Search Documents

Sort by

  • DFI
    Fraser Heights Bridge – Comparison between PDA Tests and Pile Capacity Estimation Methods

    By Ali Azizian, Brian Hall

    "Driven piles were selected to support the Fraser Heights Bridge bents. Piles were a key component of the top-down construction approach, which was adopted for minimizing potential impacts on an envir

    Jan 1, 2016

  • DFI
    Driven Pile Foundation Design and Construction Issues for a Highrise Building in Manhattan

    By Satyajit Vaidya, Rudolph Frizzi, Sandy Larimer

    "This paper presents a case history in design and construction of a deep foundation system that included high-capacity open-ended driven piles constructed to support a high-rise building in Manhattan,

    Jan 1, 2016

  • DFI
    Full Scale Uplift Load Testing of Micropiles in Cohessionless Soil

    By M. Hesham El Naggar, Maged A. Abdlrahem

    "Hollow bar micropiles have constructional advantages such as: fast and low-noise and low vibration installation process and small installation equipment, which allow access to tight places. In additi

    Jan 1, 2016

  • DFI
    High Capacity Drilled Piles in Brooklyn

    By Ahmed Elmekati, Frederick C. Rhyner, Steven R. Lowe

    "The current phase of the Pacific Park development (formerly, Atlantic Yards) in Brooklyn involves constructing buildings on a platform over an existing LIRR rail yard. To preserve the maximum amount

    Jan 1, 2016

  • DFI
    High Capacity Grouted Helical Piles

    By Mohamed A. Mansour, Ahmed M. Soliman, M. H. El-Naggar

    "Grouted helical piles allow significant increase in pile capacity with low additional cost over that of conventional helical piles. They can be particularly advantageous in sites where installation d

    Jan 1, 2016

  • DFI
    Load Tests on Drilled Shafts at Goethals Bridge Replacement

    By John P. Turner, Steven S. Dapp, Dan A. Brown

    "The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY is supported on over 200 drilled shaft foundations ranging in diameter from 4.5 ft

    Jan 1, 2016

  • CIM
    The Extractive Metallurgy of Agromined Nickel

    By William Hawker, James Vaughan, Jeff Chen, Antony van der Ent

    "Nickel agromining utilizes hyperaccumulator plants (“metal crops”) to extract nickel from low-grade soils, a process that yields high-grade nickel bio-ore. This feedstock is further processed into a

    Jan 1, 2016

  • SME
    The Brenner Base Tunnel

    By Michael Rehbock-Sander, Romed Insam

    "INTRODUCTIONThe idea of building a summit tunnel under the Brenner occurred to the Italian engineer Giovanni Qualizza as far back as 1847. But it was to be another 160 years to pass before a base tun

    Jan 1, 2016

  • DFI
    Use of Enhanced Pre-Mixed Self-Hardening Grout for an Emergency Cut-Off Wall Intervention in West Africa

    By Maurizio Siepi, Bruno Vingiani, Claudio Asioli

    "The article describes an emergency rehabilitation intervention executed at Buyo Dam, in Ivory Coast, to intercept a significant water seepage occurring through the foundation of this zoned earthfill

    Jan 1, 2016

  • DFI
    Value-Engineering of H-Pile Foundations in Karstic Geology

    By Rachael M. Fischer, Daniel J. Woeste, Terence P. Holman

    "A new 50 MW biomass renewable energy power plant was planned for construction in southwestern Georgia. The original foundation design consisted of very conservatively designed H-pile groups with vert

    Jan 1, 2016

  • SME
    Unexpected Post-Excavation Damage to a 28"-Thick Segment Lining - Failure Mechanism and Rehabilitation Measures

    By Jens Classen, Martino Gatti

    "GENERAL PROJECT DATAThe Sparvo Tunnel is part of the “Variante di Valico” project, a new 65km (40mi) highway link between Bologna and Florence, designed to renew the existing A1 route which connects

    Jan 1, 2016

  • DFI
    Unified Specifications for Soil-Mixed Seepage Cutoff Walls

    By Wayne S. Smith, Erik James, Jose R. Gomez

    "Soil mixed seepage cutoff walls are increasingly being used in levee and dam modification projects nationwide. An important aspect of their overall quality depends greatly on the language included in

    Jan 1, 2016

  • DFI
    Washington Avenue Tunnel Project: Fortifying Aging Underground Infrastructure

    By Andrew R. Klaetsch, Peter W. Deming

    "The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th

    Jan 1, 2016

  • DFI
    Wadi Dayqah Dam Curtain

    By Frank Haehnig, Harald Krenn, Harm-Christoph Claassen

    "The Wadi Dayqah Dam Water Supply Scheme represents one of the most important projects implemented by the Sultanate of Oman to ensure sustainability of water resources. The principal components of the

    Jan 1, 2016

  • DFI
    UB Digs Deep and Builds Over Adjacent Subway for New Medical Building Hub

    By Lisa R. Papandrea, David Chen, Walter E. Kaeck

    "Construction of the University at Buffalo’s new School of Medicine and Biomedical Sciences (UB-SMBS) required excavation in variable ground to a depth of more than 40 ft adjacent to the NFTA Metro su

    Jan 1, 2016

  • DFI
    Risk Assessment and Quality Control on Grouted Waterretaining Layers by Observational Engineering

    By Bartho J. Admiraal

    "As part of the Schiphol-Amsterdam-Almere project, the largest aqueduct in Europe is being built in order for the A1 motorway to cross the Vecht River. The A1 consists of 12 lanes and the total width

    Jan 1, 2016

  • DFI
    Rock Excavation and Underpinning below a 19-Story Building

    By Kevin P. Gleckler, Steven C. Highfill

    "Escalators to access platforms for the Second Avenue Subway Station at 72nd Street in Manhattan are to be installed in the basement of an existing 19-Story residential building. The escalators, which

    Jan 1, 2016

  • DFI
    Rock Socketed Drilled Shafts for the Goethals Bridge Replacement

    By John P. Turner, Steven S. Dapp, Dan A. Brown

    "The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY consists of a dual-span 1,982.5-ft long cable-stayed bridge with approach spans of

    Jan 1, 2016

  • DFI
    Seepage Barrier at Bolivar Dam

    By Mohamed Elgouhary, Carol L. Tasillo, Daniel Koziol

    "The Bolivar Dam, located near the Village of Bolivar, Ohio is one of a system of dams designed to provide flood control and water conservation in the Muskingum Watershed. The Bolivar Dam is a “dry da

    Jan 1, 2016

  • DFI
    Seepage Barrier Mix Design Development, Installation, and Evaluation

    By George W. Little, John Councilman

    "The selection, evaluation, and modification of contractor mix designs for self-hardening seepage barriers, completed by the slurry trench excavation method, can be one of the most critical and challe

    Jan 1, 2016