  • ISEE
    Blasting for Installation of one of the World’s Largest In-Pit Crushers at an Open Cut Copper Mine

    By S. Mansfield, A. Sharma

    At a large open cut copper mine, in pit crushing and conveying is used to shorten haul routes and minimise stockpiling of ore. This strategy decreases capital expenditure by reducing the number of hau

    Jan 1, 2024

  • ISEE
    Close in Blasting in Urban Areas, Changing Regulations and a Case Study

    By C. Breeds, K. Jeremiah, E. Jennings

    Washington State has a well developed set of blasting regulations which have been promulgated by the Department of Labor using extensive stakeholder input, not only from citizens but also from manufac

    Jan 1, 2024

  • ISEE
    Application of New Technologies for PSD Data Acquisition

    By J. Pizarro

    Any organization that subjects its activities to a continuous improvement methodology, aiming to optimize their processes and services, must be able to adequately measure the results of the implemente

    Jan 1, 2024

  • ISEE
    Blast design optimization system to improve mining downstream operations by adapting the explosive energy to the rock mass based on drill monitoring data

    By P. Couceiro, J. Navarro

    A new methodology to perform selective blast designs by adapting the explosive energy, hole by hole (or in the hole), to the rock properties as a combination of their strength properties through the X

    Jan 1, 2024

  • ISEE
    Application, monitoring, and control of vibrations induced by underground rock blasting using a near-field methodology

    By A. Gontijo, A. Matos, P. Lincoln, L. Fonsecail

    This paper investigates how to manage and model the vibrations caused by rock blasting in a Brazilian underground mine. Considering the frequent detonations and the previous lack of effective vibratio

    Jan 1, 2024

  • ISEE
    HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground

    By K. Dufresne

    Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron

    Jan 1, 2024

  • ISEE
    Vibration Control In Open Cut Mine Through Pre-Loading Applying Wireless Detonators

    By C. Feliciano, M. Cavalcante

    A large iron ore open pit mine in Brazil operates with reduced blast sizes, due to the imminence of red alerts in the rainy season and the proximity of plant and dam structures that demand control of

    Jan 1, 2024

  • ISEE
    Blast fragmentation model to increase mill productivity and optimize resources based on the Mine to Mill Methodology

    By A. Ribeiro

    The effective utilization of resources and process optimization play a crucial role in the sustaining and growth of overall businesses. This principle holds true in the mining sector, where particular

    Jan 1, 2024

  • ISEE
    Close-in Pipeline Trench Blasting – Why PipeBlast Does Not Work

    By N. Skopak, C. Aimone-Martin, J. Redyke, B. O. Meins

    PipeBlast is a spreadsheet-based calculator based on research conducted by Southwest Research Institute (SwRI), used by the pipeline industry to determine if proposed blasting planned near existing pi

    Jan 1, 2024

  • ISEE
    Study of Ultrafines Control in Blasting

    By A. Andrades, E. Arias, Y. Pizarro, J. Alarcón

    Division Ministro Hales - Codelco (DMH) is located at 2600 meters above sea level, 10 km north of the city of Calama, Antofagasta region, Chile. In operation since 2010, it corresponds to a porphyry

    Jan 1, 2024

  • ISEE
    Comparison of Compliance Measures for Blasting near an Industrial Structure Vibration Monitoring Standards Connected to the use of Explosives in Different Countries, Part III

    By C. Aimone-Martin, C. Dowding, M. Jern, J. Gjødvad

    This article compares percentages of compliance for six national standards to demonstrate how these standards vary on-site in a real project. This, to the best of the authors' knowledge, has not been

    Jan 1, 2024

  • ISEE
    Use of a Scaled Concrete Model to Determine the Origins of Air Overpressure

    By N. Skopak, W. Birch, A. Douglas, C. Johnson

    Determining the origins of air overpressure has been a long-debated topic within the explosives engineering community. Historically, it has been accepted that the initial face movement gave rise to ai

    Jan 1, 2024

  • ISEE
    Slope stability’s control for designing and execution of massive open pit blasting

    By P. Ravanal, J. Blazquez, F. Ortega, P. Couceiro, J. Navarro

    Massive blasting technique is an interesting alternative to optimize mining’s performance by enhancing digging rates and overall operation’s activities, especially when a reduced operational bench wid

    Jan 1, 2024

  • ISEE
    Dust Control in the Environment Using New Technologies and Blasting Techniques.

    By L. Muñoz, L. Steffen, W. Vilas

    The emission of particulate material is one of the several parameters related to environmental control in mining operations near communities. Blasting is an event that generates and leaves a large amo

    Jan 1, 2024

  • ISEE
    Advanced techniques using microscopy to quickly assess emulsion quality and stability.

    By G. Cavanough, A. Torrance

    Emulsions have been developed for over forty years to become the most common water-resistant explosives used in the mining industry. An emulsion is a common commodity, with many examples in our day to

    Jan 1, 2024

  • ISEE
    Prototype of MEMS-based Accelerometric Network for Continuous Monitoring of Blasting Efficiency and Seismic Velocities

    By M. Szumny, P. Mertuszka, K. Fuławka

    Mining-induced seismicity is one of the adverse side effects of mining with the use of explosives at great depths. Disturbance of the primary stress state by the development of the network of excavati

    Jan 1, 2024

  • ISEE
    A powder factor build-up model to quantify most common influencing factors at the Serra Sul mine

    By L. Chaves

    In rock blasting, due to numerous factors, both controllable and uncontrollable, the execution rarely meets the planning. The powder factor is an important KPI for blasting since it represents the amo

    Jan 1, 2024

  • ISEE
    Quantifying NOx Fume Events in Blasting using Drones: Improving Environmental Performance and Public Perception

    By A. Lindo, M. Held

    The formation of NOx fumes is an undesired occurrence and is dependent on a variety of variables. Methods for detection of such fumes with blast analysis tools are available using color schemes for gr

    Jan 1, 2024

  • ISEE
    Stope performance optimisation through the introduction of new underground bulk explosives technology

    By S. Evans, J. Phillips-White, D. Morton

    The partnership between Orica and MMG at the Dugald River Zinc mine in Australia has led to the first global field trials and deployment of Orica’s Subtek™ 4D™ (hereafter referred to as 4D) Bulk Syste

    Jan 1, 2024

  • ISEE
    Sustainable productivity in the exploitation processes of a mining site adjacent to communities

    By J. Aravena, S. Gajardo, M. Ayala, P. Salinas

    Both, Teck Carmen de Andacollo (Teck CDA) and Orica, work hard in the implementation of new technologies available in the explosives industry and drilling and blasting techniques, with the objective o

    Jan 1, 2024