Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Demonstrating Efficiency Gains from Installing Truck Turntables at Crushers
By P A. Grossman, J H. Rubinstein, M Brazil
The installation of truck turntables at above-ground crushers has the potential to yield gains in efficiency and productivity by eliminating the need for the trucks to turn around and reverse up to th
Nov 24, 2014
-
Multivariate Block Simulations of a Lateritic-type Nickel Deposit and Post-processing of a Representative Subset
By J Deraisme, P Epinoux, O Bertoli
"Société le Nickel exploits the Dôme lateritic nickel orebody at its Tiébaghi operations in New Caledonia. The site geology has an obvious bearing on recovery and metallurgical performance, with contr
Nov 24, 2014
-
Open Pit Strategic Mine Planning with Automatic Phase Generation
By M Recabarren, A Echeverria, J Ronda, J I. Guzman, R Dodds, G Juarez, E Vila-Echague
A strategic mine plan is a fundamental part of any mining operation. It must provide a realistic and operative extraction and processing schedule, and yield the highest value for the business. For ope
Nov 24, 2014
-
Is Truck Queuing Productive?
By P Malkin, S Thomas, P M. Stone, D Kostyuk
In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource
Nov 24, 2014
-
An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut Project
By D J. Thobaven
Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu
Nov 24, 2014
-
Simulating Extraction Shapes to Understand Financial Risk Using High Performance Computing
By E Lima, D Gregory, C Faria, A Lapworth
Open pit mine enterprises are complex systems that depend on multiple parameters such as mineral grade distribution, geotechnical characteristics, economic conditions and engineering requirements, all
Nov 24, 2014
-
Capital Expenditure Modelling for Strategic Mine Scheduling
By L Blackwell
Strategic mine scheduling is an industry best practice for increasing the long-term value of mining operations and supply chains. The application of optimisation technology such as mixed integer linea
Nov 24, 2014
-
Cost Management Optimisation
By B King
Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro
Nov 24, 2014
-
Simulation Optimisation of Mine Operational Plans
By H Askari-Nasab, E Torkamani, M M. Badiozamani, S P. Upadhyay, M Tabesh
"Decision-making in mining is a challenging task. Optimal decisions regarding shovel and truck allocations, aligned with the optimal short-term production schedules, are crucial in keeping the operati
Nov 24, 2014
-
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
By Y Li, S Ramazan, E Topal
A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t
Nov 24, 2014
-
Predicting Mill Ore Feed Variability Using Integrated Geotechnical/Geometallurgical Models
By M Astorga, J Jackson, J Gaunt
The Ban Houayxai mine (BHX) is a relatively low-grade, low-cost, open pit gold-silver deposit in Laos operated by Phu Bia Mining, a subsidiary of PanAust. The ore production rate at BHX is 4.5 Mt/a, w
Nov 24, 2014
-
Analysis of Geotechnical and Support Parameters on Coalmine Entry Stability Using the Strength Reduction Method
By G S. Esterhuizen, M M. Murphy, T S. Bajpayee
The strength reduction method (SRM) has been implemented in the FLAC3D finite difference software and applied to coalmine entry support evaluations. The FLAC3D numerical models have been calibrated ag
Nov 5, 2014
-
A Non-destructive Testing Method for Measuring Bolt Condition
By B Jones, M Chappell
Installing ground support correctly is not an easy task, whether lack of operator training, poor ground conditions or underperforming equipment. Confirming the quality of installation can help with pl
Nov 5, 2014
-
Geotechnical Models and Data Confidence in Mining Geotechnical Design
By M J. Dunn
The geotechnical model is the cornerstone of any mining geotechnical design and as such the confidence level and reliability of the geotechnical model is paramount. The geotechnical model confidence l
Nov 5, 2014
-
Designing Interferometric Synthetic Aperture Radar Surveys for Mine Monitoring with Accuracy Assessment
By R Ahola, M D. Henschel, M A. McParland
With the introduction in recent years of third-generation interferometric synthetic aperture radar (InSAR) techniques, monitoring of mine slopes, benches and surrounding areas has benefitted from incr
Nov 5, 2014
-
Application of Design by Measurement for Support and Pillar Design in Mechanised Room and Pillar Coal Mining in India
By I D. Gregson, A Gandhe, A S. Garcia, K M. MacAndrew
"Falls of ground still cause around one-third of all underground mining fatalities. The recent introduction of mechanised room and pillar working into Indian coalmines is an example of the application
Nov 5, 2014
-
Rock Mass Characterisation and Analysis for Excavation Design – A Discrete Fracture Network Approach
By F M. Weir, M Fowler
The design of excavations in rock must, implicitly or explicitly take into consideration the influence of small- and large-scale geological structures. For most sites the complexity of a fractured roc
Nov 5, 2014
-
Comparison of Field Estimated Strengths
By A Duran
When dealing with rocks in the geotechnical profession, a common activity involves providing an estimate of the intact strength. The tactile approach and descriptions of strength that apply to soils i
Nov 5, 2014
-
Coalmine Pillar Design and Performance during Mechanised Pillar Extraction in India
By I D. Gregson, A S. Garcia, K M. MacAndrew
The design work undertaken by Rock Mechanics Technology (now part of Golder Associates (Golder)) has played a major part in successfully establishing mechanised room and pillar working in Indian coalm
Nov 5, 2014
-
Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, Australia
By T J. Sullivan, H Pinkster, G Swarbrick
From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o
Nov 5, 2014