Search Documents

Sort by

  • DFI
    Hydraulic Drive Head Performance Curves for Prediction of Helical Pile Capacity (2653dc4c-cfa1-4dd3-965e-5e0ef0346ada)

    By Donald Deardorff

    "Helical piles often rely on the final installation torque for ultimate capacity verification. When helical piles are designed using traditional bearing capacity equations for deep foundations and fie

    Jan 1, 2017

  • DFI
    The Impact Geotechnical Data Management Systems May Have on Risk Allocation for Differing Site Conditions in Construction Contracts

    By Steven M. Henderson, Zachary D. Jones

    The risk of allocation in construction contracts is a primary concern for all parties. For contracts involving subsurface construction the allocation of site condition risk is critical. In the past on

    Jan 1, 2017

  • DFI
    Soil Mixing Treatment of Marginal Soil for Railway Construction and Maintenance

    By Charles M. Wilk

    "Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o

    Jan 1, 2017

  • CIM
    Fe(III)-As(V) Precipitates Obtained from the Fe(II)-As(V)-SO42--H2O System and Their Leaching Stability

    By Pingchao Ke, Zhihong Liu

    Fe(III)-As(V) precipitates were synthesized from the Fe(II)-As(V)-SO42--H2O system at 90°C in initial Fe(II)/As(V) molar ratios of 4.0 and 5.0, respectively. The synthesis were carried out by introduc

    Jan 1, 2017

  • DFI
    Repair Methods for Corroded Steel Piles (0af709a8-9f1e-4f35-81ea-c69c3ee7fb05)

    By C. Vipulanandan, M. Dawood, Dongmei Pan

    "With the aging infrastructure, there is a need to maintain and extend the service life of steel structures in general and steel piles in particular. Steel piles support not only vertical loads but al

    Jan 1, 2017

  • DFI
    Concrete Overbreak Estimation and Analysis Errors in Bored Piles

    By Nuno Cruz

    "The concrete overbreak estimation for bored piles provides the quantification of the shaft’s expansion beyond its theoretical volume. There are stability analysis methods that can be employed before

    Jan 1, 2017

  • SME
    Dragline Extraction of 1.2 Million Tonnes of a 52-Meter Thick Vertically Dipping Coal Seam

    By T. J. Morris

    "From November 2014 through September 2016, Westmoreland’s Coal Valley Mine utilized a Marion 7450 electric walking dragline to extract 1.2 million tonnes of a vertically-dipping, 52-meter wide, fault

    Jan 1, 2017

  • DFI
    Self-Hardening Slurry Wall Installation by Hydromill at the Herbert Hoover Dike – An Innovative Solution (05e83755-4ec2-4ed4-a26c-d1e81c41960c)

    By Mario Mauro, Jeff Taylor, Carlos Morales

    "In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehab

    Jan 1, 2017

  • SAIMM
    In-Pit Crusher Location as a Dynamic Location Problem

    By M. Paricheh, M. Rahmanpour

    "The cost efficiency and high reliability of semi-mobile or combined in-pit crushing-conveying (IPCC) and truck systems, compared to conventional truck-shovel systems alone, make them more attractive

    Jan 1, 2017

  • CIM
    Meeting Today’s Challenge in Nickel Production: Reducing Operating Costs at Nickel Sulphide and Laterite Plants

    By A. E. M. Warner, A. Vahed, P. J. Mackey

    "Since early 2015, the price of nickel has dropped from the region of US$6/pound to current levels of around US$4.60/pound (March 2017), reflecting several market factors, but principally due to lower

    Jan 1, 2017

  • SME-ICGCM
    Changes in Stress and Displacement Caused by Longwall Panel Retreats

    By Ihsan B. Tulu, David F. Gearhart, Gabriel S. Esterhuizen

    "Ground deformation and support response was monitored in a longwall gateroad as part of a research project into gateroad stability under changing loading conditions. In this study, instrumentation wa

    Jan 1, 2017

  • CIM
    Leaching Characteristics of Nickeliferous Pyrrhotite Tailings from the Sudbury, Ontario Area

    By Elizabeth Edwards, Radhakrishnan Mahadevan, Vladimiros G. Papangelakis, Srinath Garg, Kurtis Judd

    Mineralogical characterization of the tailings showed the deportment of Ni to be similar in the Vale and Glencore tailings, with 60% of the total Ni locked in pyrrhotite, and the balance 40% associate

    Jan 1, 2017

  • DFI
    Role of Probabilistic Methods in Sustainable Geotechnical Levee Integrity Analysis

    By Juan M. Pestana-Nascimento, Robert G. Bea, Hamed Hamedifar, Emery M. Roe

    The current State-of-the-Practice is grounded heavily on deterministic characterization and assessment of the performance of civil engineering infrastructure. In particular, flood defense systems, suc

    Jan 1, 2017

  • CIM
    The Future Shape of Mineral Processing

    By M. J. Bunyard, I. Mullany

    "The pressures on mine operators are varied and constantly increasing, declining ore grades, more remote locations and increasing environmental concerns. The challenge facing the mining industry is to

    Jan 1, 2017

  • SME
    Cautious optimism for the future of mining; Resolution Copper eyes next steps

    By William Gleason

    "The times they are a changing, and, for the mining industry, the optimism is high. On Nov. 8, Donald Trump was elected as the 45th president of the United States, and the Republican Party won a major

    Jan 1, 2017

  • CIM
    New Ways to Reduce Carbon-Related Gold Losses in CIL and CIP Processes

    By K. Lillkung, J. Kourunen, M. Latva-Kokko

    "Carbon-in-leach (CIL) and carbon-in-pulp (CIP) processes utilize activated carbon to adsorb solubilized gold for recovery. Due to carbon attrition and non-ideal carbon management, however, some of th

    Jan 1, 2017

  • CIM
    Selecting the Correct Cyanide Destruction Process for Your Operation

    By R. Agius, A. Nacu

    "Adoption of the International Cyanide Management Code, regulatory requirements and community concerns have increased the need to implement suitable cyanide destruction processes at gold operations to

    Jan 1, 2017

  • DFI
    Extra Deep Cut-Off at 250 m Depth - A Case Study

    By Federico Pagliacci

    "Many existing dams are subject to underwater seepage due to subsoil conditions, like deep alluvial deposits or pervious rocks or karst. Remedial works are necessary in order to install new cut-off wa

    Jan 1, 2017

  • SME-ICGCM
    Research Progress on Fully Mechanized Mining Technology of Steeply Dipping Seams

    By Hongwei Wang, Hao Zhang, Panshi Xie, Xicai Gao, Youfu Zeng, Yongping Wu, Juan Dou

    "The reserves and production of steep coal seams account for approximately 15–20% of the total coal reserves in China and 5–10% of the total annual coal production. More than 50% of the coal is high-q

    Jan 1, 2017

  • DFI
    Measured and Modeled Settlements of Power Plant on Piled Raft Foundations (2734870e-dd47-46f3-a815-25575798a774)

    By Alireza Ayoubian, Douglas S. Roy, Gianni O. Chieruzzi

    "A 400 MW, gas-fed power plant on floating piles and piled raft foundations was constructed in the Province of Moskovskaya, Russia in 2008. The subsurface is characterized by fill underlain by loose t

    Jan 1, 2017