Search Documents

Sort by

  • NIOSH
    Remote Monitoring of Mine Seismicity and Earthquakes Using Radio Telemetry, Computers, and the Internet

    By D. Denton, M. Stickney, R. Langston

    The National Institute for Occupational Safety and Health and the Stillwater Mining Company worked cooperatively with the Montana Bureau of Mines and Geology to develop a system that would collect sei

  • AUSIMM
    Empowering tailings operators through education

    By D Brett

    The Paper presents the authors thoughts on how the mining industry should be improving the education of site personnel so they can provide a greater level of effective control of tailings dam safety i

    Jul 1, 2021

  • DFI
    A Study Of Three Test Sites Comparing Theoretical Ultimate Pile Capacities, Static Pile Load Tests, And Psuedo Static Pile Load Test Results

    By Richard D. Short

    The Pseudo Static Pile Load Test, PLT, is a rapid method for determining pile capacity. Pile design is usually based on theoretical calculations of ultimate load capacity using soil data from a field

    Jan 1, 2000

  • SME
    Design And Construction Of The Exploratory Shaft Facility -A Regulatory Perspective

    By J. Peshel

    This paper presents a regulatory perspective of the design and construction of the Exploratory Shaft Facility which may become part of the future high-level waste repository. Site characterization con

    Jan 1, 1989

  • SME
    Contractual Practice in SEM/ NATM—Tunnelling in Austria and Germany - NAT2024

    By Lukas Erkurt, Wolfgang Holzer, Stefan Auderer, Richard Gradnik

    SEM/ NATM Tunnelling contracts in Austria and Germany are usually tendered applying unit price contracts. The purpose of this paper is to show how contractual problems are resolved in these countries.

    Jun 23, 2024

  • CIM
    Maintenance Engineering ? Mine Operators Conference

    Presentation Topics ? Low and Intermediate Level Waste ? Project Location and Site ? Geological Setting ? Key Features ? Project Overview ? Licensing and EIS ? Next Steps DGR Waste Package Inv

    Oct 1, 2010

  • AUSIMM
    Capital and Operating Cost Eestimation for Open Pit Mining Equipment

    Background information, formulae and a systematic set of procedures for estimating capital and operating costs for open pit mining equipment are presented in this paper. Firstly, equipment capital c

    Jan 1, 1990

  • DFI
    Once Again, Engineering And Contractor Tenacity Overcome Tough Geology

    By John E. Lens

    How much trouble can narrow vertical fissures in bedrock cause on a shallow bedrock site? Enough trouble so end-bearing H-piles range between 8 and 100 feet long in a single pile cap and tiebacks ran

    Jan 1, 2006

  • AUSIMM
    Structural Controls in the Tarnagulla Goldfield, Central Victoria: Implications for Metamorphically Derived Auriferous Fluids

    By V Morand, W R. H Ramsay

    Structural, mineralogical, and textural data from the Tarnagulla Goldfield demonstrate that the area has undergone three significant phases of deformation. The first phase of deformation (D1) predates

    Jan 1, 1995

  • SME
    Lead-Zinc Exploration At Gays River District, Nova Scotia ? Summary

    By Patrick Hannon

    In this presentation, it is intended to briefly describe some occurrences of lead-zinc mineralization in Mississippian carbonates of central Nova Scotia. Results of geophysical and geochemical prospec

    Jan 1, 1975

  • CIM
    Comparative tests of two operating procedures for the Turam electromagnetic prospecting system conducted at the McClean uranium deposits in northern Saskatchewan

    By K. Duckworth

    "Comparative tests of the conventional Turam survey configuration and an alternative configuration called the Tx-parallel configuration were conducted at the McClean uranium deposit in northern Saskat

    Jan 1, 1988

  • DFI
    Video Inspection Of Rock Sockets For A Piling Project

    By Ali Ameli

    Design loads are limited for piles relying upon toe stresses in rock due to uncertainty about the rock quality over the whole pile diameter because of rock mass properties or construction effects. Th

    Jan 1, 2006

  • SME
    Increasing Kaltim Prima Coal Overland Conveyor Speed To 8.5 MPS

    By Poltak Sinaga

    PT Kaltim Prima Coal?s 13.1 km overland conveyor (OLC) was commissioned in 1991. It is of conventional 3 roller 350 trough belt type. Cost and performance optimization during initial design ended up w

    Jan 1, 2008

  • ISEE
    Modeling Effect of Delay Scatter on Peak Particle Velocity of Blast Vibration Using a Multiple Seed Waveform Vibration Model

    By R Yang, M Lownds

    This paper reports studies showing the effects of delay scatter on the peak particle velocity (PPV) of blast vibration using a multiple seed wave (MSW) vibration model developed in recent years. The c

    Jan 1, 2011

  • DFI
    Elimination Of Heave Forces On Lightly Loaded Piles In Swelling Clay - Summary

    By Basem Sh. Hazzan

    In the last four decades significant effort has been devoted to designing piles in expansive clay soils. Nevertheless, only a scant effort has been devoted to the elimination of heave forces acting on

    Jan 1, 1999

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo

    Jan 1, 2005

  • DFI
    First Quality Tissue Plant, Lock Haven, Pennsylvania: A Case Study Of Drilled Displacement Dewaal Piles ? Introduction

    By Gordon King

    The site of the First Quality Tissue plant is located on a previous paper production facility in Lock Haven, Pennsylvania. The new development, which included the construction of a tissue machine buil

    Jan 1, 2004

  • DFI
    Operator Independent Installation Of Lime Cement (L/C) Columns

    By Tobias Hansson

    The quality of Lime Cement (L/C) columns is to a great extent dependent on the installation procedure. At a site in the south of Sweden, the client reported problems with the installed columns. To eva

    Jan 1, 2000

  • SME
    Hydrothermal activity and first characterization of hydrothermal mineralization and fluids from the Southern New Hebrides Arc (Vanuatu, SW Pacific)

    By Florian Häckel, Ulrich Schwarz-Schampera, Benjamin Bühring, Katja Schmidt, Dieter Garbe-Schönberg, KoschinskyM Andrea

    "The Vanuatu island arc and its adjacent back-arc basins form part of the southern New Hebrides subduction system in the southwestern Pacific Ocean within a triangle defined by the Solomon Islands, Ne

    Sep 1, 2014

  • ISEE
    Flyrock Prediction and Control in Surface Mine Blasting

    By J Lyall Workman, Peter N. Calder

    Flyrock can be a serious hazard associated with blasting. Many surface blasting accidents involving injury result from excessive flyrock beyond the protected blast zone. Numerous cases of equipment da

    Jan 1, 1994