring Performance of Tip Post-Grouted Bored Piles (Drilled Shafts) Through a Comprehensive Quality Assurance Program

    By Mary Ellen Bruce Large, Antonio Marinucci, Silas C. Nichols

    Tip post-grouting of bored pile (drilled shaft) foundations refers to a method where cementitious grout is injected beneath the tip of a shaft to improve the overall performance of the constructed fou

    Jan 1, 2018

  • CIM
    Environmental Factors Related to the Development of a New Uranium Refinery

    By J. P. Jarrell

    Environmental considerations are of increasing importance in determining the acceptability, schedule and cost of expansion ofCanada's uranium processing industry. Environmental considerations mus

    Jan 1, 1979

  • DFI
    Field Trials for Deep Mixing in Land Remediation: Execution and Early Age Monitoring, QC and Lessons Learnt

    By Ziyad Abunada, David O’Connor, Abir Al-Tabbaa

    "Abstract Contaminated land remediation using soil mix technology (SMT) is a relatively recent development which has been shown to be a cost effective and versatile system with numerous environmental

    Jan 1, 2014