Search Documents

Sort by

  • SAIMM
    Visit to Hendrik Verwoerd Dam

    On 23rd October, 1969, 54 members of the Institute set out at an early hour from Rand Airport in two chartered Dakota aircraft for a visit to the Hendrik Verwoerd Dam site. The weather was at the star

  • AIME
    Minerals Beneficiation - Collector Adsorption and Surface Change Density

    By A. S. Joy

    Vacuum flotation tests carried out according to the method of Schuhmann and Prakash1 have shown that the acid limiting edge of the flotation area for a Brazilian hematite, in the presence of dodecylam

    Jan 1, 1964

  • AUSIMM
    Discharge Chemistry From Above-Drainage Underground Mines in 1968 and 2000

    By J Demchak, L M. McDonald

    The duration of acid mine drainage flowing out of underground mines is important in the design of watershed restoration and abandoned mine land reclamation projects. People conducting land reclamation

    Jan 1, 2003

  • AIME
    Granduc Operating Company - Tide Lake, British Columbia

    Granduc lies near the Alaskan border in British Columbia, about 600 miles (960 km) north of Vancouver. Prospecting in the area must take place in the short summer months of fog and rain because the wi

    Jan 1, 1978

  • AIME
    Disposal Of Mill Tailings At The Holden Concentrator

    By V. A. Zanadvoroff

    THE mine and concentrator of the Howe Sound Co., Chelan Division, are at Holden, in a remote section of the Cascade Mountains of northwestern Washington. Holden is at an elevation of 3200 ft., in the

    Jan 1, 1946

  • AIME
    Geophysics - Heavy Metals in Stream Sediment as an Exploration Guide

    By H. Bloom, H. E. Hawkes

    STREAMS and rivers are the principal channels into which the weathering products of rocks and their contained ores are funneled. The inorganic load of a stream system is a crude sample of all the eart

    Jan 1, 1957

  • AIME
    PART III - A Study of Factors Affecting Silicon Growth on Amorphous SiO2 Surfaces

    By Earl G. Alexander, W. R. Runyan

    The nature of silicon growths which form on amorphous silicon dioxide during epitaxial deposition in unmasked areas was investigated. Octahedral silicon crystals nucleate and grow on the oxide at pinh

    Jan 1, 1967

  • AUSIMM
    Planning for the Future – Development of Beneficial End Use from a Quarry Pit Lake, Victoria, Australia

    By C D. McCullough, M Gerner

    Rarely do opportunities arise allowing closure of a mine site to be planned as a key beneficial land use asset within a new urban growth area; particularly so well prior to cessation of mining.Pit lak

    Jul 16, 2014

  • AIME
    The Temperature Range Of Martensite Formation

    By H. M. Stewart, R. A. Grange

    MANY steel parts may crack if quenched directly into a bath near room temperature, but not if quenched at a temperature just above the range where martensite forms and then allowed to cool slowly to r

    Jan 1, 1946

  • SME
    Making Informed Operational Decisions For Water Management At A Remote Legacy Mine Using A Probabilistic Water Balance Model - SME Annual Meeting 2022

    By C. Anderson, D. Kolstad, M. Unger

    Operators are often challenged with the management of water throughout the life cycle of a mine. High water levels can lead to physical or chemical instability of water-retaining structures. Operators

    Mar 2, 2022

  • SME
    Examinations. Valuation And Reports

    By James Donald Forrester

    JAMES DONALD FORRESTER 32.1-EXAMINATIONS The field examination of a mineral deposit or mining enterprise requires a comprehensive effort to determine all natural and man-made factors bearing upo

    Jan 1, 1973

  • DFI
    Ultimate Bearing Capacity of Small-Diameter Pin-Piles and the Influence of Driving Penetration Resistance

    By Glen Mann, H. G. Vestberg, Robert D. Holtz

    "Underpinning of residential and commercial structures is often accomplished using a number of driven-in-place small diameter steel pipe piles. These piles, at least in the Seattle area, are typically

    Jan 1, 2005

  • NIOSH
    OFR-46(1)-81 Risk Analysis For Rock Slopes In Open Pit Mines - Final Technical Report - Part I - Distributions Of Rock Mass Properties

    By Herbert H. Einstein

    The thrust of research reported in Part I was to collect in-situ data from exploration programs and the published literature, and to empirically establish distributional patterns for these variables.

    Jan 1, 1979

  • SME
    The Critical Pillar Concept In Yield Pillar-Based Longwall Gate Road Design

    By J. R. Koehler

    Yield pillar-based gate road designs oftentimes fail to provide mine operators with adequate ground control because of the unknowing misemployment of "critically" sized pillars. A "critical" pillar is

    Jan 1, 1995

  • SME
    Spoil Management at AlpTransit Ceneri Base Tunnel - Key elements for a successful natural resource management

    By Emanuele Catelli, Paolo Vicentini, Manuel Petitat, Paolo Lanfranchi

    "More than 800 million tons of material will be excavated during large underground projects such as tunnels, undergrounds and power plants by 2030 in Europe only. The raw material excavated is often c

    Jan 1, 2016

  • AUSIMM
    Key insights for the successful implementation of proximity detection and collision avoidance technology for reducing vehicle interaction risk – a surface technology provider perspective

    By C Hoffmann

    Given that each year, 30–40 per cent of mining industry deaths are attributable to failures of vehicle interaction controls (EMESRT, 2023), the mining industry is now armed with a growing body of know

    Apr 16, 2024

  • DFI
    Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River Gorge

    By Brian J. Olson, Kevin Haiar

    Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re

    Sep 8, 2021

  • NIOSH
    OFR-25-80 Cost And Time Analysis Of The Mining And Environmental Requirements In The Premining Stage For Copper Mining In The Northern Highland, Wisconsin

    By James P. Ludwig

    This report provides the results of a two year study of the projected time and cost requirements for new mine development in Wisconsin and is based on a unique blend of information from mining company

    Jan 1, 1979

  • AUSIMM
    Staying in the Game – the Importance of Engineering-based Decisions

    By P J. Fairfield

    This paper reflects on the author’s experience working in site-based technical and management roles over a 29 year period, and the past 12 years in internal and external consulting roles. It discusses

    Jun 22, 2016

  • SME
    Preliminary optimization of a single-layer cover made of desulfurized tailings: application to the Doyon Mine tailings impoundment - SME Transactions 2009

    By I. Demers, A. Blier, M. Mbonimpa, M. Benzaazoua, B. Bussière

    The Doyon Mine in Quebec, Canada, evaluates the possibility of desulfurizing its tailings to produce material to be used as cover for the acid-generating tailings disposal site. Laboratory tests showe

    Jan 1, 2009