Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Tunneling Under Pleasure Bay with an Open-Face TBM - RETC 2021
By Joshua Farmer, Mike Gianforte, Tao Jiang, William Gettings
The Two Rivers Water Reclamation Authority (TRWRA) in Monmouth County, New Jersey, is replacing its aging Pleasure Bay Interceptor (PBI) with a new 54-in interceptor in a 3,250-foot long 8 to 10-foot
Jun 13, 2021
-
Courthouse Commons Inmate Transfer Tunnel: Tunneling Through San Diego Using Alternative Delivery - RETC2021
By Sam Lo Grasso, Carlos Herranz Calvo, Stuart Warren, Ted Giesing, Charles Marchesano
Mott MacDonald and Project Management Advisors are providing Technical and Project Management services for San Diego County for the Courthouse Commons Project. The Courthouse Commons Project involves
Jun 13, 2021
-
Tunneling Beneath Downtown Bellevue on Time and Under Budget - RETC2021
By Ted DePooter, Mun Wei Leong, Chad Frederick
Downtown Bellevue Tunnel (DBT) is part of Sound Transit’s $3.7 billion, 14-mile light rail transit system from downtown Seattle, across Lake Washington, to the cities of Mercer Island, Bellevue, and R
Jun 13, 2021
-
Remote Vein Miner—Uncovering an Opportunity for Tunneling Projects - RETC2021
By Jamal Rostami, Mark Board, Clayr Alexander, Muthu Vinayak Thyagarajan
In the past several decades, many major equipment manufacturers have ventured into developing new technology for underground hard rock excavation. This includes variety of configurations for full and
Jun 13, 2021
-
Mechanism of Advancing Drift on Weak Ground Excavation - RETC2021
By Sadatoshi Ohmori, Karen Shinoda, Nobuharu Isago
Method of tunnel excavation is generally classified such as full-face excavation, bench-cut excavation, diaphragm with center pillar excavation, center drift advancing excavation and so on. These exca
Jun 13, 2021
-
Second Narrows Water Supply Tunnel—Final Design, Procurement and Construction - RETC2021
By Gregg W. Davidson, J. Andrew McGlenn, Frank Huber
The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet the long-term needs of a g
Jun 13, 2021
-
Tunnel Design Aspects for the New Haven Downtown Storm Sewer Infrastructure Improvement Project - RETC2021
By Michael Schultz, Gregory Sanders
The City of New Haven is proposing to construct Downtown Storm Sewer Infrastructure Improvement project to mitigate on-going stormwater flooding in the Long Wharf District. The proposed project includ
Jun 13, 2021
-
Application of Surrogate Modeling for SEM Tunneling Simulation
By Christophe Bragard, Marte Gutierrez, Haotian Zheng, Michael Mooney
This paper proposes a framework for applying surrogate-based approaches to evaluate SEM construction, which can both benefit the uncertainty analysis in the design stage and real-time calibration duri
Jun 13, 2021
-
Laboratory Study of Clay Clogging Issues for EPB TBM Tunneling Applications - RETC2021
By Jamal Rostami, Wei Hu
Efficient performance of EPB TBMs in clayey ground is primarily dominated by the flow capability of the excavated muck in the cutterhead and screw conveyor. Currently, Consistency Index approach is us
Jun 13, 2021
-
A New Era of Tunneling Planned for Houston—Going Deep to Solve Regional Water Supply, Wastewater, and Drainage Problems - RETC2021
By Eric Hansen, Todd Wanless, Chris Mueller, Shannon Dunne, Scott Elmer
Between 2010 and 2018, Houston added more than 1 Million residents; the third largest rate of growth in the nation. With growth, the region faces new challenges with water supply, capacity of its wast
Jun 13, 2021
-
Effect of Muck Transportation System on Overall TBM Performance and Downtimes - RETC2021
By J. Rostami, P. P. Nelson, A. Khetwaln
Tunnel boring machines (TBMs) can be considered as the method of choice for tunneling in many projects due to the high level of efficiency and high potential productivity, safety, and applicability in
Jun 13, 2021
-
Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021
By David Mast, Irwan Halim, Seung Han Kim
Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,
Jun 13, 2021
-
Back on Track: The Downtown Rail Extension - RETC2021
By Meghan M. Murphy, Derek Penrice
The Downtown Rail Extension (DTX) is principal element of the planned second phase of the Transbay Joint Powers Authority’s (TJPA) Transbay Program. When complete, this regionally critical project wil
Jun 13, 2021
-
Pre-Excavation and Early Work Activities for the Long Baseline Neutrino Facility Far Site - RETC2021
By Josh Willhite, Seth Pollak, Ben Seling
The Long Baseline Neutrino Facility Far Site at the Sanford Underground Research Facility in Lead, South Dakota will house four large detector tanks located in deep underground caverns. Construction o
Jun 13, 2021
-
Slurry Treatment Plants in Mechanized Tunnelling Operations— Safety, Performance and Cost Factor for Jobsites - RETC2021
By Gino Vogt
In mechanized tunnelling operations performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operations
Jun 13, 2021
-
Short Startup for a High Pressure Mixshield Tunnel Boring Machine - RETC2021
By Matthew Burdick, Andrew Rule, Erica Bailey
The Second Narrows Water Supply Tunnel, Burrard Inlet Crossing project for the Greater Vancouver Water District entails deep shaft construction, subway sized pressurized face tunneling through highly
Jun 13, 2021
-
Verification and Update on High Pressure Concrete Plug Leakage Remediation - RETC2021
By Seung Han Kim, Andrew Yu, Carlos Jaramillo, Chu-Chieh Jay Lin
The Penstock Access Tunnel (PAT) concrete plug is a reinforced concrete plug separating the pressure tunnels from the personnel accessible tunnels and has leaked since the first filling at the Helms P
Jun 13, 2021
-
Mechanical Versus Manual Shotcrete Application in Underground Construction - RETC2021
By Lauro Lacerda
Shotcrete is a highly adaptable and widely used underground construction material at infrastructure and mining projects around the world. In fact, many projects could not have been completed without i
Jun 13, 2021
-
Kramer Tunnel—Challenging NATM Tunnelling in Germany’s Alps - RETC2021
By Roland Arnold, Richard Gradnik, Martin Zeindl
This paper presents the details of the Kramer tunnel project in the Federal State of Bavaria, Germany. This road tunnel, which has been under construction since December 2019, is the key component of
Jun 13, 2021
-
Potential Pathways forMining Operations to Transition to Renewable Energy—a Case Study - Mining, Metallurgy & Exploration (2021)
By Oliver W. Marsden, John O. Marsden
This paper presents the results of a hypothetical case study that evaluates the potential transition of a large copper mining and extraction operation to 90% renewable energy. The case study considers
Jun 4, 2021