Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Highway Lane Rental Requirement Compromises Blast Site Safety and Security
By Harry L. Siebert
A major Arizona highway project is jeopardizing site safety and security because of the lane rental policy. One million cubic yards of rock must be fragmented to provide two additional lanes parallel
Jan 1, 1997
-
New Inactive Hydrothermal Site Discovered At 16° 38? N, MAR
By G. Cherkashov
A new hydrothermal field with massive sulfide deposits was discovered in 2004 at 16º 38.4?N, 46º 28.5?W on the Mid-Atlantic Ridge. Hydrothermal signals had already been recorded from bottom waters and
Jan 1, 2004
-
Vancouver Island Conference Centre Cutter Soil Mixer Technology Transforms Site
By Brian Wilson, John Scholte, Megan Atkinson
"In November 2004, the residents of the City of Nanaimo, B.C., Canada voted to approve a new conference centre as the centrepiece of a proposed revitalization project for the city’s historic downtown
Jan 1, 2008
-
Journal: Safety Talk, Managing the Blast Site (The Known Unknowns)
By William Reisz
Managing the blast site at almost any operation can be a daunting task. There are so many details that must be observed, understood, and acted upon. It goes without saying that there are no two locati
Jan 1, 2014
-
Managing Tailings Influenced Ground Water at the Butte Superfund Site
By R. D. Williams
"In a very real sense, Butte, MT is where the copper came from that won two world wars. The price for that unrestricted mining and smelting of copper came due in 1983 when Butte was declared a Superfu
Apr 1, 2019
-
Electromagnetic Characterization of an Explosives Mixing Site at Blackie, Alberta
By David G. Paton
"Electromagnetic surveys were conducted at the BXL Bulk Explosives Limited Mixing Plant andsurrounding area to characterize runoff from the site and possible impacts of salinity. The BXL Plant is loca
Jan 1, 1999
-
I Don't Have X-ray Vision: Risk-Informed Site Investigation
By Georgette Hlepas
How often phrases like these have been made by project managers and project teams trying to explain why there has been cost growth, project delays and differing site conditions claims. But does it re
May 1, 2022
-
Site Procedures for a Blast Vibration Program and Impact Assessment
By David E. Siskind
"This report describes recommended vibration monitoring and assessment practices at blasting sites.Intended is regular monitoring, tracking of trends, responding to complaints of alleged damage, and t
Jan 1, 1999
-
Atlantic Wharf: Redevelopment Of A Historic Site On Boston's Waterfront
By Lee S. Vanzler
Atlantic Wharf involved the construction of a six-level underground parking garage and a 32-story high rise tower along the historic Boston Harbor waterfront. The site, historically known as ?Russia W
Jan 1, 2011
-
21st century relining – the path to greater mine site profitability
By P Rubie, J Russell
This paper looks at the past, present and not too distant future of grinding mill relining.Since the adoption of autogenous grinding (AG) mills and semi-autogenous grinding (SAG) mills as the primary
Aug 29, 2018
-
Case History of a Site Reevaluation for a Plant Expansion
By L. A. Pursell
Environmental constraints can both delay and raise the cost of a major plant addition, often requiring a complete reevaluation of the plant site and the proposed project. In this case history, steps a
Jan 1, 1983
-
Groundwater at the Underground Coal Gasification Site at Chinchilla, Australia
By S Fidler
Underground coal gasification (UCG) is a process by which coal is converted in situ to a combustible gas that can be used as a fuel or chemical feedstock. The process has been used in commercial-size
Jan 1, 2003
-
Technical Note - Improving mandated training through on-site safety services
By L. W. Saperstein, M. C. Radomsky, D. L. Passmore, J. D. Bennett
About 60 small surface coal mines in Pennsylvania participated in a program designed to improve safety performance in the workplace. The method involved the use of safety sampling and observation to a
Jan 1, 1987
-
Bulk Transport Vehicle Fire Safety: Preventing a Mine Site Disaster
By Harry Verakis, Thomas Lobb
Widespread use of ammonium nitrate compositions for mine blasting operations has led to various bulk transport vehicles designed especially for the explosives industry over the past half century or mo
Jan 1, 2008
-
Shaft Sinking at the Nevada Test Site U1H Shaft Project
By Ralph Musick, Brian Briggs
The U1h Shaft Project is a design/build subcontract to construct one 6.1 meter(m) (20 feet [ft.]) finished diameter shaft to a depth of 321.6 meters (m) (1055 ft.) at the Nevada Test Site (NTS). Atkin
Jan 1, 2001
-
Silver Star Motors “Tackles” Brownfield Site and Adjacent NYCT Subway
By Dharmil Patel, Michael J. Chow
"Construction progress is nearing completion at a Brownfield Site for a 100,000sf mixed-use 10 story building plus cellar for Silver Star Motors including a two-floor pre-owned Mercedes Benz showroom;
Jan 1, 2016
-
802.11 Wireless Site Survey Methodologies in an Underground Mine Environment
By Mark G. Lafontaine
Underground 802.11 wireless communications has become widely adopted for automation and communication purposes but maximizing the wireless signal presents many obstacles given the harsh environment as
May 1, 2013
-
A Method for Establishing Site Specific Coal Pillar Design Guidelines
By Mills KW
Coal mine pillar design formulae available to mine planners are typically based on relationships determined for specific site conditions. Application of these methods is difficult when other factor
Jan 1, 1992
-
A Method For Establishing Site Specific Coal Pillar Design Guidelines
By Winton J. Gale
Coal mine pillar design formulae available to mine planners are typically based on relationships determined for specific site conditions. Application of these methods is difficult when other factors,
Jan 1, 1992
-
Pre-Excavation Grouting at the Hemphill site — Atlanta WSP Tunnel
By Konner Horton, Adam L. Bedell, Don Del Nero, Brian Jones
"The City of Atlanta’s Water Supply Program Tunnel project includes a 7,315-m (24,000-ft) long, 4-m (13-ft) diameter, hard rock tunnel. A complex aspect of the project involves connecting five, blind
Jan 9, 2018