  • AUSIMM
    Demonstrating Efficiency Gains from Installing Truck Turntables at Crushers

    By P A. Grossman, J H. Rubinstein, M Brazil

    The installation of truck turntables at above-ground crushers has the potential to yield gains in efficiency and productivity by eliminating the need for the trucks to turn around and reverse up to th

    Nov 24, 2014

  • AUSIMM
    Multivariate Block Simulations of a Lateritic-type Nickel Deposit and Post-processing of a Representative Subset

    By J Deraisme, P Epinoux, O Bertoli

    "Société le Nickel exploits the Dôme lateritic nickel orebody at its Tiébaghi operations in New Caledonia. The site geology has an obvious bearing on recovery and metallurgical performance, with contr

    Nov 24, 2014

  • AUSIMM
    Open Pit Strategic Mine Planning with Automatic Phase Generation

    By M Recabarren, A Echeverria, J Ronda, J I. Guzman, R Dodds, G Juarez, E Vila-Echague

    A strategic mine plan is a fundamental part of any mining operation. It must provide a realistic and operative extraction and processing schedule, and yield the highest value for the business. For ope

    Nov 24, 2014

  • AUSIMM
    Is Truck Queuing Productive?

    By P Malkin, S Thomas, P M. Stone, D Kostyuk

    In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource

    Nov 24, 2014

  • AUSIMM
    An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut Project

    By D J. Thobaven

    Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu

    Nov 24, 2014

  • AUSIMM
    Simulating Extraction Shapes to Understand Financial Risk Using High Performance Computing

    By E Lima, D Gregory, C Faria, A Lapworth

    Open pit mine enterprises are complex systems that depend on multiple parameters such as mineral grade distribution, geotechnical characteristics, economic conditions and engineering requirements, all

    Nov 24, 2014

  • AUSIMM
    Capital Expenditure Modelling for Strategic Mine Scheduling

    By L Blackwell

    Strategic mine scheduling is an industry best practice for increasing the long-term value of mining operations and supply chains. The application of optimisation technology such as mixed integer linea

    Nov 24, 2014

  • AUSIMM
    Cost Management Optimisation

    By B King

    Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro

    Nov 24, 2014

  • AUSIMM
    Simulation Optimisation of Mine Operational Plans

    By H Askari-Nasab, E Torkamani, M M. Badiozamani, S P. Upadhyay, M Tabesh

    "Decision-making in mining is a challenging task. Optimal decisions regarding shovel and truck allocations, aligned with the optimal short-term production schedules, are crucial in keeping the operati

    Nov 24, 2014

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • AUSIMM
    Predicting Mill Ore Feed Variability Using Integrated Geotechnical/Geometallurgical Models

    By M Astorga, J Jackson, J Gaunt

    The Ban Houayxai mine (BHX) is a relatively low-grade, low-cost, open pit gold-silver deposit in Laos operated by Phu Bia Mining, a subsidiary of PanAust. The ore production rate at BHX is 4.5 Mt/a, w

    Nov 24, 2014

  • AUSIMM
    Analysis of Geotechnical and Support Parameters on Coalmine Entry Stability Using the Strength Reduction Method

    By G S. Esterhuizen, M M. Murphy, T S. Bajpayee

    The strength reduction method (SRM) has been implemented in the FLAC3D finite difference software and applied to coalmine entry support evaluations. The FLAC3D numerical models have been calibrated ag

    Nov 5, 2014

  • AUSIMM
    A Non-destructive Testing Method for Measuring Bolt Condition

    By B Jones, M Chappell

    Installing ground support correctly is not an easy task, whether lack of operator training, poor ground conditions or underperforming equipment. Confirming the quality of installation can help with pl

    Nov 5, 2014

  • AUSIMM
    Geotechnical Models and Data Confidence in Mining Geotechnical Design

    By M J. Dunn

    The geotechnical model is the cornerstone of any mining geotechnical design and as such the confidence level and reliability of the geotechnical model is paramount. The geotechnical model confidence l

    Nov 5, 2014

  • AUSIMM
    Designing Interferometric Synthetic Aperture Radar Surveys for Mine Monitoring with Accuracy Assessment

    By R Ahola, M D. Henschel, M A. McParland

    With the introduction in recent years of third-generation interferometric synthetic aperture radar (InSAR) techniques, monitoring of mine slopes, benches and surrounding areas has benefitted from incr

    Nov 5, 2014

  • AUSIMM
    Application of Design by Measurement for Support and Pillar Design in Mechanised Room and Pillar Coal Mining in India

    By I D. Gregson, A Gandhe, A S. Garcia, K M. MacAndrew

    "Falls of ground still cause around one-third of all underground mining fatalities. The recent introduction of mechanised room and pillar working into Indian coalmines is an example of the application

    Nov 5, 2014

  • AUSIMM
    Rock Mass Characterisation and Analysis for Excavation Design – A Discrete Fracture Network Approach

    By F M. Weir, M Fowler

    The design of excavations in rock must, implicitly or explicitly take into consideration the influence of small- and large-scale geological structures. For most sites the complexity of a fractured roc

    Nov 5, 2014

  • AUSIMM
    Comparison of Field Estimated Strengths

    By A Duran

    When dealing with rocks in the geotechnical profession, a common activity involves providing an estimate of the intact strength. The tactile approach and descriptions of strength that apply to soils i

    Nov 5, 2014

  • AUSIMM
    Coalmine Pillar Design and Performance during Mechanised Pillar Extraction in India

    By I D. Gregson, A S. Garcia, K M. MacAndrew

    The design work undertaken by Rock Mechanics Technology (now part of Golder Associates (Golder)) has played a major part in successfully establishing mechanised room and pillar working in Indian coalm

    Nov 5, 2014

  • AUSIMM
    Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, Australia

    By T J. Sullivan, H Pinkster, G Swarbrick

    From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o

    Nov 5, 2014