Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Abandoned Mine Lands Program TN# 7 Annotated Bibliography On Soil Characterization And Soil Amendment Use On Coal Surface Mine Lands - Objective
Produce an annotated bibliography to serve as a comprehensive source of published information available on the use of soil amendments in coal mine reclamation and the characterization of coal mine soi
Jan 1, 1991
-
Regional comparison of postmining land use practices
By R. J. Sweigard, R. V. Ramani
Three case studies were undertaken to investigate the role of land use potential evaluation in reclamation planning and to determine the impact of regional differences on final land use plans. The thr
Jan 1, 1987
-
Overburden Removal Activities Associated with the Yallourn Open Cut Township Field
By Fraser C. J
The township of Yalloum was established in 1921 to provide accommodation for the work force on the sites of the power station and open cut which were to become the basis of Victoria's electricity
Jan 1, 1992
-
Profile, Strain, And Time Characteristics Of Subsidence From Coal Mining In Illinois
By Robert A. Bauer
Two basic types of subsidence occur in Illinois: pit and sag / trough. Pits develop over mines less than 165 feet deep and where relatively incompetent strata are found over the mines. Sag subsidence
Jan 1, 1982
-
Mine Rehabilitation: An Economic Perspective on a Technical Activity
By Cox A
A key concern both in public perceptions of the environmental performance of the mining industry and in the development of policy relating to mining activities is the state in which the areas may be l
Jan 1, 1992
-
Evaluation of Mining Permits Resulting in Acid Mine Drainage in Pennsylvania 1987 - 1996: A Post Mortem Study
By Joseph M. Tarantino, Eric F. Perry, Keith B. C. Brady, Michael W. Smith
The Pennsylvania Department of Environmental Protection in 1998 reviewed its permitting process to determine how effective its program has been in preventing pollution and to identify here it could be
Jan 1, 2000
-
Pile Driving Hammers In Centrifuge Modelling - Synopsis
By Daniel Levacher
Pile load tests in site require extensive means of action and time. To get outstanding tests, the environmental test conditions must be perfectly known and acceptable. They concern the support install
Jan 1, 1996
-
Surface Subsidence Over Longwall Panels in the Western United States
By Frederick K. Allgaier
As part of an ongoing research program, the Bureau of Mines, U.S. Department of the Interior, is monitoring surface subsidence over six longwall panels at three Utah coal mines. These sites are charac
Jan 1, 1982
-
Analyses Of Dynamic Increasing Energy Load Test On Deep Foundations
By Silvana B. Foá
Results from full-scale loading tests showed the use of the dynamic increasing energy test (DIET) to verify the capacity of deep foundations. This method allows the measurement of dynamic resistance -
Jan 1, 2002
-
Cost Analysis Computer Model For Uranium In-Situ Leach Mining - Objective
Estimate costs for projected uranium in-situ mining operations. Approach Develop a computer model and an associated data base which will allow users to supply data applicable to a specific mining
Jan 1, 1982
-
Bioremediation Stabilisation of Sulphide Tailings and Rock Against Acid Mineral Water Development
As mining and extraction processes improve and lower grade ores become economic, mining for most ores have extended to depths beneath the zone of weathering oxidation created over geological histor
Jan 1, 1997
-
Hydrothermal Mineralization At Slow-Spreading Centers: The Atlantic Model (6baa95a4-914b-4150-8eae-8e16998a1da4)
By Peter A. Rona
Hydrothermal mineralization along slow-spreading oceanic ridges and rift -zones that comprise more than half the global length of the seafloor spreading center system is related to anomalous physical
Jan 1, 1985
-
The Development And Use Of Risk Assessment Techniques To Assess Roadway Stability In The Parkgate Seam At Thoresby Colliery
By Paul Cartwright
A rockbolted roadway risk assessment procedure has been developed specifically for the Parkgate seam at Thoresby Colliery by Rock Mechanics Technology and colliery engineers. The purpose of this asses
Jan 1, 1999
-
Soil Characteristics And Natural Field Conditions
This section contains a summary of our investigation of the soil conditions (type, porosity, moisture content, etc.) at the two sites (Lanse and Kato, Pennsylvania) selected for field testing of latex
Jan 1, 1972
-
Decommissioning of the Brenda Mine Near Peachland, British Columbia
By Ron Bradburn, Derek Perkins
"The Brenda mine is located in south central British Columbia, 22 km north west of Peachland, in the heart of the Okanagan Valley. Situated at an elevation of 1500 metres, the mine area straddles the
Jan 1, 1995
-
Institute of Metals Division - Nucleation Rates in the Alpha to Beta Transformation of Tin
By C. G. Durdaller, W. H. Robinson, G. M. Pound
The nucleation rate of the a (pay) to 0 (white) tin transformation was measured as a function of temperature and a tin particle size using an X-ray diffraction technique. The powder specimens of a tin
Jan 1, 1964
-
Blasting in Sydney Sandstone to Speed-Up Tunnelling in the Northside Storage Tunnel
By R Williams, P Kohout, J Comins
The Northside Storage Tunnel (NST) is the largest tunnelling project ever undertaken in Sydney. The tunnel extends deep underground from the western bank of the Lane Cove river to the North Head sewag
Jan 1, 2001
-
Mechanical Ventilation of Underground Construction Works in France
By Patrick Oriez, Chris Norris, Alain Mercusot
"Temporary mechanical ventilation is one of the fundamental requirements in guaranteeing a healthy atmosphere in underground construction works in order to protect the health of persons working on the
Jan 1, 2016
-
Stooping Low Safety Factor Pillars at Goedehoop Colliery - 12 Months Later
By Gift Makusha
Pre-feasibility work at Goedehoop Colliery indicated that stooping of the undersized pillars could be undertaken safely and economically. In light of the findings a decision was taken in may 2003 to u
Jan 1, 2004
-
Blasting in the New Mellinnium: Safety and CredibilityA Recipe for Success
By Steve Dillingham
In every aspect of conduct, on the blast site or off, the issue of credibility is raised. Promises are made, commitments are satisfied, safe practices are obeyed, communication is maintained, and prov
Jan 1, 2003