Search Documents

Sort by

  • SME
    Design And Construction Of The Soudan 2 Detector Laboratory

    By D. Lee Petersen, Charles R. Nelson, Marvin Marshak

    INTRODUCTION Construction is underway on a laboratory cavern 713 m below surface at the Soudan Mine, Tower-Soudan State Park, in northeastern Minnesota. The 13.9 in wide by 11.6 m high by 71.8 in l

    Jan 1, 1985

  • AUSIMM
    Latest Experience with Dust Suppression in Tunnelling

    By Girnau G

    The necessity of effective dust suppression measures during excavation work is just as uncontroversial in tunnelling as it is in mining. In many respects, in fact, the applied technology is compara

    Jan 1, 1987

  • CIM
    The use of Multispectral Remote Sensing to Map Reclaimed Areas at Highland Valley Copper

    By Mark Richards

    Highland Valley Copper is a large, open-pit copper mine in the southern interior of British Columbia. Reclamation has been in progress on the site since 1987. Some 6,300 hectares will have been distur

    May 1, 2003

  • AUSIMM
    Application of Centrifuge Modelling to Assess Long-Term Brine Migration in Thick Clay Tills, Saskatchewan, Canada

    By L Cooper, J Sharma, M J. Hendry

    Thick clay tills below potash mine tailings and brine ponds are important natural barriers protecting fresh water aquifers in Saskatchewan. Centrifuge modelling was applied to assess geochemical proce

    Jan 1, 2003

  • CIM
    Processing Practice at Central Canada Potash

    By W. Hrynewich

    "The Central Canada Potash facility, a division of Noranda Metal Industries Limited, is located 3 kilometres south of the junction of Highways 16 and 2, about 75 kilometres south-east of Saskatoon, Sa

    Jan 1, 1982

  • AUSIMM
    Control System Improvement Through Alarm Reduction

    By R West

    The Olympic Dam smelter facility processes copper concentrate feed using direct-to-blister smelting technology to support the current site production rate of 225 000 t/a copper. The metallurgical cont

    Jan 1, 2005

  • NIOSH
    RI 7483 Removing Sulfur Dioxide By Carbon Monoxide Reduction

    By L. A. Haas

    The feasibility of removing sulfur dioxide by carbon monoxide reduction in a fixed-bed catalytic reactor was investigated by the Bureau of Mines. The reduction rate of sulfur dioxide with carbon monox

    Jan 1, 1971

  • SME
    Pre-Mining Bed Sediment Geochemical Baseline in the Animas River Watershed, Southwestern Colorado

    By Robert Blair, David L. Fey, Stanley E. Church

    Determination of the pre-mining geochemical baseline in bed sediments in watersheds impacted by historical mining activity is important in establishing watershed restoration goals. We have developed m

    Jan 1, 2000

  • AUSIMM
    Integration and Optimisation of Blasting and Comminution Processes

    By D La Rosa, A Jankovi, A Dance, W Valery

    This paper presents the methodology for optimising blasting and comminution processes in terms of fragmentation developed by Metso Minerals Process Technology Asia-Pacific and South America (MMPT). Th

    Jan 1, 2007

  • SME-ICGCM
    The Effects of Longwall Coal Mining on the Hydrogeology of Southwestern Pennsylvania

    By Megan N. Witkowski

    The purpose of this study is to investigate the susceptibility characteristics of domestic and agricultural water supplies that may be vulnerable to diminution or total loss of supply when active long

    Jan 1, 2011

  • DFI
    Design, Construction, And Instrumentation Of An Atypical A-Frame Micropile Wall In Aspen, Colorado

    By Kyle Kershaw

    Micropiles are routinely used in the United States for foundation support and stabilization of slopes. In recent years, several retaining walls have been constructed using micropiles in an A-frame ty

    Jan 1, 2007

  • AIME
    Overland Conveyor Hauls 40 Million Tons Of Coal 4 1/2 Miles

    By R. F. Slack, J. C. Draper, J. A. Younkins

    In 1959, the Duquesne Light Co. was faced with the problem of moving more than 40 million tons of bituminous coal in Greene County, Pa. The coal had to travel a distance of about 4 ½ miles from a new

    Jan 11, 1966

  • AUSIMM
    Grade Control at a Multi-Source Operation - Mount Isa Lead Mine, Mount Isa

    By N Davies, M J. Coward, P L. Hissey

    Mount Isa Mines has four mining operations in Mt Isa with the X41 and Enterprise Mines producing copper and the Lead Mine and George Fisher producing lead zinc and silver. Each stream contributes ore

    Jan 1, 2002

  • SME
    Effects of Coal Mine Subsidence on Shallow Ridge-Top Aquifers in Northern West Virginia

    By Eberhard Werner

    Existing reports on the effects of mine subsidence on water wells and springs appear to be inconsistent. Some report quick and complete recoveries to pre-mining conditions while others indicate long-t

    Jan 1, 1986

  • SME
    Time Dependent Roof Deterioration At A Central Ohio Coal Mine

    By Ted Klemetti

    Roof deterioration in weak moisture-sensitive rock leads to roof falls in coal mines. An observation site was set up in intake air at an underground coal mine in central Ohio to evaluate the time-dep

    Jan 1, 2009

  • AUSIMM
    A Regional Regolith-Landform Framework for Mineral Exploration Models in the Broken Hill Region

    By Eggleton R. A, Taylor G

    As the search for major orebodies continues, the regolith dominated areas of the Broken Hill region remain one of the major exploration frontiers. The past exploration philosophies emphasising bedr

    Jan 1, 1997

  • AUSIMM
    Enhancing energy efficiency and reducing water consumption in TowerMill circuit through design and optimisation

    By H Ishikawa, S Palaniandy

    The gravity-induced stirred mill such as the TowerMill is an energy-efficient grinding solution used in secondary, tertiary, and regrinding duties in the mineral processing concentrator. The interest

    Aug 24, 2022

  • AUSIMM
    A Case Study of Water Management on Closure of an Open Pit Mining Operation in North Queensland, Australia

    By P Ritchie, E H. Briese, N A. Currey

    Kidston Gold Mines, located in semi-arid North Queensland, Australia is currently in its closure phase. Highly innovative and comprehensive rehabilitation strategies were employed at the site, includi

    Jan 1, 2003

  • TMS
    Strategies And Practices For Handling Mine Wastes At The Sudbury Operations Of Inco Limited

    By C. E. Hunt

    Since the turn of the century, copper-nickel sulphide ores have been processed at the Sudbury, Ontario operations of INCO Limited, currently the largest integrated mining, milling, smelting and refini

    Jan 1, 1992

  • SME
    Eskay Creek Mine And Mill -A Continued Success (2a3befbd-b7b6-4860-b016-6f19cfa40d34)

    By G. Biles

    The Eskay Creek Mine, a high-grade gold and silver underground mine in northwestern British Columbia started operations in late 1994. For the first three years of operation, ore was crushed to minus 2

    Jan 1, 1999