3D Numerical Analyses of Temperature Field for Construction of Connecting Passage in Metro Using Artificial Freezing Method
By Jian-bin Xie, Lin-fang Shen, Zhi-liang Wang
"In order to research temperature field for construction of connecting passage in Metro using artificial freezing method, the finite difference software FLAC3D is employed to numerically simulate cons
Jan 1, 2015
-
Design Considerations for Main Surface Fan Installation
By A. D. S. Gillies, A. Haghighat
"A study has been undertaken at the Missouri University of Science and Technology (MS&T) limestone Experimental Mine to determine new fans set up and wiring options.to install additional mine ventilat
Jan 1, 2015
-
Increasing Availability through Advanced Gearless Drive Technology (bdb34c0f-eece-4038-82e2-fac055da3c4a)
By C. Dirscherl
"Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy
Jan 1, 2015
-
Design Methodology for Large Underground Powerplants
By R. Plassart, F. Laigle
"As a powerhouse, a transformer or a valve chamber, large underground caverns are a major element of hydropower plant. On the contrary to galleries and shafts which are linear and long underground str
Jan 1, 2015
-
A Positive Pressure Based Dry Gas Handling System for Energy Recovery from Suppressed Combustion Exhaust
By A. McGrath, M. Trovant, M. Haque
Minimizing energy consumption is a priority for many industrial facilities. Metallurgical and gasification processes produce dirty syngas (CO and H2), which offers the potential for energy recovery. H
Jan 1, 2015
-
Obtaining Robust Estimates of Rock Strength for Rock Engineering Design
By J. P. Harrison, N. Bozorgzadeh, M. Dolowy-Busch
"It is common in rock engineering practice to characterize the triaxial strength of intact rock by using only data samples of small size. Practical guidelines such as ASTM support such sample sizes. I
Jan 1, 2015
-
Test Work and Geochemical Modeling for Copper in Situ Leaching
By L. K. Sinclair
In situ leaching of copper has the potential to deliver low-cost recovery for soluble copper deposits of sufficient permeability. In order to provide key inputs for modeling of the in situ leaching pr
Jan 1, 2015
-
Application of Systemic Flow-Based Principles in Mining
By J. O. Claassen
"SynopsisMining value chains are dynamic systems and should be managed according to systemic flow-based principles. This includes a detailed focus on the impact of variable geological conditions on ma
Jan 1, 2015
-
Looking to the Future
By Chris Twigge-Molecey
Demand for metals will continue to grow as global population numbers and prosperity levels steadily increase. Consequently, there will continue to be a need to design and construct new metallurgical p
Jan 1, 2015
-
The Study of Optimum Tailing Storing Conditions for Surface Paste Disposal Method
By S. Tuylu, D. Adiguzel, U. G. Akkaya, A. Bascetin
"One of the main problems for storing of the tailings is acidity occurrence due to several factors such as existence of sulfuric minerals and also the pollution in seepage waters by mobilization of me
Jan 1, 2015
-
Effect of Yttrium Addition on Texture Evolution during Pre and Post-Deformation Annealing in an Extruded Zm31 Alloy
By D. F. Zhang, X. Q. Jiang, N. Tahreen, D. L. Chen, F. S. Pan, D. Y. Li
Alloying with rare-earth elements has been proven to be an important tool for magnesium to achieve superior properties via texture randomization. The role of yttrium in texture weakening and the link
Jan 1, 2015
-
Mixing Proportion Design and Construction Management for Application of Cement Deep Mixing Method to Construction Project on Controlled Final Landfill Site in Japan
By Yoshinori Kurumada, Masaya Watanabe, Kenji Sasa
"The Port of Yokohama is strengthening its international competitiveness as a strategic container port in order to respond appropriately to global exchange and shipping demands. Thus, the Minami Honmo
Jan 1, 2015
-
Soil Improvement in Marina Coastal Expressway Project (C485) with Cement Deep Mixing (CDM) Method
By Yoshinori Kurumada, Tatsuo Nagatsu, Keiji Uchida
"Cement deep mixing method has been utilized in the process of construction of an underwater tunnel in Singapore. The soil was improved by this method to prevent undesirable heaving of the soil below
Jan 1, 2015
-
Project Implementation
By Randy McMeekin, Chris Twigge-Molecey, J. Peter Blake
The project implementation phase, FEL4, is generally a complex undertaking. The project has been approved for construction and the capital has been allocated. At this point the project team comes unde
Jan 1, 2015
-
Sealed Spherical Roller Bearings Used on Conveyors Improve Production
By J. Oliver, J. Cleason
"With maintenance costs rising and an increasing demand for higher production, the use of sealed spherical roller bearings can reduce maintenance costs while providing increased production uptime. The
Jan 1, 2015
-
Deformation Characteristic of a Deep-Seated Rockslide Interacting with a Reservoir
By C. Zangerl, W. Fellin, M. Holzmann, B. Hofer, S. Perzlmaier
"Four deep-seated rockslide systems were investigated and are under surveillance by TIWAG (Tyrolean hydro-electric Company) since the mid-1960s after impoundment of Gepatsch reservoir began. These roc
Jan 1, 2015
-
Application of Deep Soil Mixing Walls in the Warren Avenue Grade Separation Project, Fremont, CA
By D. S. Yang, Y. D. Wang, G. Watanabe, A. P. Notaro
"Deep soil mixing (DSM) walls reinforced with steel soldier piles were installed for excavation support and groundwater control for the construction of a grade separation structure at the intersection
Jan 1, 2015
-
Turbulent Models for Pollutant Transport in Open Pit Mines under Stable Boundary Layer
By R. V. Ramani, K. V. Raj
"The air flow problems in open pit mines are complex. Computational fluid dynamics (CFD) models provide a detailed knowledge of the airflow pattern and velocity distribution, temperature, and pollutan
Jan 1, 2015
-
Dynamic Response of Buried Oil Pipeline Caused by Tunneling Blasting
By Zheng Shuangying
The vibration effect of the buried oil pipeline caused by tunneling blasting affects the pipeline safe transportation, tunnel construction schedule and its construction cost. The dynamic response char
Jan 1, 2015
-
Classification of Roof Strata and Calculation of Powered Support Loads in Shallow Coal Seams of China
By G. Song
"SynopsisAccording to the overlying rock strength and thickness of 10 shallow coal seams in China, the strata are classified into four types: weak and laminated strata (hereinafter referred to as WL),