Search Documents

Sort by

  • AUSIMM
    Sustainable Waste Rock Remediation and Revegetation - A Real-World Longitudinal Study Comparing ViroMine Technology to Standard Applications and Doing Nothing

    By D Blair, L Fergusson, G Barros

    "The purpose of this paper is to present the findings of a waste rock remediation program conducted at a gold mine in New South Wales (NSW) over a six-year period. The treatment of waste rock dumps in

    Jul 10, 2012

  • CIM
    Tailing Disposal at the Sullivan Concentra tor

    By A. L. Irwin

    THE disposal of tailing or waste material, which is generally a very large proportion of the ore treated, is a major problem in the location and operation of any concentrating enterprise and especiall

    Jan 1, 1939

  • SME
    RETC 2025 Full Proceedings - RETC2025

    By Samer Sadek, Brian Hagan

    We are thrilled to welcome you to the 2025 Rapid Excavation and Tunneling Conference (RETC), which will be held in Dallas, TX. This year’s conference will showcase the continued trend of strong indust

    Oct 1, 2025

  • SME
    Driving Open Autonomy and Innovation - SME Annual Meeting 2024

    By Jason Clarke, Glen Trainor

    As the mining industry faces increased challenges with declining ore grades and harder to access deposits, operating mine sites in an environmentally responsible and economically viable manner will re

    Feb 1, 2024

  • SME
    Experimental Design And Implementation Of Soil Bioengineering Measures On AML Slopes

    By R. J. Sweigard

    Stabilization of slopes on abandoned mine land (AML) invariably involves some channelization to control surface drainage. Typically, these channels are lined with riprap or gabions, depending on gradi

    Jan 1, 1998

  • DFI
    A Novel Method For Assessing The Reuse Of Under Reamed Piles As Part Of The Southbank Place Project

    By Stuart Hardy, Xiangbo Qiu

    The South Bank Place project comprised the redevelopment of the iconic Shell Corporation headquarters in Waterloo, located on the Southbank of the River Thames in central London. The site was original

    May 1, 2022

  • SME
    Influence of highwall mining progression on web and barrier pillar stability

    By M. J. Raffaldi, K. W. Harris, K. A. Perry

    "Highwall miners have been widely used to extract additional coal reserves from existing surface operations, particularly on contour operations in the Appalachian coalfields. Using a continuous miner

    Jan 1, 2014

  • DFI
    Piled Foundations for the New Wembley Stadium, London

    By Anthony L. Reynolds, Clifford J. Wren

    "The adoption of a significant pile testing regime, the use of Eurocode 7 as the design standard, the development of lean construction techniques, and lateral thinking in overcoming some considerable

    Jan 1, 2005

  • IMMS
    A Comparison Of The Results Of Three Systems For Setting Sediment Quality Guidelines For Trace Metals

    By Derek V. Ellis

    Sediment Quality Guidelines can provide target values that should not be exceeded when seabed deposits are disturbed for mining, waste discharge or other purposes. Three sets of Guidelines have appear

    Jan 1, 1995

  • IMMS
    Monitoring the Dynamics of Gas Hydrate Deposits and Hydrothermal Discharge using the NEPTUNE Undersea Observatory Network

    By S. Kim Juniper

    Ocean observatory technologies permit uninterrupted, real-time observation of dynamic seafloor environments such as gas hydrate deposits and hydrothermal vent fields that are of both scientific and ec

    Sep 14, 2011

  • CIM
    The Ungraded-Fibre Mill

    By C. Gordon Saunders

    "The ungraded-fibre mill is located at the mine site and has a rated capacity of 6,600 tons of ore input and 1,200 tons of ung1•aded fib1 •e product per day. Power for operation is obtained from a die

    Jan 1, 1976

  • AUSIMM
    Selection of Mine Water Management Options Considering both Water and Energy Impacts

    By M T. Nguyen, S Vink, M Ziemski

    On any given mine site the water system is contingent upon its initial design. Through time the initial design is adjusted by a myriad of water management options in order to improve water system perf

    Nov 26, 2013

  • AUSIMM
    Geoscan Online Analyser Use for Process Control at Fortescue Metals Group Sites in Western Australia

    By B J. Beven, A Harris, L Balzan

    Fortescue Metals Group flagship operation, Cloudbreak, is located in the Pilbara region of Western Australia. The mine is capable of delivering an annualised production rate of 40 Mt/a. Positioned 50

    Jul 13, 2015

  • SME
    The Elk River MCHM spill; A case study on managing environmental risks

    By Meredith Scaggs, Emily Sarver, Lucas Rojas Mendoza

    "Early on Jan. 9, 2014, approximately 37,800 L (10,000 gal) of crude 4-methylcyclohexanemethanol (MCHM) leaked from a storage tank sitting on the bank of the Elk River near Charleston, WV (WVDEP, 2014

    Jan 1, 2014

  • DFI
  • SME-ICGCM
    Numerical Model Calibration for Simulating Coal Ribs (da729951-bd49-415c-b364-03a4e38bfd9c)

    By Michael Murphy, Khaled M. Mohamed, Berk Tulu

    "Failures of coal ribs are major hazards in underground coal mines. For the period of 2010 to 2014, rib falls were the leading cause of groundfall fatalities and accounted for 35% of all groundfall-re

    Jan 1, 2016

  • ISEE
    Explosives Safety and Security

    By Joseph A. Meyers

    NYC has always been a high-profile target for both foreign and domestic terrorists. Explosives have always been the go-to tool for terrorists to bring about serious physical injury, death, and propert

    Jan 21, 2025

  • AUSIMM
    The 250 million ton per annum spatial digital twin

    By M Pomery

    BHP’s Western Australian Iron Ore Operations (WAIO) move approximately 250 million tons of ore per annum. The magnitude of the constant changes to the terrain models along with the diverse output and

    Sep 18, 2023

  • SME
    A Comparison of Ground Permeability Changes Before, During, and After Longwall Panel Mine-bys Under Deep and Shallow Cover - SME Annual Meeting 2025

    By James Addis, Zoheir Khademian, Marcia L. Harris, Charlie Matthews, Y Zheng

    Shale gas wells can sometimes drill through coal reserves. Hypothetically, the caving of the gob from longwall coal mines may deform the shale gas well casing and potentially result in a breach. NIOSH

    Feb 1, 2025

  • SME
    A Geostatistical Solution to Estimating Groundwater Inflows in Deep Rock Tunnels with Validation Through Case Studies "Mining, Metallurgy & Exploration (2021)"

    By MARK J. VANARELLI

    Estimating groundwater inflows in rock deep tunnels is critical to the safety of personnel constructing the tunnel and the cost of construction. This paper presents two case studies for estimating ste

    Oct 9, 2020