When The Bill Comes Due: Understanding and Managing Tailings Influenced Groundwater at the Butte Superfund Site. A Historical Perspective
By R. D. Williams
INTRODUCTION In a very real sense, Butte, Montana is where the copper came from that won two world wars. The price for that unrestricted mining and smelting of copper came due in 1983 when Butte was
Jan 1, 2019
-
Vermont/Hollywood Tunnel Project Los Angeles Metro Redline Contract B251 Development of the Main Work Site Los Angeles, California
By Shelley M. Burg, Dennis K. Poulton, Robert B. Gordon
This project includes the excavation and concrete lining of approximately 18 900 m (62 000 ft) of 5.5 m (18 ft) finished diameter subway tunnel for the Los Angeles MTA. The project required that four
Jan 1, 1995
-
Integration of CSIR- and CSIRO-type of overcoring rock stress data at the Zedex Test Site, Äspö HRL, Sweden
By F. H. Cornet, D. Ask, O. Stephansson
We have conducted a stress analysis of overcoring stress measurements undertaken at the Zedex Test Site (ZTS) in the Äspö HRL, Sweden. Two different types of overcoring cells have been used at the sit
Jan 1, 2003
-
The Minetrain Project: Developing an Advanced Level Training Program for Mining Industry Professionals in an Actual Deep Mine Site
By Z. Zhang, M. S. Gonzalez, M. de P. Bueno, P. Holopainen, S. Luukkanen
In an extremely competitive mining industry, onsite experience is a big advantage. Mining education at the universities is mostly focused on theoretical studies without a possibility of practical trai
Jan 1, 2019
-
Utilisation Des Boues Rouges Pour La Restauration De Rejets Miniers Générateurs De Drainage Minier Acide Cas Du Site Dunraine
By Ann Lamontagne
Le parc à résidus de l?ancienne mine Dunraine contient des résidus générateurs de drainage minier acide. Le concept proposé pour la restauration du site est d?utiliser le fort potentiel alcalin des bo
Nov 1, 2002
-
Site-banking of the Reserved Areas with the International Seabed Authority: for operation of the Enterprise or Joint Venture
By Kioshi Mishiro, Pratima Jauhari, Walter Williams
INTRODUCTION The UN-General Assembly adopted an Agreement on 28 July 1994 entitled ‘Agreement relating to the implementation of Part XI of the United Nations Convention on the Law of the Sea ((UNCLOS)
Jan 1, 2018
-
The evolution of the Monty Geological model and the revolution of the on-site modelling and grade control processes
By P Willems, J B. Crow, R Dale
Open pit mining commenced at Lihir Island in 1997 and is undertaken using a conventional drill, blast, load, haul methodology. Unique challenges at the operation include an active geothermal system, a
Mar 22, 2022
-
Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In Driving
By Hodjat] [Shiri
A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in
Jan 1, 2006
-
Mineralogic And Geochemical Characteristics Of Uranium And Vanadium Distribution At A Proposed Uranium In-Situ Recovery Site, South Dakota
By S. F. Diehl
Drill cores from uranium roll-front deposits, hosted in lower Cretaceous strata, were examined from the proposed Dewey Burdock in-situ uranium recovery site in the northern part of the Edgemont uraniu
Feb 27, 2013
-
OFR-100-93 Results Of The 1991-92 U.S. Bureau Of Mines Site Specific Mineral Investigations Project In Alaska
By Steven A. Fechner
In 1991 and 1992, the Bureau of Mines completed chromium, platinum-group metals (PGM), and tin investigations, and started indium, manganese, titanium, and vanadium investigations in Alaska. These stu
Jan 1, 1994
-
Dynamic Horizontal Load Tests On Steel Pipe Piles Having Different Sizes In The Same Construction Site And Their Analyses
By Eiji Kojima
In this research, dynamic and static load tests were performed on permanent foundation piles which had a pile length of 30 m, 800 mm in outer diameter and 15 mm in wall thickness. In this site the dyn
Jan 1, 2006
-
Variation Of Load Settlement Relations Of 25 Steel Pipe Piles Constructed In A Site From Rapid Pile Load Testing
By Tatsunori Matsumoto
In order to investigate the variation of the load-displacement relations of piles in a site, vertical load tests were carried out on 25 small diameter steel pipe piles. Out of 25 piles, 15 piles were
Jan 1, 2006
-
Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessment
By A Kemp, I Taylor, S C. Lamoureux
Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo
Jul 24, 2017
-
Comparison Of Empirical, Analytical, And Numerical Methods Of Pillar Design And The Development Of A Site Specific Pillar Formula
By Vincent A. Scovazzo
Many accepted and useful methods have been developed and used for pillar design. Each method has its own particular strengths and weaknesses. Three methods addressed in this paper are; empirical, anal
Jan 1, 1995
-
Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.
By P. M. Wiltcher
The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high
Jan 1, 2006
-
-
Seismic Transient with Low Frequencies at Short Distances Case History: Tunnel Blasting in Urban Site at Isola Liri (Italy)
By Roberto Folchi
"This article deals with the excavation of a tunnel below the town of Isola LIRI, nearFrosinone, in central Italy. The tunnel was driven into a conglomerate formation, of lacustrine_fluvial origins, c
Jan 1, 1993
-
Geology Of The Syncrude Mine Site And Its Application To Sampling And Grade Control (7f5d80e2-f9f1-41b4-8041-3d14a94ec21c)
By Neil D. Donnell, O&apos
Bituminous sands of the Lower Cretaceous McMurray Formation in northern Alberta constitute the ore for the surface mining operation at Syncrude Canada Ltd. These sediments represent a complex successi
Jan 1, 1984
-
Lead Contamination At An Old Smelter Site At Socorro, New Mexico: Part I - Particle Size And Depth Of Contamination
By J. W. Hawley, G. S. Austin, L. A. Brandvold, J. Renault
Soil next to a smelter abandoned about 100 years ago near Socorro, NM was found, by the US Environmental Protection Agency (EPA), to contain high Pb concentrations. Detailed characterization of the so
Jan 1, 1994
-
Geology Of The Syncrude Mine Site And Its Application To Sampling And Grade Control (c7f7d449-5f41-4a73-8884-e4095a7369e2)
By Jack M. Jodrey, Neil D. O’Donnell, R. A. Metz
Bituminous sands of the Lower Cretaceous McMurray Formation in northern Alberta constitute the ore for the surface mining operation at Syncrude Canada Ltd. These sediments represent a complex successi
Jan 1, 1992