    Lateral Rock Load Estimation for Cut and Cover Structures - NAT2022

    By Charles Stone, Eric Wang

    A method for estimating geotechnical rock loads for shallow cut and cover subway stations is presented. Localized geotechnical conditions lead to extreme variations in rock loading on the walls of sub

    Dec 1, 2022

  • SME
    Design and Construction Challenges for the Ellicott City North Tunnel - NAT2022

    By Christopher Nelsen, Daniel Dobbels, R. Zachary Hollenbeck

    Recent major floods have inundated Historic Ellicott City, Maryland, resulting in loss of life and property damage. Howard County, Maryland, has developed the Ellicott City Safe and Sound Plan to miti

    Dec 1, 2022

  • SME
    Application of Large Diameter Single-Bore Tunnel for Subway Systems - NAT2022

    By Silas Li, Michael Harris-Gifford, Jason Choi, William H. Hansmire

    Twin-bore tunnels with a single track in each tunnel are currently the most common subway tunnel configuration. However, a large diameter single-bore tunnel with two tracks separated by a center wall

    Dec 1, 2022

  • SME
    Conventional Excavation of New Inlet/Outlet Tunnel for Newell Creek Dam, CA - NAT2022

    By Kexin Cai, Isidro Rivera, Shawna Von Stockhausen, Maria Chastka, Kevin Huynh

    The Newell Creek Dam Inlet/Outlet Replacement Project is located approximately 11 miles north of Santa Cruz, California along Highway 9 in the San Lorenzo Valley. This project will replace the existin

    Dec 1, 2022

  • SME
    TBM Tunnel Logistics Management on the Longest Outfall Tunnel in the Middle East - NAT2022

    By H Vigil, G. Peach

    Long tunnels with only one access shaft pose many program problems for logistics, combine these with the requirement to drive directly out under the seabed for 10.2 km, and the program issues become e

    Dec 1, 2022

  • SME
    Ground Improvement Works and Construction of Six SEM Adits as Part of the Northeast Boundary Tunnel Project in Washington, D.C. - NAT2022

    By Basilio Giurgola, Federico Bonaiuti, Norbert Fuegenschuh

    The North East Boundary Tunnel (NEBT) project in Washington, D.C. requires design and construction of several SEM adits which have to be built between lateral shafts and the NEBT-TBM Tunnel. The paper

    Dec 1, 2022

  • SME
    A Tunneled Solution for the Cemetery Brook Drain in Manchester, New Hampshire - NAT2022

    By Frederick McNeill, John Harper, Mahmood Khwaja, Shawn Lavoie, Timothy Cloughert, David Polcari

    City of Manchester, NH, is implementing a 20-year plan to control and significantly reduce overflow of its sewer system. The long-term control plan had called for large scale box culvert installation

    Dec 1, 2022

  • SME
    Amtrak East River Tunnels Structural Repairs and Reconstructions - NAT2022

    By Daniel McNamee, Wern-ping N. Chen

    The Amtrak East River Tunnels include four tunnels, Line 1 to Line 4, which extend from New York Penn Station in Manhattan, under the East River to Sunnyside Yard in Long Island City. Since fall 2015,

    Dec 1, 2022

  • SME
    Tunnel Rehabilitation Through Historic Landslides in Laguna Beach - NAT2022

    By Trenton Cohen, Joseph McDivitt, Shimi Tzobery, Joseph Sinacori, Scott Zylstra

    The 2-mile Beach Interceptor Sewer Tunnel was constructed in 1954 to then-current mining and construction standards. Due to its lifespan and deteriorating condition it is now being stabilized and reha

    Dec 1, 2022

  • SME
    How Correct are Geostatistical Models in Predicting Soil Transitions? - NAT2022

    By Hongjie Yu, Mike Mooney

    Transitions between geological/geotechnical soil units have a critical impact on the operation and performance of a tunnel boring machine (TBM). Geostatistics-based probabilistic modeling is used to q

    Dec 1, 2022

  • SME
    Implementing BIM Underground on Progressive Design-Build Atlanta Plane Train West Extension Project - NAT2022

    By Jeff Fontana, Daniel Ebin, Eric Westergren, William Currier

    The PMott MacDonaldlane Train Tunnel West Extension (PTTWE) Project at HartsfieldJackson Atlanta International Airport includes the extension of the existing automated people mover system and terminal

    Dec 1, 2022

  • SME
    Vintage TBM Cuts Months Off Schedule in San Antonio - NAT2022

    By Cody Edwards, Ross Webb

    5 miles of soft ground tunnel excavation for the SAWS W‑6 project finished months early despite difficult conditions. Success was achieved using TBMs and other equipment built long before most of the

    Dec 1, 2022

  • SME
    Lateral Deflections and Vertical Control in Tunnel Control Networks - NAT2022

    By Joern Katzer

    It is vitally important to any tunnel project to have an accurate and reliable survey control network inside the tunnel for layouts, as-built surveys, and to provide guidance to the tunnel boring mach

    Dec 1, 2022

  • SME
    Risk Modelling Techniques for Complex Tunnelling Projects from Deterministic to Probabilistic Methods: Have We Done Enough? - NAT2022

    By P. Sander, M. Spiegl, J. Reilly, A. Van Droogenbroeck

    Although the outdated idea of calculating risk as the deterministic product of its likelihood and impact is not entirely a thing of the past, a multitude of organizations have adopted the usage of pro

    Dec 1, 2022

  • SME
    A Case Study Establishing Optimization Techniques and the Procedure for Successful Numerical Simulation of Ground-Structure Interaction - NAT2022

    By Ali Keneti, Xavier Ryan, Gerardo Sanchez, Shannon Goff

    In this study, FLAC3D modeling was conducted for ground-structure stability assessment for a pilot tunnel passing under a large shaft excavated in the vicinity of existing structures at Karangahape St

    Dec 1, 2022

  • SME
    Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) City of Fort Wayne Tunnel Alignment and Adit Redesign in Construction: A Schedule Driven Journey - NAT2022

    By Todd S. Webster, Matthew J. Pierce, Brad D. Krumel

    With the Working Shafts and Starter Tunnel under way, it became apparent this 4.7-mile, 19-foot diameter wet weather tunnel was going to live up to its name. The shaft’s pre-excavation grouting was co

    Dec 1, 2022

  • SME
    The Use of Cloud-Based Geotechnical Software During the Final Design of the New Haven Downtown Storm Sewer Infrastructure Improvement Project - NAT2022

    By Michael Schultz, Gregory Sanders

    The City of New Haven is planning to construct the Downtown Storm Sewer Infrastructure Improvement project to mitigate on-going stormwater flooding in the Long Wharf District. The proposed project inc

    Dec 1, 2022

  • SME
    Improved Contracting Practices and Ground Risk Management Using Geostatistics - NAT2022

    By Jacob Grasmick, Bill Newns

    Despite ongoing digitization and “hardware” technological advances, geotechnical uncertainty remains the most significant risk in underground and tunnel construction. And, whilst they are commonly hel

    Dec 1, 2022

  • SME
    Deep Rock Wastewater Tunnel in Delco - NAT2022

    By Dafydd Chandler, Milissa Hirst, Charles Hurst, Gary Snyder, Leszek Glodkowski

    The Delaware County Regional Water Quality Control Authority (DELCORA) will be adding tunnel infrastructure to its wastewater conveyance system. This program involves the construction of a conveyance/

    Dec 1, 2022

  • SME
    Hybrid Shoring Design for the Courthouse Commons Tunnel in San Diego, California: Controlling and Predicting Ground Movements - NAT2022

    By Maryam Motamed, Jeremy Stone, Leigh Anne Zhang

    Controlling and predicting ground movements are essential to the design of shoring systems. The Courthouse Commons tunnel in San Diego, California, included a 56-foot-deep temporary shaft as a launchi

    Dec 1, 2022