Search Documents

Sort by

  • AUSIMM
    Applications of Advanced Remote Sensing Systems during a Mine Life

    By B P. Banerjee, S Raval

    In the recent past there have been dramatic advancements in the development of remote sensing platforms (satellite, aircraft and unmanned aerial vehicles – UAVs) as well as sensor systems (multispectr

    Jun 28, 2016

  • AUSIMM
    Reassessing Rehabilitation Objectives and Targets for Mature Mining Operations in Queensland

    By T R. Anderson, A R. Butler

    Haymont (2012) notes that in parts of Australia significant areas of mining disturbance cannot be relinquished. In Queensland it has been estimated that by 2010, just 0.3 per cent 507 ha of mining dis

    Jun 28, 2016

  • AUSIMM
    Waste Rock Pile Construction to Lower Closure and Relinquishment Costs

    By J R. Taylor, J A. Muchan, S M. Pape, B S. Davis

    Acid and metalliferous drainage (AMD) is routinely derived from waste rock, tailings, pit wall rock, underground mine voids, heap leach pads, ore stockpiles, concentrate stockpiles and even slag piles

    Jun 28, 2016

  • AUSIMM
    Global Lessons for a Local Problem – Rehabilitation Bonds and Victoria’s Latrobe Valley Coalmines

    By M L. Cramer, N P. Wines

    "On 9 February 2014, bushfire embers landing on exposed coal in a disused pit at the Hazelwood mine in Victoria’s Latrobe Valley ignited a coal fire that burned for 45 days. The fire was the largest a

    Jun 28, 2016

  • AUSIMM
    Zooming Out – Learning to See Rehabilitation through Stakeholders’ Eyes

    By J L. Merritt

    The mining industry seeks to engage with and respond to stakeholders through open consultation processes during the various phases of a mining project (Department of Industry, Tourism and Resources, 2

    Jun 28, 2016

  • AUSIMM
    Development, Simulation, Economic and Environmental Evaluation of a Coal Processing Flow Sheet

    By J Tien, J Huang, N Haque, M O’Brien

    Coal preparation is an integral part of producing coal for thermal powerplants and metallurgical processing plants. Coal processing plants use various unit processes to separate gangue and ash content

    Jun 28, 2016

  • AUSIMM
    Landscape-scale Assessment of Watercourses in Remote Arid South Australia to Inform Mine Planning to Mine Closure

    By K White, C Ferguson, M Harding

    Understanding watercourses and river processes at a landscape scale is vital for managing risk to mining infrastructure and operations as well as minimising future environmental impacts beyond the lif

    Jun 28, 2016

  • AUSIMM
    Accounting for Vegetation Dynamics in Landform Evolution Modelling

    By G R. Hancock, S Grant, T Whiteside, J B. C Lowry, J Boyden, T J. Coulthard

    Physically-based landform evolution models (LEM) provide a spatial framework to forecast the long-term geomorphic stability of post-mining landscapes. When used to test the relative stability of diffe

    Jun 28, 2016

  • AUSIMM
    Simulating Integrated Hydrology in Mining Catchments from Planning to Closure

    By S Szylkarski, D N. Graham

    In mining, water management is an operational necessity, requiring planning and detailed engineering, as well as risk assessment. Yet, the hydrology of streams and aquifers typically extends well beyo

    Jun 28, 2016

  • AUSIMM
    Water-related Data Requirements for Improved Life Cycle Assessment of Mining, Mineral Processing and Tailings Management

    By G Mudd, N Haque, S A. Northey

    Life cycle assessment (LCA) provides an internationally standardised framework for estimating the environmental impacts associated with products or services (International Organisation for Standardisa

    Jun 28, 2016

  • AUSIMM
    Predicting, Assessing and Managing Sediment Plumes Generated by Sea Floor Mining

    By R Grogan

    Nautilus Minerals (Nautilus) is a sea floor resource exploration and development company focused on developing the Solwara 1 Project, a copper-gold sea floor massive sulfide deposit in the territorial

    Jun 28, 2016

  • AUSIMM
    Social Licence in Real-time – Using Dynamic Methods to Support a New Kind of Community Relationship

    By N Boughen, K Moffat, L Brooks, A Zhang

    In 2015, Ernst and Young (EY) ranked socio-political license to operate (SPLTO) as the fifth greatest challenge to the mining sector (EY, 2015). The EY report asserts that SPLTO will continue to prese

    Jun 28, 2016

  • AUSIMM
    Utilising Mineralised Mining Waste – Contributions to the Circular Economy

    By É Lèbre, G Corder

    The circular economy concept, as defined by the Ellen MacArthur Foundation (2015) and quoted by the recent International Council on Mining and Metals (ICMM) Guide to Responsible Sourcing, calls for sh

    Jun 28, 2016

  • AUSIMM
    Geostatistics and Sample Numbers from an Acid and Metalliferous Drainage Perspective

    By C Linklater, A Garvie, D Kentwell

    Various Australian and international regulatory bodies (Environmental Protection Authority, 2015) require an early assessment of the geochemistry of waste rock. This usually includes estimates of the

    Jun 28, 2016

  • AUSIMM
    Social Licence to Close?

    By J A. Braithwaite

    Social licence to operate is not a new concept for the mining industry, referring to stakeholder approval or acceptance for the activities and impacts of a project, company or industry. It is intangib

    Jun 28, 2016

  • AUSIMM
    Bowen Basin Coalmine Spoil Classification for Improved Mine Rehabilitation Outcomes

    By T Baumgartl, J Burgess, B Emmerton, P D. Erskine

    Large-scale open cut mining in the Bowen Basin has been undertaken for over 40 years. During this period, improved mechanical capability and economics have allowed extraction to greater depths, result

    Jun 28, 2016

  • AUSIMM
    Fire Behaviour in Buffel Grass Dominated Mine Site Rehabilitation in Central Queensland, Australia

    By A Sturgess, P McKenna, P D. Erskine, D Doley, V C. Glenn

    For more than four decades, rehabilitated lands in the Bowen Basin have been planted with buffel grass (Cenchrus Ciliaris), which is often used to provide rapid, stabilising and erosion reducing cover

    Jun 28, 2016

  • AUSIMM
    Emerging Technology for Economic and Ecological Sustainability in the Rehabilitation of Metal Mine Tailings

    By L Huang

    "Successful rehabilitation of tailings landforms of tens to thousands of hectares in size at base metal mines is critical to mining companies’ ‘social licence to operate’. Rehabilitation technology us

    Jun 28, 2016

  • AUSIMM
    A Black Canvas – Planning a Greenfield Coalmine in New South Wales

    By T W. C Stambolie

    Coalmines, like any other mine, generally involve the classic three-staged approach to mining studies; namely concept, pre-feasibility study (PFS) and feasibility studies (Cusworth, 2012). Subsequent

    Jun 28, 2016

  • AUSIMM
    Can Australian Coal Alleviate Energy Poverty in India – a Case Study

    By H von Blottnitz, A C. Keith

    The influence of the life of a mine extends beyond its immediate vicinity both in geographic and temporal terms. Decisions around mine approvals are generally made based on economics, for the mine own

    Jun 28, 2016