Search Documents

Sort by

  • NIOSH
    IC 8667 Pumped-Slurry Backfilling Of Inaccessible Mine Workings For Subsidence Control - With An Appendix On Hydraulic Model Studies For Backfilling Mine Cavities By E. J. Carlson, Bureau Of Reclamation, Denver, Colo.

    By Ralph H. Whaite

    In undermined urban areas, new solutions to subsidence problems are being sought. The Bureau of Mines is investigating a hydraulic backfilling technique whereby fill material is pumped as a slurry thr

    Jan 1, 1975

  • DFI
    Augered Cast-in-Place Pile Manual, Second Edition, 2003

    The development of Augered Cast-In-Place (ACIP) piles started in the late 1940's when several projects were performed by Intrusion-Prepakt, Inc. utilizing various techniques to place the piling.

    Jan 1, 2003

  • CIM
    Recovery of coarse Liberated Gold Particles Using Pneumatically Assisted Fluidized Bed Flotation

    By L. Vollert

    "The application of pneumatically-assisted fluidized bed flotation, specifically the ERIEZ HydroFloatTM technology, has found widespread use in non-sulphide processing (particularly phosphate, potash

    Jan 1, 2017

  • CIM
    Incorporating Ventilation Fan Plants in Rail and Vehicular Roadway Overbuilds

    By R. E. Ray

    "As real estate for new development in urban settings becomes scarce, commercial high rises are being constructed above open passenger rail tracks and vehicular roadways. Rail and roadway overbuilds a

    Jan 1, 2019

  • DFI
    Driven Piles In Central Texas Expansive Soils

    By Clayton A. Signor

    Abstract: Expansive soils cause more damage to structures annually than a combination of other major natural disasters. Because of the cost to our society, all means and methods need to be fully expl

  • CIM
    Discovery and first production of diamonds in the Northwest Territories

    By Jon A. Carlson, W. Scott Williams

    The EKATI"" Diamond Mine commenced operation in October 1998. It is operated by BHP Diamonds Inc., which is a part of the Non-Ferrous and Industrial Materials Division of BHP Minerals, a business unit

    Jan 1, 2001

  • SME
    High Altitude Passive Water Treatment System Design And Construction For Leach Pad Effluent

    By K. Whiting, R. Huffsmith, R. Olsen, D. Adams

    Long-term closure alternative selection for heap leach pad effluent is a daunting task. Passive water treatment, if designed with enough long-term capacity, can minimize long term O&M while meeting w

    Jan 1, 2002

  • ISEE
    Blast Optimization Using both the Multiple Blasthole Fragmentation (MBF)and Multiple Seed Waveforms (MSW)Models at an Open Pit Metal Mine

    By J. P. Proulx, Richard O’Meara, Ruilin Yang

    A blast optimization project was carried out at an Open Pit Metal Mine using the Multiple Blasthole Fragmentation (MBF) Model and the Multiple Seed Waveform (MSW) blast vibration model. The aim of the

  • AUSIMM
    A Case History of a Deep Excavation in a Big Circular Shaft in Singapore Marine Clay

    By H Zhang, A Lawrence

    To accommodate the fast growing need for services in Singapore’s Marina Bay downtown area, Marina South, the construction of a common services tunnel (CST) was required. The CST includes various servi

    Sep 17, 2014

  • NIOSH
    RI 9338 Subsidence Over the End of a Longwall Panel

    By Paul W. Jeran

    Subsidence was monitored by the U.S. Bureau of Mines over the ends of longwall panels operating in the Pittsburgh, Kittanning, and No. 2 Gas Coalbeds of the northern Appalachian Coal Basin. The final

    Jan 1, 1991

  • AUSIMM
    Fused sensors for slope deformation monitoring – considerations for iron ore mines

    By P Dean, M Elmouttie

    Radar monitors are now widely used in surface mining for monitoring slope deformations and predicting failure events. Their introduction has facilitated better management of risk associated with slope

    Nov 8, 2021

  • CIM
    Modification of the Stillwater Base Metals Refinery Process

    By L. Newman, R. Wyrick, R. Berezowsky

    The Stillwater Mining Company operates an integrated mines, mill, smelter and base metals refinery complex in Montana, USA for the production of a high-grade platinum group metals (PGM) bearing concen

    Jan 1, 2004

  • SME
    Reaffecting Previously Mined Areas: Remining ? Introduction

    By L. B. Phelps

    The nation is confronted with thousands of acres of abandoned coal lands. In Pennsylvania alone, these lands have been estimated to cost $15 billion to reclaim (Pennsylvania Bulletin, 1985). One way t

    Jan 1, 1987

  • SME
    Paste Backfill System Designs For Operating Hard Rock Mines

    This paper summarizes the process development behind the design of three different types of paste fill plants at operating Canadian hard rock mines. Each application has a unique paste backfill mix an

    Jan 1, 1994

  • AUSIMM
    Cyanide Code Recertification - The Three-Year Challenge

    By R J. Beazley, M C. Woods

    "The International Cyanide Management Code (the Code) is a voluntary industry program for gold miners and associated cyanide transporters and cyanide producers. By becoming a signatory, a company comm

    Sep 26, 2013

  • NIOSH
    RI 6165 Noise From Pneumatic Rock Drills: Measurement And Significance ? Summary

    By William C. Miller

    This report describes investigations by the Bureau of Mines designed to establish the noise level and spectrum of various types of pneumatic rock drills and to furnish information that would be useful

    Jan 1, 1963

  • SME
    Calibration of a Coal-Mass Model Using an In Situ Coal Pillar Strength Study

    By J. A. Rusnak, K. M. Mohamed, M. A. Van Dyke, M. M. Sears, G. Rashed

    "Researchers from the National Institute for Occupational Safety and Health (NIOSH) recently developed a coal-mass model to realistically simulate the deformation and loading behaviors of the ribs of

    Jan 1, 2018

  • AUSIMM
    Investigations for Proposed Upgrade of the Homer Tunnel, New Zealand

    By A D. Campbell

    The Homer Tunnel is located in a remote area of the South Island of New Zealand and carries large numbers of tourists to Milford Sound through an avalanche prone area. The tunnel is 1280 m long with a

    Mar 8, 2011

  • AUSIMM
    Managing continuous improvement of Mine to Mill begins with measurement

    By J Loeb, R Ramanathan, H Ingham, P Cameron

    Most mining operations, including iron ore, maintain a focus on continuous improvement and asset optimisation in their operations. As all the unit operations in the Mine-to-Mill value chain are interd

    Nov 8, 2021

  • DFI
    As-Built Analysis - An Integral Part Of Pile Foundation Design

    By Dan Yang

    Pile foundation designs are performed routinely based on geotechnical information available at the time of design, often with due consideration of large uncertainties inherent to soils and site condit

    Jan 1, 2010