Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Planning for State-of-Good Repair, Hazard Mitigation, and Resiliency for San Diego County Water Authority’s 2nd Aqueduct Water Supply Infrastructure - RETC2023
By Paul Taurasi, Mahmood Khwaja, Anjuli Corcovelos, William Brick
California’s San Diego County Water Authority provides a safe and reliable water supply to more than 3.3 million residents through twenty-four member agencies. The 2nd Aqueduct pipelines, a critical i
Jun 13, 2023
-
Metropolitan Water Tunnel Program in Massachusetts - RETC2023
By Rafael C. Castro, Paul V. Savard, Kathleen M. Murtagh
Preliminary design is underway for the Massachusetts Water Resources Authority’s (MWRA) next major tunnel program, the Metropolitan Water Tunnel Program (MWTP). The MWTP is the latest part of MWRA’s o
Jun 13, 2023
-
Los Angeles, California JWPCP Effluent Outfall Tunnel Project— Tunneling Under Extremely Challenging Conditions - RETC2023
By R. Schuerch, C. Cimiotti, M. Piemontese, N. Karlin, P. Perazzelli, P. Halton
The new Los Angeles, California JWPCP effluent outfall tunnel will transport secondary-treated effluent from the Joint Water Pollution Control Plant in Carson to White Point Manifold. The tunnel will
Jun 13, 2023
-
Using GIS Application for Inlet/Outlet Tunnel Geologic Mapping for Ground Support (CH Reservoir Case Study) - RETC2023
By Cory Bolen, Nadav Bar-Yaakov, Eric Zimmerman, Gregory Raines
The Chimney Hollow Reservoir Project broke ground in August 2021, constructing the tallest Asphalt Core Dam in North America, intending to improve reliability of drinking water supply to Northern Colo
Jun 13, 2023
-
Bypass Tunnel Shafts—Shotcrete Lining - RETC2023
By Paul Madsen, Bade Sozer, Thomas Hennings, Eileen Test
The Rondout Bypass Tunnel in New York has two access shafts. The upper sections of the shafts are lined with steel pipe to resist a substantial net internal water head . Initial design included a ¾-in
Jun 13, 2023
-
Atlanta—Plain Train Tunnel West Extension Project— Progressive Design-Build Risk Management Approach - RETC2023
By Jake Coibion, Elmira Riahi, Dominic Reda, Walter Klary, Vojtech Gall
Progressive Design-Build is becoming a more common delivery method in the tunneling industry. This approach allows the Owner to select a design-builder primarily based on qualification instead of lowe
Jun 13, 2023
-
Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023
By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline
Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump
Jun 13, 2023
-
Steep TBM Challenge for the Limberg III Pump Storage Power Plant Project - RETC2023
By Karin Bäppler
Hydropower produces almost two-thirds of the world’s renewable electricity generation and delivers a major contribution on the ambition of the Paris Agreement and Sustainable Development Goals (SDG) w
Jun 13, 2023
-
Record-Setting Tunnel Boring Below Lake Ontario at the Ashbridges Bay Outfall Tunnel - RETC2023
By Doug Harding
The 3.5 km long Ashbridges Bay Outfall in Toronto, Ontario, Canada was a challenging drive set below Lake Ontario. After a remote machine acceptance due to the global pandemic, an 8 m diameter Single
Jun 13, 2023
-
Enhanced Probe Drilling and Pre-Grouting Design and Recommendations on Hard Rock TBMs - RETC2023
By Stryker Magnuson
While probe drills are not strictly necessary for all projects, the incorporation and use of probe drills and pre-grouting adds capability and insurance to boring operations. Water ingress and unstabl
Jun 13, 2023
-
Missouri River Intake Screen Structure and Tunnel: Overcoming Underground Challenges to Build Vital Infrastructure - RETC2023
By Ryan Ward
The Missouri River Intake Screen Structure and Tunnel (MRISST) is one phase of the Red River Valley Water Supply Project (RRVWSP), a vital piece of infrastructure in the state of North Dakota to trans
Jun 13, 2023
-
SVCW Gravity Pipeline—Ground Movements During Construction - RETC2023
By Nik Sokol, Eric Sekulski, Leo Weiman-Benitez, Jon Hurt, Shrinidhi Vijayakumar, Phaidra Campbell
The Silicon Valley Clean Water (SVCW) Gravity Pipeline (GP) is the first Progressive Design Build (PDB) tunnel completed in North America. As part of the Regional Environmental Sewer Conveyance Upgrad
Jun 13, 2023
-
Direct Tensile Testing and CT-Scanning of Fiber Reinforced Shotcrete - RETC2023
By Denis Tepavac, Mark Trim
Structural performance of fiber reinforced concrete (FRC) depends on its ability to carry tensile forces after cracking. Australian Standards AS5100-2017 and AS3600-2018 are the only available design
Jun 13, 2023
-
Designing and Constructing the Advance Tunnel for the Scarborough Subway Extension - RETC2023
By Jorge Ferrero, Andreas Raedle, Uhland Konrad, Michael Dutton, Keivan Pak Iman, Walter Trisi
Strabag, in partnership with Arup, is constructing the Advance Tunnel for the Scarborough Subway Extension (ATSSE); a project by Metrolinx and Infrastructure Ontario (Sponsors). The 10.7 m internal di
Jun 13, 2023
-
Qualifications and Design of Waterproofing Systems for Underground Structures - RETC2023
By Enrico Pavese, Tim Kearney, Stefan Lemke
Watertightness is of central importance in hydraulic and underground structures but has always been associated with a risk, as demonstrated by the very high impact that water inflows have on the damag
Jun 13, 2023
-
Major Rehabilitation of the Montreal 55 Years Old Lafontaine Immersed Tube Highway Tunnel—Design Considerations - RETC2023
By Laurent Rus, Bakar Amara, Jean Habimana
The La Fontaine Tunnel in Montreal, Quebec is currently undergoing major structural rehabilitation work and systems upgrade work to comply with current codes, standards and best practices in fire life
Jun 13, 2023
-
Ashbridges Bay Treatment Plant Outfall TBM Risk Mitigation— Prescriptiveness and Verification of TBM Fabrication - RETC2023
By Dan Ifrim, Andre Solecki
Tunneling could be a major challenge to tunneling contractors as tunneling operations can be seriously affected by the Tunnel Boring Machine (TBM) performance. Specifying the appropriate TBM methodolo
Jun 13, 2023
-
Hard Rock TBMs—The Experience of Brenner Basis Tunnel, Construction Lot Mules 2-3, for the Evaluation of Risk Prediction Tools - RETC2023
By A. Mei, F. Amadini, F. Cernera, D. Baliani, A. Flor, M. La Morgia, F. Sassi
The risk of TBM jamming because of squeezing rock mass or excessive caving (instability of the cavity) conditions is always a focal point while boring long and deep tunnels with shielded TBMs. Mechani
Jun 13, 2023
-
Bad Bergzabern Bypass Tunnel—NATM Tunneling Through Vineyards - RETC2023
By Ralf Plinninger, Pafos Busch, Richard Gradnik
This paper presents the details of the Bad Bergzabern tunnel project. This tunnel is the main part of the B427 federal road bypass, intended to improve the regional traffic infrastructure and to reduc
Jun 13, 2023
-
The Woodsmith Project—Construction of the Access Shaft at Lockwood Beck Using Innovative Blind Boring Technique - RETC2023
By Cameron Dunn, Callum Fryer, Carmen Hu, Craig Sewell, Peter Stakne, Andrew Raine
The Woodsmith Project is located in north-eastern England within the North York Moors National Park. The strata contains the world’s largest known high-grade Polyhalite resource of around 2.66 billion
Jun 13, 2023