Search Documents

Sort by

  • SAIMM
    Improving The Safety Performance Of The UK Quarrying Industry Through A Behavioural Based Safety Intervention

    By Patrick J. Foster

    This paper summarises a behavioural safety project undertaken in seven quarries in the UK in order to investigate its applicability as a means of raising the standards of health and safety in the UK q

    Jan 1, 2008

  • DFI
    Bearing Capacity Of Pile By Curve-Fitting Method ? Synopsis

    By Z. Q. Zhou

    It is the first worke in design of pile foundation to determine the carring capacity of single pile, and a static loading on site is considered to be the lost derect and reliable way. All values P and

    Jan 1, 2010

  • DFI
    Design Of Foundation On Granular Piles For Five Storeyed Esidential Complex At Nazira, Assam - Synopsis

    By B. N. Hira

    A multistoreyed residential complex was at the penultimate stage of construction by ONGC at Nazira, Assam. The site was situated at high earthquake zone. The subsoil was very weak and contained soft t

    Jan 1, 1996

  • DFI
    The Effect Of Vertical Pile Loading On Subsequent Lateral Behaviour

    By A. Lyndon

    Vertical and lateral load tests were carried out on two 13 m deep bored cast-in-place instrumented piles, socketed into weathered sandstone. The first pile, 1200 mm in diameter, was loaded vertically

    Jan 1, 1989

  • DFI
    Performance Of Non-Displacement And Displacement Piling, Adelaide Convention Centre, South Australia

    By Felix Cheng

    Extensions to the Convention Centre in Adelaide, South Australia consisted in part of construction over the existing railway system comprising nine rail lines and passenger platforms. Vibro-pile (Aust

    Jan 1, 2002

  • CIM
    Process Design Consideration for a Small Gold Mill in the Northwest Territories

    By A. M. Childs, R. F. Mather, K. R. Rawling

    "The challenges encountered in the design and construction of mines and their process facilities today are becoming more intense and the engineering more competitive. The need to incorporate new techn

    Jan 1, 1983

  • AUSIMM
    Inadequate Water Management Planning Resulting in Long-term Closure Liabilities

    By H J. J Boshoff

    Mine closure planning integrated into life-of-mine (LOM) planning during the operational phase consists of many subcategories. One of these subcategories that needs to be fully integrated into the LOM

    Jul 16, 2014

  • SME
    Producing Structural Concrete While using Mine Tailings as a Substitute for Fine Aggregate

    By J. M. Bray, R. R. H. Cohen, P. Kiousis, S. R. Al-Abed

    "INTRODUCTION Conventional tailing storage and management practices typically utilize engineered facilities, such as ring dikes and valley impoundments. To reduce the environmental costs associated wi

    Jan 1, 2016

  • AUSIMM
    Risk Assessment Models for Post-Mining Land Use

    By C Smith, R I. Maczkowiack, P D. Erskine

    Open cut coal-mining has been conducted in the Bowen Basin region of central Queensland for almost five decades, and has disturbed an estimated area of 140 000 ha of agricultural land until 2011. Appr

    Jul 10, 2012

  • IMPC
    The AGDP In 2012 ? Nine Years Of Exceptional Graduate Training

    By J. A. Sweet

    The issues facing graduate training in the mineral processing industry are not too different today from those that prompted the initiation of the Anglo American Platinum Graduate Development Programme

    Sep 1, 2012

  • AUSIMM
    Mine geology standardisation – providing the foundation to consistent short-term geometallurgical product predictions in a complex multimine and supply chain environment

    By B L. Sommerville

    "The theme of this International Mining Geology Conference is ‘Setting New Standards’. Rio Tinto’s iron ore operations include a complex integrated supply system to deliver ore from 15 mine operations

    Sep 20, 2017

  • AUSIMM
    Post Closure Management of the Mt Leyshon Gold Mine - Water the Integrator

    By T Baumgartl, D Mulligan, R Haymont

    Mining at the Mt Leyshon Gold Mine in semi-arid north Queensland stopped in 2002. Newmont Australia has recently initiated a thorough post-closure water management study of the site by revisiting the

    Jan 1, 2006

  • DFI
    Diving Underground - Through a Hologram - To Better Understand Foundation Risk

    By Scott A. Anderson, Benjamin S. Rivers, Derrick D. Dasenbrock, Silas Nichols

    Unknown geotechnical conditions are a major source of risk. Unexplored places vastly outnumber the sampled and tested ones, and widely spaced boreholes with intermittent tests and samples are the norm

    Jan 1, 2019

  • CIM
    Underground Booster Fan Placement Strategies

    By Euler De Souza, Kyle Penner

    "Booster fans play an important role in assisting main fans by boosting the air pressure of the ventilation air passing through it. The correct placement of underground booster fans in a mine is a cri

    Jan 1, 2019

  • DFI
    Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, Dc

    By Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey

    Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and

    Oct 1, 2022

  • ISEE
    Render-Safe Operations in an Urban Environment

    By Robert McClure, Carlton Lehman

    Rendering safe explosives in an urban environment presents a unique challenge due to the safety concerns and disruption to the general public. Potential damage to the surrounding homes, businesses, ut

  • NIOSH
    Application Of The Q-System To Australian Underground Metal Mines

    By Max F. Lee, Warren A. Peck

    The applicability of the Q-system [Barton et al. 1974] to Australian underground metal mines is discussed with reference to two common design issues: ground support for horizontal mine development, an

    Jan 5, 2007

  • DFI
    Anchored Double-Tier Retaining Walls on Sloping Embankment

    By Chu E. Ho, Paul Napoli

    A new waterfront park was developed on Long Island in close proximity to the East River and Newtown Creek. The existing ground consisted of fill over soft organic clay, medium dense silty sand, glacia

    Jan 1, 2019

  • CIM
    The Earth Moving Equipment Safety Round Table Design Evaluation for Equipment Procurement Process

    Diverse and considerable energies are associated with mobile equipment operated and maintained on mine sites. Loss of control of these energies is a common cause of injury on mine sites and this is we

    Aug 1, 2013

  • AUSIMM
    Geological Constraints in Applying Bioremediation to the Decontamination of Polluted Soil

    By B M. Guerin

    In this paper, some of the constraints to applying bioremediation to the decontamination of polluted soils are introduced. Particularly, attention has been given to those associated with the geology o

    Jan 1, 1992