Hydraulic Drive Head Performance Curves for Prediction of Helical Pile Capacity (2653dc4c-cfa1-4dd3-965e-5e0ef0346ada)
By Donald Deardorff
"Helical piles often rely on the final installation torque for ultimate capacity verification. When helical piles are designed using traditional bearing capacity equations for deep foundations and fie
Jan 1, 2017
-
The Impact Geotechnical Data Management Systems May Have on Risk Allocation for Differing Site Conditions in Construction Contracts
By Steven M. Henderson, Zachary D. Jones
The risk of allocation in construction contracts is a primary concern for all parties. For contracts involving subsurface construction the allocation of site condition risk is critical. In the past on
Jan 1, 2017
-
Soil Mixing Treatment of Marginal Soil for Railway Construction and Maintenance
By Charles M. Wilk
"Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o
Jan 1, 2017
-
Fe(III)-As(V) Precipitates Obtained from the Fe(II)-As(V)-SO42--H2O System and Their Leaching Stability
By Pingchao Ke, Zhihong Liu
Fe(III)-As(V) precipitates were synthesized from the Fe(II)-As(V)-SO42--H2O system at 90°C in initial Fe(II)/As(V) molar ratios of 4.0 and 5.0, respectively. The synthesis were carried out by introduc
Jan 1, 2017
-
Repair Methods for Corroded Steel Piles (0af709a8-9f1e-4f35-81ea-c69c3ee7fb05)
By C. Vipulanandan, M. Dawood, Dongmei Pan
"With the aging infrastructure, there is a need to maintain and extend the service life of steel structures in general and steel piles in particular. Steel piles support not only vertical loads but al
Jan 1, 2017
-
Concrete Overbreak Estimation and Analysis Errors in Bored Piles
By Nuno Cruz
"The concrete overbreak estimation for bored piles provides the quantification of the shaft’s expansion beyond its theoretical volume. There are stability analysis methods that can be employed before
Jan 1, 2017
-
Dragline Extraction of 1.2 Million Tonnes of a 52-Meter Thick Vertically Dipping Coal Seam
By T. J. Morris
"From November 2014 through September 2016, Westmoreland’s Coal Valley Mine utilized a Marion 7450 electric walking dragline to extract 1.2 million tonnes of a vertically-dipping, 52-meter wide, fault
Jan 1, 2017
-
Self-Hardening Slurry Wall Installation by Hydromill at the Herbert Hoover Dike – An Innovative Solution (05e83755-4ec2-4ed4-a26c-d1e81c41960c)
By Mario Mauro, Jeff Taylor, Carlos Morales
"In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehab
Jan 1, 2017
-
In-Pit Crusher Location as a Dynamic Location Problem
By M. Paricheh, M. Rahmanpour
"The cost efficiency and high reliability of semi-mobile or combined in-pit crushing-conveying (IPCC) and truck systems, compared to conventional truck-shovel systems alone, make them more attractive
Jan 1, 2017
-
Meeting Today’s Challenge in Nickel Production: Reducing Operating Costs at Nickel Sulphide and Laterite Plants
By A. E. M. Warner, A. Vahed, P. J. Mackey
"Since early 2015, the price of nickel has dropped from the region of US$6/pound to current levels of around US$4.60/pound (March 2017), reflecting several market factors, but principally due to lower
Jan 1, 2017
-
Changes in Stress and Displacement Caused by Longwall Panel Retreats
By Ihsan B. Tulu, David F. Gearhart, Gabriel S. Esterhuizen
"Ground deformation and support response was monitored in a longwall gateroad as part of a research project into gateroad stability under changing loading conditions. In this study, instrumentation wa
Jan 1, 2017
-
Leaching Characteristics of Nickeliferous Pyrrhotite Tailings from the Sudbury, Ontario Area
By Elizabeth Edwards, Radhakrishnan Mahadevan, Vladimiros G. Papangelakis, Srinath Garg, Kurtis Judd
Mineralogical characterization of the tailings showed the deportment of Ni to be similar in the Vale and Glencore tailings, with 60% of the total Ni locked in pyrrhotite, and the balance 40% associate
Jan 1, 2017
-
Role of Probabilistic Methods in Sustainable Geotechnical Levee Integrity Analysis
By Juan M. Pestana-Nascimento, Robert G. Bea, Hamed Hamedifar, Emery M. Roe
The current State-of-the-Practice is grounded heavily on deterministic characterization and assessment of the performance of civil engineering infrastructure. In particular, flood defense systems, suc
Jan 1, 2017
-
The Future Shape of Mineral Processing
By M. J. Bunyard, I. Mullany
"The pressures on mine operators are varied and constantly increasing, declining ore grades, more remote locations and increasing environmental concerns. The challenge facing the mining industry is to
Jan 1, 2017
-
Cautious optimism for the future of mining; Resolution Copper eyes next steps
By William Gleason
"The times they are a changing, and, for the mining industry, the optimism is high. On Nov. 8, Donald Trump was elected as the 45th president of the United States, and the Republican Party won a major
Jan 1, 2017
-
New Ways to Reduce Carbon-Related Gold Losses in CIL and CIP Processes
By K. Lillkung, J. Kourunen, M. Latva-Kokko
"Carbon-in-leach (CIL) and carbon-in-pulp (CIP) processes utilize activated carbon to adsorb solubilized gold for recovery. Due to carbon attrition and non-ideal carbon management, however, some of th
Jan 1, 2017
-
Selecting the Correct Cyanide Destruction Process for Your Operation
By R. Agius, A. Nacu
"Adoption of the International Cyanide Management Code, regulatory requirements and community concerns have increased the need to implement suitable cyanide destruction processes at gold operations to
Jan 1, 2017
-
Extra Deep Cut-Off at 250 m Depth - A Case Study
By Federico Pagliacci
"Many existing dams are subject to underwater seepage due to subsoil conditions, like deep alluvial deposits or pervious rocks or karst. Remedial works are necessary in order to install new cut-off wa
Jan 1, 2017
-
Research Progress on Fully Mechanized Mining Technology of Steeply Dipping Seams
By Hongwei Wang, Hao Zhang, Panshi Xie, Xicai Gao, Youfu Zeng, Yongping Wu, Juan Dou
"The reserves and production of steep coal seams account for approximately 15–20% of the total coal reserves in China and 5–10% of the total annual coal production. More than 50% of the coal is high-q
Jan 1, 2017
-
Measured and Modeled Settlements of Power Plant on Piled Raft Foundations (2734870e-dd47-46f3-a815-25575798a774)
By Alireza Ayoubian, Douglas S. Roy, Gianni O. Chieruzzi
"A 400 MW, gas-fed power plant on floating piles and piled raft foundations was constructed in the Province of Moskovskaya, Russia in 2008. The subsurface is characterized by fill underlain by loose t
Jan 1, 2017