  • SME
    Validation of Modeled Rockmass Permeability Against Field Measurements in a Longwall Mine - SME Annual Meeting 2024

    By Steven J. Schatzel, Kayode M. Ajayi, Marcia M. Harris, Zoheir Khademian

    Predicting rockmass permeability is critical in evaluating various engineering designs, including estimating gas inflow to a longwall mine in the case of a hypothetical breach in the gas well. This st

    Feb 1, 2024

  • SME
    Blast-induced rock damage and optimized blast design in a hard-rock mine - SME Transactions 2014

    By K. M. Kim

    An analysis was conducted to determine the effects of blasting on slope stability and downstream comminution processes. To investigate these effects, the extent of blast-induced rock damage and the ma

    Jan 1, 2014

  • IOM3
    Probabilistic key-block analysis for support design and effects of mining-induced stress on key-block stability: a case study

    By R. Trueman, D. B. Tyler

    Numerical modelling was used to determine the magnitude and direction of stresses around drives both adjacent to and distant from open stopes in the South Crofty tin mine. Modelling predicted that dri

    Jan 4, 1993

  • NIOSH
    OFR-52-83 Microseismic Applications for Mining - A Practical Guide

    By Wilson Blake

    Increased application and interest in the use of microseismic monitoring to deal with ground control problems, Particularly those resulting in violent failures, has brought about the need for practica

    Jan 1, 1982

  • SME
    Coping with Boulders in Soft Ground TBM Tunneling

    By Peter B. Dowden, Robert A. Robinson

    Boulders, frequently found in tunnels excavated through soils, can pose major problems for full face TBMs in terms of slowing or halting the tunnel advance, cutter damage, and abrasive wear. The paper

    Jan 1, 2001

  • TMS
    Meeting Arsenic Standards In Drinking Water By January 2006: A Review Of Available Technologies

    Arsenic occurs naturally in rocks and soils, water, air, plants and animals. It can be further released into the environment through natural activities such as volcanic action, erosion of rocks and th

    Jan 1, 2005

  • NIOSH
    OFR-81-76 Development Of An Automatic Fire Protection System For Mobile Underground Metal Mining Equipment

    By Gene R. Reid

    The contract objective is the development of an Automatic Fire Control System for Mobile Underground Metal Mining Equipment. The Phase I Report, which described the projected data handling plan, was p

    Jan 1, 1975

  • NIOSH
    IC 8578 How To Find Abandoned Oil And Gas Wells

    By K. H. Johnston

    This guide was written to furnish the coal industry with a description of techniques, instruments, and clues on how to find abandoned oil and gas wells that have penetrated coal seams. The report incl

    Jan 1, 1973

  • DFI
    “Borehole Stabilization” For Deep Excavation, An Essential Part In Bored Piling / Diaphragm Wall Construction

    By Thomas Domanski

    Any type of deep excavation whether for Bored Piling, Diaphragm Walls or Contiguous Bored Piling Walls depends on forming a stable borehole with a defined cross-section to receive safely the permanent

    Sep 1, 2022

  • CIM
    The Starved Acid Leaching Technology (Salt) for Nickel Recovery from Saprolites

    By N. Waters

    "Nickel saprolite ores are normally mined as feed to Fe-Ni smelters or Ni matte smelting operations. The smelting processes typically require high Ni cut-off grades of approximately 1.5 to 2.2% Ni, de

    Jan 1, 2017

  • AUSIMM
    Modelling of height of connective fractures during longwall mining

    By D Adhikary, M Khanal, B Poulsen, H Guo

    During longwall mining, the ability to reliably estimate the height of longwall mining-induced fractures is critically important in order to effectively manage mining-induced water inflows and aquifer

    Nov 30, 2018

  • DFI
    Nailed It! The Great Wall of the Chinese Embassy (dbde4e01-35b2-40e7-b641-e07610069e96)

    By Fred Tarquinio, Giovanni Bonita, Lars Wagner

    "A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large

    Jan 1, 2007

  • CIM
    Advanced Control of Pressure Hydrometallurgical Plants

    By R. K. Jonas

    "Pressure leaching and pressure oxidation in autoclaves are important alternatives in the extractive processing of gold, copper and nickel ores. The application of advanced control to pressure leach a

    Jan 1, 2012

  • AUSIMM
    Mill Modelling Using an Extensible Station-Based Framework

    By E A. Gunn, J Zhou

    In this paper a project to develop a joint optimisation/simulation model for production planning in a mine-mill complex is presented. The system involves a mill receiving ore from a number of differen

    Sep 26, 2011

  • AUSIMM
    The Waterview Connection Project – Progress to Date

    By S Hanke, J Burden, P Spies

    The Waterview Connection will complete Auckland’s long-planned Western Ring Route, a 48 km north-south motorway alternative to State Highway 1 that bypasses the central city to the west. The project i

    Sep 17, 2014

  • AUSIMM
    The Augmented Mine Worker – Applications of Augmented Reality in Mining

    By J Bassan

    The mining industry is faced with imperatives to improve worker safety and productivity, adapt to skills shortages, high worker turnover rates, and provide more effective maintenance to new and ever m

    Nov 22, 2011

  • ISEE
    Digitization for Optimization: Easier and Cheaper

    By Benjamín Cebrián, David Flores, María Rocha Gil

    This document shows the evolution of drilling and blast digitization process, savings and trends in a mine, using new technologies that creates business opportunities and general improvement of D&B pr

    Feb 1, 2020

  • DFI
    Foundations Of The 'Kö-Galerie' In Düsseldorf Using Top/Down Building Technologies

    By P. Arz

    With a total of five basement levels, ground floor and a further six levels above grade, construction of the Kö-Galerie building, on the Königsallee, in the centre of Düsseldorf, was completed with al

    Jan 1, 1989

  • AUSIMM
    Mechanisms of Metal Release From Subaqueous Mine Waste at Circum-Neutral pH ù Examples From Four Case Studies

    By J J. McNee and, J Crusius, T F. Pedersen

    The use of water covers is a globally-applied method for minimising acid rock drainage (ARD) and metal leaching. Although the subaqueous disposal of potentially acid-generating materials has been show

    Jan 1, 2003

  • NIOSH
    RI 9151 - Cost Comparison of Gob Hole and Cross-Measure Borehole Systems To Control Methane in Gobs

    By E. C. Baker

    The capital investment and operating costs of two methane-control systems used during longwall mining operations are compared in this Bureau of Mines report. Costs are given for a surface gob hole dra

    Jan 1, 1988