Search Documents

Sort by

  • NIOSH
    OFR-100(2)-76 Development Of Pre-Mining And Reclamation Plan Rationale For Surface Coal Mines - Volume II Of III - Methods Of Data Acquisition

    VOLUME II Volume II, in conjunction with Volume I, is a general guide to the selection of cost-effective methods of site data acquisition in all geologic environmental, and socio-political circums

    Jan 1, 1976

  • DFI
    Some Problems Encountered During Pile Installation - Synopsis

    By [D. N. ] Naresh

    During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som

    Jan 1, 1996

  • CIM
    Performance of Rock Slopes during the 2010/11 Canterbury Earthquakes (New Zealand)

    By G. Archibald, M. McSaveney, J. Wartman, M. Yetton, C. Massey, C. Holden, A. Kaiser

    "The 2010/11 Canterbury earthquakes triggered many mass movements in the Port Hills including rockfalls, rock and debris avalanches, slides and slumps and associated cliff-top cracking. The most abund

    Jan 1, 2015

  • DFI
    USTA Geoseismic and Foundation Design Challenges

    By Athena C. Denivo, Pablo V. Lopez, Sissy Nikolaou, Alfred H. Brand, Ahmad Rahimian, Rudivien G. Josef

    "The United States Tennis Association (USTA) Billie Jean King National Tennis Center (BJKNTC) site is located in the northeastern portion of the Flushing Meadows Corona Park area of Queens, N.Y. The s

    Jan 1, 2015

  • AUSIMM
    Can We Stop a Black Swan Breeding? Advances in Bowties and Critical Control Management

    By M Andrew, H Reynolds, R Mills

    As the global mining industry continues to grapple with ‘black swans’ (high consequence / low frequency events) for health, safety and environmental losses, the focus is shifting from risk assessment

    Jun 22, 2016

  • SME
    Remediation Of The Abandoned Waste-Filled Marl Quarry Górka

    By Z. Kowalski

    In the non-operational ?Górka? quarry, there are situated both a waste disposal site of an area of 6.7 ha, containing approximately 1 million ton wastes from high aluminium content materials (incl. ab

    Jan 1, 2006

  • CIM
    Design of the Pierina Waste Dump

    By P. Mark. Hawley

    Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa

    May 1, 2002

  • CIM
    Design of the Pierina waste dump

    By R. Sharon, P. M. Hawley, X. Ochoa

    "Development of Barrick Gold’s Pierina gold mine in north-central Peru requires construction of a waste dump for disposal of nonore grade materials stripped from the open pit to expose the ore. The wa

    Jan 1, 2003

  • NIOSH
    OFR-39A-94-Vol. 1 Ergonomic Analysis Of Surface Taconite Maintenance Work - Final Report - Volume 1 ? Findings - Executive Summary

    The research described in this report was conducted under a cooperative research agreement between the U.S Bureau of Mines Twin Cities Research Center (TCRC), Cleveland-Cliffs Inc. (CCI), and three op

    Jan 1, 1994

  • SME
    Application of Fatigue Management Systems: Small Mines and Low Technology Solutions

    By B. M. Eiter

    The impact of fatigue is seen not only in its effect on the job performance of haul truck operators but also on the health of the operator and the productivity at the mine site. Its impact can even ex

  • ISEE
    Encounter with Potential Acidic Sulphate Soil (PASS) and Bulk Emulsion Reaction in a South Africa Iron Ore Mine

    By Dirk Voogt, Quentin Steyl, D. Scott Scovira

    A South Africa iron ore mine reported a decline in blast performance and ore and waste fragmentation. Preliminary investigation by the explosives services company found that the straight gassed bulk e

    Feb 6, 2023

  • AUSIMM
    Protection of Sacred Sites in the Northern Territory

    The role and policies of the Aboriginal Sacred Sites Protection Authority are described in conjunction with the provisions of the N.T Aboriginal Sacred Sites Act 1978. Comment is made on the appli

    Jan 1, 1984

  • ISEE
    How Complexity Analysis contributes to blasting practice

    By Marilena Cardu, Mauricio Dompiri, Jacopo Seccatore

    Blasting in geological bodies is an industrial process acting in an environment characterized by high uncertainties (natural joints, faults, voids, abrupt structural changes), which are transposed int

    Jan 1, 2011

  • AUSIMM
    An estimation error

    By D A. Sims

    This paper outlines the contributing factors to a series of erroneous Mineral Resource estimates which led to considerable loss, including significant reduction of mine life and consequently a large w

    May 24, 2023

  • SME
    Critical comparison of numerical stress analysis tools for deep coal longwall panels under strong strata - SME Transactions 2009

    By M. K. Larson, J. K. Whyatt

    Proper employment of numerical stress analysis design tools is based on the demonstrated ability of a model to capture key elements of the geologic site model and accurately simulate how these element

    Jan 1, 2009

  • SME
    Carrier Flotation For The Removal Of Radionuclides From Contaminated Soils (PREPRINT NUMBER 96-14)

    By E. H. Cho

    A current environmental concern is the cleanup and restoration of soil contaminated with low-level radionuclides at DOE sites including the Nevada Test Site. At the present, there is no applicable pro

    Jan 1, 1996

  • SME
    Environmental approach to coal refuse disposal (Technical Paper)

    By A. G. Sciulli, G. P. Ballock, K. K. Wu

    This paper discusses common environmental problems associated with coal refuse disposal. It suggests design concepts to minimize potential hazards. Discussion focuses on site selection, embankment des

    Jan 1, 1987

  • AUSIMM
    Planning for Optimal Post Mining Land Use

    By Thatcher R

    In areas where undeveloped land represents a scarce resource, an upgraded post mining land use can result in economic benefits to both the mining company and to the community. A study undertaken at

    Jan 1, 1987

  • AUSIMM
    Computer Simulation Studies on the Mechanisms of Toxic Element Incorporation in Jarosite

    By A M. L Smith, W E. Dubbin, K A. Hudson-Edwards

    Jarosites (KFe3(SO4)2(OH)6) are examples of minerals that are highly effective scavengers of toxic elements, and are abundant in acid rock drainage systems, acid sulfate soils, metallurgical wastes an

    Jan 1, 2008

  • SME
    An Overview Of Coalbed Methane Recovery Activities From A Deeply Buried Coal Seam

    By Jeff Schwoebel, Arcy, D&apos Horner

    The Deep Coal Seam Project is a multi- year, large-scale research and development effort between the Gas Research Institute (GRI) and Resource Enterprises, Inc. (REI). The project is being conducted a

    Jan 1, 1987