Search Documents

Sort by

  • CIM
    Sulphur-Burning Sulphur Dioxide Gas Plants for Reducing Agent Supply to Hydrometallurgical Processes - The Economic Advantage

    By Alfred Guenkel, Kyle Marte, K. Nikolaisen

    "The INCO SO2/air process was patented by INCO in 1985 (Borbely, Devuyst, Ettel, Mosoiu & Schitka, 1985). Well over 80 mining operations worldwide are using this process to oxidize cyanides to cyanate

    Jan 1, 2014

  • DFI
    Liquefaction Mitigation Synthesis Report

    By Timothy C. Siegel

    This report presents the results of a synthesis on the design and analysis of ground improvement for liquefaction mitigation. The synthesis included an industry survey concerning the practice of groun

    Aug 1, 2013

  • NIOSH
    RI 9571 - In-Mine Evaluation of Catalyzed Diesel Particulate Filters at Two Underground Metal Mines

    By Winthrop F. Watts

    The U.S. Bureau of Mines evaluated the performance of a catalyzed diesel particulate filter (CDPF) and a CDPF combined with a diesel oxidation catalyst (DOC) at two metal mines. This report describes

    Jan 1, 2010

  • SME
    Geomechanics

    By Z. T. Bieniawski

    Geomechanics signifies the science and engineering of soil and rock materials and of rock masses. It is a field of professional practice and research that draws heavily on the elements of soil and roc

    Jan 1, 2008

  • NIOSH
    RI 6537 Development of a Rock Stress Monitoring Station Based on the Flat Slot Method of ~Measuring Existing Rock Stress

    By Louis A. Panek, John A. Stock

    A flat slot is created in rock to cause stress relief effects in a pair of hydraulic borehole pressure cells (previously installed in drill holes above and below the slot ) , which act as sensing devi

    Jan 1, 1964

  • SME
    Improved Flow Measurement and Control are Key to Efficiency

    By Alena Johnson

    "Much of the copper being produced today uses heap leaching, where pure metal is extracted from the ore with a chemical process rather than smelting. This technique is deployed extensively in major co

    Jan 10, 2018

  • CIM
    Structure, Stratigraphy, U-Pb Geochronology and Alteration Characteristics of Gold Mineralization at the Detour Lake Gold Deposit, Ontario, Canada (7fbdd5b5-ed88-46a3-b280-65b8ab04c5b6)

    By B. Dubé, R. Friedman, J. Oliver, R. Aubertin, M. Burson, G. Panneton, M. Hamilton, J. Ayer

    "Abstract — The Detour Lake gold deposit is located within the northwestern limit of the Archean Abitibi Subprovince of the Superior Province. Mineralized zones are hosted by a sequence of pillowed an

    Jan 1, 2012

  • NIOSH
    IC 8719 Projects To Expand Fuel Sources In Western States - Survey Of Planned Or Proposed Coal, Oil Shale, Tar Sand, Uranium, Geothermal Supply Expansion Projects, And Related Infrastructure, In States West Of The Mississippi River (As Of May 1976)

    By John S. Corsentino

    This Bureau of Mines study is a listing of fuels -related projects that are presently under construction, planned, or proposed by various companies and organizations in the Western United States. The

    Jan 1, 1976

  • TMS
    Purification of Oil-Contaminated Soil by Flotation

    By Georgios N. Anastassakis, Nickolaos Georgiou

    "Soil contamination by oil as well as by other organic pollutants poses a major problem to the environment. Various methods have been used to remove organic contaminants from soil, such as: biological

    Jan 1, 2008

  • NIOSH
    OFR-9(4)-72 Coal Mine Rescue And Survival System - Volume IV - Program Evolution And Management ? 1. Introduction

    This final report summarizes the effort on a very aggressively scheduled and demanding development program undertaken by Westinghouse for the U.S. Bureau of Mines under Contract No. H0101262. The obje

    Jan 1, 1971

  • SME
    Mining In Minnesota: Balancing Environmental Protection And Economic Development (93c1efa5-9836-488f-b32e-e83ac099d4e8)

    By W. C. Brice

    A cooperative study was undertaken by representatives of the environmental community, the mining industry, and state government to identify and resolve environmental issues associated with base and pr

    Jan 1, 1990

  • SME
    Estimating the Unconfined Compressive Strength (UCS) of Emplaced Cemented Rockfill (CRF) from QA/QC Cylinder Strengths

    By M. J. Raffaldi, L. A. Sandbak, K. K. Dehn, S. N. Warren, J. B. Seymour

    "Confidence in the design and stability of an undercut cemented rockfill (CRF) span requires a thorough understanding of its emplaced material properties. The unconfined compressive strength (UCS) of

    Jan 1, 2018

  • NIOSH
    Hydraulic conductivity changes and in?uencing factors in longwall overburden determined by slug tests in gob gas ventholes

    By C. Özgen Karacan

    This study presents the results of core-log analyses from the exploration boreholes, the analyses of face advance rates, and the results of downhole monitoring studies performed in gob gas ventholes f

    Jan 1, 2009

  • ISEE
    Blasting a Diversion Tunnel through the Abutment of a "Meta-Stable" Dam

    By Jennifer Williams, Donald J. Berger

    Originally built between 1913 and 1916, the Ashton Dam & Hydroelectric Facility has experienced various seepage and piping incidents since completion. Ashton Dam is located within 15 miles (24 km) of

    Jan 1, 2014

  • AUSIMM
    Vibration control blasting for low stability final walls

    By G Wyartt

    In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl

    Nov 30, 2018

  • SME
    An Interpretation Of Some Magneto Telluric Data Recorded In Northeast British Columbia During 1969

    By A. A. Densmore

    Telluric Current is that portion of the electric field observed at the surface of the earth which is of an alternating nature, and which is related to solar activity and events in the ionosphere. The

    Jan 1, 1972

  • AUSIMM
    An Integrated Technology Solution for Optimised and Environmentally-controlled Blasts

    By C Parihar, R Garg, A Bhandari, S Bhandari

    Blasting can impact the efficiency of entire downstream mining operation. Individual technology solutions for blasting have been available in the industry for many years but all of them only cater for

    Aug 24, 2015

  • AUSIMM
    Exploding the Myths ù A Case Study on Land Use Planning and Quarry Buffers

    By M Freeman

    In a visionary move, the Planning Commission and the Ministry for Planning in Western Australia decided to invite three extractive industry quarry operators, local government councils and State Govern

    Jan 1, 2001

  • SME
    Integrating Copper Recovery With In Situ Leach Mining

    By A. E. Isaacson

    The U.S. Bureau of Mines is investigating a systems approach to metals recovery from leach liquors produced by in situ leach mining techniques. A successful in situ leaching process requires a thoroug

    Jan 1, 1990

  • CIM
    The influence of geology on blast damage

    By S. P. Singh

    "The geological features of a rock mass have a direct influence on its blasting characteristics. It has been observed that perimeter control techniques provide excellent results in massive crystalline

    Jan 1, 2001