Search Documents

Sort by

  • NIOSH
    MLA 10-95 - Pilot Inventory Of Inactive And Abandoned Mine Lands, East Fork Pine Creek Watershed, Shoshone County, Idaho

    By Sam McNary

    The U.S. Bureau of Mines used the East Fork Pine Creek watershed to conduct a pilot study for an inactive and abandoned mine lands inventory, during which techniques and methodologies would be develop

    Jan 1, 1995

  • SME
    Use Of Ripping To Alleviate Excessive Compaction On Reclaimed Surface Mined Land (f1616ada-9235-4f95-bdf4-a09302103e5e)

    By J. C. Yingling, R. J. Sweigard, P. W. Conrad, J. M. Ringe, D. H. Graves

    Much of the land reclaimed since enactment of the 1977 Surface Mining Control and Reclamation Act is over-compacted. Research has shown that excessive compaction in replaced growing media is detrimen

    Jan 1, 2002

  • SME
    A Regional Comparison Of Postmining Land Use Practices

    By R. J. Sweigard

    Three case studies were undertaken to investigate the role of land use potential evaluation in reclamation planning and to determine the impact of regional differences on the evaluation process. The t

    Jan 1, 1983

  • DFI
    Design Of Drilled Shafts Supporting Sound Walls

    By Ke Yang

    Drilled shafts are widely adopted as the foundation for sound walls. However, there has been a lack of uniformity in design and analysis methods and design criteria, in terms of factor of safety again

    Jan 1, 2007

  • DFI
    Dynamic Analysis Correlation Of Standard Penetration Resistances With The Adhesion Of Very Stiff To Hard Clays On Driven Piles

    By Chris D. Thompson

    In Southern Ontario, Canada, piles are frequently driven through competent clayey soils to obtain end bearing on extremely dense till or bedrock. One reason for this is the difficulty at assessing the

    Jan 1, 2002

  • SME
    Planning And Preparation For Tunneling At Brightwater West

    By Mina M. Shinouda

    Brightwater West (BT4) represents the state of the art in utility tunneling, namely a long relatively small diameter, soft ground tunnel, with no intermediate shafts, under significant groundwater pre

  • DFI
    Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract Management

    By Mario Aiezza

    This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto

    Jan 1, 2002

  • ISEE
    Using Internet Resources to Improve Claim Reports

    By Gregory Poole

    With access to the World Wide Web, many resources are readily available for improving claim reports. With a little time spent on line, a more thorough report can be created. Claimants will accept the

    Jan 1, 2006

  • ISEE
    Techniques for the Evaluation of Rock Mass Structure and Strength in Blast Design

    Blast performance is related to rock structure and strength, as well as to factors such as site geometry, drill patterns, explosives loading, firing sequences and delays.

    Jan 1, 1986

  • SME
    A Study on the Impact of In-Seam Rock Partings on Coal Pillar Strength Based on Field Instrumentation and Numerical Modeling at the Maple Eagle Mine - SME Annual Meeting 2024

    By Morgan M. Sears, Mark Morris, Joseph Bright

    In an effort to advance the science underlying modern coal pillar stability analysis, researchers at the National Institute for Occupational Safety and Health are currently involved in research aimed

    Feb 1, 2024

  • IMMS
    Why Are Some Seafloor Polymetallic Sulfide Sites Particularly Rich In Gold?

    By Raymond A. Binns

    Exploration for undersea polymetallic sulfide mineral resources with high economic potential would be more effective given an ability to predict sites with particularly high gold contents (averaging s

    Jan 1, 2005

  • NIOSH
    Estimating the Hydrophobicity of Coal

    By J. A. Gutierrez-Rodriguez, R. J. Purcell, F. F. ApIan

    "Based on contact-angle measurements and the work of adhesion equation, the hydrophobicity of a wide variety of coals was found to decrease with decreasing rank, fixed carbon and total carbon content

    Jan 1, 1989

  • DFI
    Completely Automatized Recognition of the Installation Process in Special Foundation Construction

    By Christian Hoyme, Jochen Maurer, Hans Regler

    Up to today, it has been very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. It is becoming more and more important to be

    Sep 8, 2021

  • DFI
    Adapting Multiple Ground Improvement Techniques for Uniform Performance over Heterogeneous Natural and Modified Overburden

    By Michael J. Marasa

    "Geotechnical engineering and construction primarily relies on the subsurface characteristics of the particular site; however, obtaining both accurate and precise information on those features is chal

    Jan 1, 2017

  • AUSIMM
    Uncertainty in Soil Sampling ù A Case Study

    By K Luthbom, A Lagerkvist

    According to the Swedish Environmental Protection Agency, the number of potentially contaminated sites in Sweden is approximately 40 000. The funding for remediation from the Swedish Government alone

    Jan 1, 2005

  • DFI
    Cost Effective Excavation Support in Seattle

    By Richard D. Luark, Fernanda S. Madrona

    Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structure

    Jan 1, 2019

  • IMMS
    Permeability and Fault Control on Seafloor Massive Sulfide Deposits in the Lucky Strike Hydrothermal Field (Mid-Atlantic Ridge) Using Leapfrog Geo Software

    By Dennis Sánchez Mora, John Jamieson

    INTRODUCTION Work by Humphris et al., (2002); Ondréas et al., (2009); Barreyre et al., (2012); and Escartín et al., (2015) has identified active and inactive hydrothermal sites along the Lucky Strike

    Jan 1, 2018

  • SME
    Exploration Permitting: The Prospector's First Brush With The Law

    By Collon C. Kennedy, Frances C. Hartogh, C. Joel Casburn

    INTRODUCTION During the nineteenth century, the federal mining law was enacted with the objective of promoting the development of the western United States by providing unrestricted access to vast

    Jan 1, 1987

  • SME
    Silica Micro Encapsulation: An Innovative Technology For The Prevention And Treatment Of Ard

    By Paul Mitchell, Amy Wheaton, James Rybock

    Acid rock drainage (ARD) represents one of the most intractable problems faced by the non-ferrous metal and coal mining sectors, and the creation in the recent past of a number of high-level national

    Jan 1, 1999

  • SME
    Heap Leaching Without Ponds

    By R. Bruce Thorndycraft

    This paper will describe several modifications to design of con­ventional oxide gold heap leaching. They are targeted at reduc­ing costs and simplifying heap operations. These modifications were conce

    Jan 1, 1996