    Bridging the Gap—From Borehole Spacing to DSC Claim Resolution - NAT2022

    By Kapila Pathirage, Michael S. Schultz, Gregory Sanders, Ulf G. Gwildis

    Adequate understanding of the subsurface conditions along the alignment of a planned tunnel is key for managing project risk. For achieving this understanding, geotechnical borings are conducted durin

    Dec 1, 2022

  • SME
    Characterizing Gassy Ground and Its Importance - NAT2022

    By Barry R. Doyle, Emma C. Ross

    This paper presents a 20-year global account of tunneling in gassy ground demonstrating high probability of schedule delays, cost overruns, worker injuries and fatalities. Causes of these failures are

    Dec 1, 2022

  • SME
    Connecting Three Pump Stations, with Tunnels, on an Island, in Charleston, SC - NAT2022

    By Justin Kolster, Donald Benjamin, Kyle White

    Expansion of the Plum Island Wastewater Treatment Plant requires interconnection of three operating pump stations using only two existing 10-ft diameter shafts for access. These two existing shafts re

    Dec 1, 2022

  • SME
    Micro Seismic Monitoring and Analysis for Rock Burst Prone Tunnels Utilizing TBMs

    By G. A. Rosario, G. Peach

    Twin 8.5 m diameter, 10 km long headrace tunnels under overburdens of up to 1870 m were excavated for the neelum jhelum hydroelectric project in north-eastern pakistan using two main beam gripper tunn

    Dec 1, 2022

  • SME
    Slurry Treatment Plants in Mechanized Tunneling Operations— Safety, Performance and Cost Factor for Jobsites - NAT2022

    By Gino Vogt

    In mechanized tunnelling operations, performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operation

    Dec 1, 2022

  • SME
    Unique Challenges for the Construction of PATH’s Exchange Place Cross-Passage Tunnel - NAT2022

    By Todd Kilduff, James Grillo, Shrey Arora

    In efforts to improve ingress/egress from the existing subway platforms in PATH’s Exchange Place Station, a new 18-foot horseshoe cross-passage tunnel was constructed by Walsh Construction who retaine

    Dec 1, 2022

  • SME
    Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022

    By Irwan Halim, Seung Han Kim

    This paper will describe design of precast segmental tunnel lining for the Pawtucket CSO Tunnel Project in Providence, Rhode Island. The tunnel is 11,700 LF long with 30-foot finished diameter to be c

    Dec 1, 2022

  • SME
    The State of DRB’s in the Tunnel Industry - NAT2022

    By David Hatem, Michael Vitale, Joseph Gildner, Michael Roach, Fred Dunham

    Dispute Review/Resolution Boards (DRB’s) are a highly successful dispute avoidance and resolution tool. In a joint effort between the UCA of SME and the Dispute Resolution Board Foundation (DRBF), the

    Dec 1, 2022

  • SME
    Historic Rock Tunnel Rehabilitation—Designing for the Unknown - NAT2022

    By Ryan Marsters, Adam Pring, Robin Dornfest

    Raw water supply in the central Rocky Mountains often relies on trans-basin conveyance. Many of these older diversions incorporate high-elevation, miles-long tunnels driven over a century ago in hard

    Dec 1, 2022

  • IMMS
    Underwater Minerals Conference 2022 Abstract Booklet

    By NA UMC

    Abstract Booklet

    Dec 1, 2022

  • SME
    Mechanized Tunneling in Flowable River Sands—The TBM Drives of the Annacis Island WWTP New Outfall System - NAT2022

    By John Newby, Edward Kennedy, Ulf Gwildis

    Alluvial deposits of major rivers often provide relatively uniform tunneling conditions. However, these conditions pose specific challenges due to the tunneling behavior of the granular soils as flowi

    Dec 1, 2022

  • SME
    Analysis of Near Field Vibration Monitoring in Construction Blasting - NAT2022

    By Jim Buckley, Ryan Sibley, Scott G. Giltner, Thomas Pallua, Joe Schrank, Robert Cidlik

    Because of variation in rock type and site conditions, it is important to create site-specific prediction models for peak particle velocity (PPV) and understand instrumentation mounting locations to b

    Dec 1, 2022

  • SME
    TBM Breakthroughs in Pressurized Conditions—Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) and Northeast Boundary Tunnel (NEBT) Projects - NAT2022

    By Francesco Chiappalone, Filippo Azzarà, Raffaele Aliberti, Daniele Nebbia, Lance Waddell

    As part of the 3RPORT and NEBT Projects, 5-mile Combined Sewer Overflow Tunnels were excavated with a 19 ft diameter Slurry and 26 ft diameter EPB Tunnel Boring Machines. Due to the difficult geologic

    Dec 1, 2022

  • SME
    Flow Control in Tunnels - NAT2022

    By Darold Woodward, Stefan Haydn, Petr Pospisil

    Most fatalities in tunnel fires are caused by the spread of toxic smoke. Controlling the spread of smoke is crucial to provide a survivable environment for emergency egress. A properly designed and tu

    Dec 1, 2022

  • SME
    Keep ’Em Separated—Managing Contract Interfaces for the Westerly Storage Tunnel (WST) - NAT2022

    By Ryan P. Sullivan, Ben D. DiFiore, Robert J. Auber, Michael A. Piepenburg, Lisa M. Smiley

    Pollution to Lake Erie will be significantly reduced by the Westerly Storage Tunnel (WST) system, which is mainly comprised of a 10,000-ft long tunnel and a dewatering pump station in the downstream t

    Dec 1, 2022

  • SME
    Updating the GBR Gold Book - NAT2022

    By David Hatem, Paul Madsen, Daniel Adams, James Morrison, Randall Essex

    Managing commercial risks associated with subsurface construction may be the greatest challenge the underground industry faces. The Geotechnical Baseline Report (GBR) was developed in the U.S. to help

    Dec 1, 2022

  • SME
    San Diego Courthouse Commons Tunnel: Challenges and Design Solutions - NAT2022

    By Jeremy Stone, Yiming Sun, John Stolz

    The Courthouse Commons Tunnel facilitates the secure transfer of inmates between the County Jail and State Courthouse across a city block in downtown San Diego, California. This shallow tunnel was exc

    Dec 1, 2022

  • SME
    Design and Construction of Large-Scale Ventilation Caverns on WestConnex’s Rozelle Interchange Project - NAT2022

    By M. Trim, Y. Sun, D. Tepavac, A. Kumar

    Configuration of Rozelle Interchange Project’s ventilation system required design and construction of some of the largest and tallest underground civil caverns attempted in Australia. The paper focuse

    Dec 1, 2022

  • SME
    Karst Feature Investigation, Mitigation Design, Specification, and Contract Provisions - NAT2022

    By Alissa Lockett, Chris D. Breeds

    Central Water Integration Project (CWIP) Segment 5-1 is the most critical segment of a regional water supply project that transfers groundwater from Burleson County to northern San Antonio, replacing

    Dec 1, 2022

  • SME
    Innovative Approach for Dust Control in Tunnel Construction - NAT2022

    By Craig Allan

    Underground construction environments, especially those with limited airflow such as shafts, cross passages, and stations, necessitate effective dust control. This requires combining existing measures

    Dec 1, 2022