Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Sensors and Systems for the Measurement of Tunnel Movements During and After Construction
By W Ward, J Clegg, R Barnes, T Zhong
This paper provides an overview of methods for measuring tunnel deflection and construction’s effects on the surrounding environment during and post construction. It will also review illustrative case
Sep 17, 2014
-
Pacific Highway Upgrade from Tintenbar to Ewingsdale (T2E), St Helena Tunnel
By A M. Mueller
St Helena tunnel is the centrepiece of the Pacific Highway upgrade from Tintenbar to Ewingsdale, abbreviated and commonly known as T2E. At the deepest point the twin tunnels run 45 m below the ridge l
Sep 17, 2014
-
Characterisation of In Situ Stresses for Tunnel Lining Design in the Sydney?Basin
By A L. de Ambrosis, S J. Clarke
In the non-codified realm of tunnel design there are issues which are sure-fire instigators of controversy. This paper presents a discussion regarding one particular issue which in the authors’ experi
Sep 17, 2014
-
Tunnel Boring Machine Usage Speeds up Development at Stillwater Mine
By D Willis, A Shanahan, C Jacobs, T Luxner
The application of tunnel boring machines (TBM) for reef mining is a unique practice with benefits over current mining methods given the right geology and geometry of the orebody. The Stillwater Minin
Sep 17, 2014
-
Integrated Photogrammetry and Discrete Fracture Network Modelling for Improved Rock Mass Characterisation and Engineering Design
By S F. Rogers, P W. Booth
Digital photogrammetry is revolutionising the task of geotechnical mapping of jointed rock masses and has greatly increased in popularity and sophistication in recent years. Modern commercially availa
Sep 17, 2014
-
The Use of Sprayable Waterproofing Membranes in Underground Structures – Concept, Design Options, Benefits and Limitations
By W Mahoney, F Clement, E Saraiva
Prefabricated waterproofing sheet membranes are extremely complicated to install in underground sections with complex geometries and, despite being already subjected to quality tests in the factory, t
Sep 17, 2014
-
Earth Pressure Balanced Tunnelling in a Dense Urban Environment, C917A
By G Jones
The Singapore Land Transport Authority (LTA) has been procuring the expansion of their underground mass rapid transit rail network at a prodigious rate since the first line opened in 1987. Four lines
Sep 17, 2014
-
Behaviour-based Safety with a Foreign-based Workforce
By R Brown
The Singapore Land Transport Authority Contract C917A is for the design, construction and completion of all outstanding works under the original Contract 917, including taking over the design and cons
Sep 17, 2014
-
Use of Anchored Gaskets in Segmented Bored Tunnels
By A Roseman, T Gruber
Traditional methods for installing gaskets for segmented bored tunnels have relied upon different bonding procedures with adhesives that carry a series of disadvantages to segment producers. Fixation
Sep 17, 2014
-
Live Track Railroad Tunnel Repair and Clearance Improvement in the United States
By J Schrank
Double-stack trains in the United States date back to the early 1980s, starting about the time deregulation of the rail industry occurred. Freight rail became increasingly more competitive to trucking
Sep 17, 2014
-
Blasting Vibration Assessment and Innovative Blasting Methods in High-density Urban Environments
By J W. Muir, N Bedford
Hong Kong is one of the most rapidly developing cities in the world. With constant population growth and limited opportunities for space, the development of a fast and effective underground public tra
Sep 17, 2014
-
How the Global Experience and Reach of Tunnelling’s True Multinationals Helped Solve a Road Tunnel Fit-out Challenge
By S Strong, L I. Sanz Vivanco, T Brown
One of the most significant technical and practical challenges facing the tunnel construction team on the Legacy Way road tunnel project in Brisbane, Australia was how to erect the prestressed precast
Sep 17, 2014
-
Protection of ?Tunnels in their Future Environment
By A L. Bennett
It is well understood that designers and constructors must protect the existing surroundings of tunnel construction, particularly in the selection of excavation methods, ground support and waterproofi
Sep 17, 2014
-
Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, Malaysia
By B Chapman, B Gaida, L Drowley
The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw
Sep 17, 2014
-
SIL904 Hong Kong – Drill and Blast Tunnels, Station Blasting Innovations (Double- and Triple-deck Blasting) and Lining Solutions
By W Curlewis, D Hake, Z Cuthbert
The South Island Line (East) will be a medium-capacity railway covering approximately 7 km from Admiralty Station to South Horizons Station on the south side of Aberdeen Harbour in Hong Kong, with int
Sep 17, 2014
-
An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures
By L Cain, C Every, S Mirlatifi, J Ashley
This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor
Sep 17, 2014
-
Scenic Railway Tunnel Upgrade in the Blue Mountains, New South Wales – An Approach to Design and Construction
By A Hughes, S G. Rosin
This paper presents the design and construction approach adopted for the widening and stabilisation of the existing decline tunnel forming part of the Scenic Railway Upgrade project at Katoomba in the
Sep 17, 2014
-
Temporary Support Design for the Largest Road Caverns Ever Built in Australia – The Lutwyche Caverns
By N McKenzie, E Taylor, S V. L Barrett, H Lagger, A Purwodihardjo
This paper discusses the temporary support design methodology for the largest road caverns ever built in Australia—the Lutwyche Caverns—part of the Airport Link project in Brisbane, Australia. The Lut
Sep 17, 2014
-
Northparkes Mines – Flotation and Planning for the Future
By G Harbort, D Clarke, D Morgan, C Sola
Northparkes Mines commenced production in 1994 and the mine has significant reserves to allow operation into the future. There are a number of potential future concentrator feed sources with variable
Sep 1, 2014
-
Synthetic aperture sonar as a tool for rapid high resolution deposit estimation
By Rolf Birger Pedersen, Alden Ross Denny
"Synthetic Aperature Sonar (SAS) is a powerful tool for ultra-high resolution marine survey. The Kongsberg HiSAS system deployed on the HUGIN AUV has a rangeindependent resolution of 3x3 cm for sonar
Sep 1, 2014