    Our Efforts to Modernize an Archaic Mine Project Cost Estimating Software System

    By S. Stebbins

    In 1994 Western Mine Engineering, Inc., (WME), which is now InfoMine USA, Inc., set out to build a suite of stand-alone software programs that would provide their clients the means to estimate the cos

    Jan 1, 2019

  • CIM
    Lucky Friday’s No. 4 Shaft - Ten Years from Concept to Completion

    By David Berberick

    "Hecla Limited’s No. 4 Shaft at the Lucky Friday Mine is the largest capital expenditure in the corporation’s 128-year history and is considered the deepest shaft in the United States. This paper will

    Jan 1, 2019

  • CIM
    New Opportunities for Closed Mining Sites: Bioprospecting for Antibacterial Agents

    By G. N. A. Senhorinho, J. A. Scott, C. A. Laamanen

    "Closed mine sites are widely regarded as a negative asset due to their legacy of environmental impacts. These sites are often characterized by waterbodies with elevated metal concentrations and low p

    Jan 1, 2019

  • CIM
    Advances in Complex Copper Concentrate Smelting at the Tsumeb Smelter

    By B. Kruger

    The Dundee Precious Metals Tsumeb Smelter has evolved over the last decade to meet the challenges and opportunities brought about by a changing copper concentrate market, technological advances, env

    Jan 1, 2019

  • SME
    Mineworkers’ Perceptions of Mobile Proximity Detection Systems

    By J. Helton, J. L. Bellanca, M. McNinch, L. R. Swanson

    DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the official position of the National Institute for Occupational Safety and Health, Cen

    Jan 1, 2019

  • SME
    The Development of a Multiple Level Underground Limestone Mine from Geology through Mine Planning

    By Christopher Newman, Robert Dupuy, David Newman

    "The development of a multiple level underground mine is a complex task in which geology, engineering, ground control, and unit operations are integrated into a single mine design. The components are

    Jan 1, 2019

  • CIM
    Incorporating Ventilation Fan Plants in Rail and Vehicular Roadway Overbuilds

    By R. E. Ray

    "As real estate for new development in urban settings becomes scarce, commercial high rises are being constructed above open passenger rail tracks and vehicular roadways. Rail and roadway overbuilds a

    Jan 1, 2019

  • CIM
    Cu Extraction from Naturally-Sourced CuFeS2 Coupled to Zn Electrowinning in a Battery-Like System

    By K. M. Deen, E. Asselin

    Hydrometallurgical processes, i.e., Cu extraction from a mineral concentrate and Zn electrowinning, are coupled in a battery-like system. A naturally-sourced CuFeS2 concentrate mixed with activated ca

    Jan 1, 2019

  • SME
    Optimization Oriented Work Preparation for Sub-Surface Construction Work under Special Consideration of Construction Logistics and Explicit Choice of Procedure and Equipment

    By J. Herhold, S. Plaum

    The focus within the economical optimization of projects, which are conducted underground, shifts more and more towards the conduction of construction work underground. Underground operations can be d

    Jan 1, 2019

  • SME
    Practical Options for Solving the Dolomite Problem with Florida Phosphate Resources

    By C. Feng, W. Song, B. Moudgil, P. Zhang, W. Xiao

    Separation of dolomite from phosphate is the most challenging problem in phosphate mineral processing. Over 50% of the future phosphate reserves in Florida contains too much dolomite to process using

    Jan 1, 2019

  • CIM
    Overview of Active Explosion Barrier Systems for Underground Coal Mines

    By Laura Steeves, Inoka Eranda Perera, Jhon Silva, Arend Spaeth

    "This paper reviews the main concepts ruling the design, implementation and performance of active explosion barrier systems for underground coal mines in the USA. The document examines the parameters

    Jan 1, 2019

  • SME
    Longwall-Induced Subsurface Deformations and Permeability Changes—Shale Gas Well Casing Integrity Implication

    By E. Watkins, V. Gangrade, P. Zhang, J. Addis, D. W. H. Su, T. Minoski, C. Hollerich, M. Van Dyke, S. Schatzel, H. Dougherty

    "This paper presents the results of a comprehensive study conducted by the Centers for Disease Control (CDC), National Institute for Occupational Safety and Health (NIOSH), Pittsburgh Mining Research

    Jan 1, 2019

  • CIM
    Auction-Based Control as a Site Implementable Means of Stabilising the Movement of Material through a Train of Countercurrent Decantation Thickeners

    By B. R. Maas

    Processing material at a consistent rate through the continuous countercurrent decantation (CCD) thickeners presented a major bottle neck to unlocking additional value from one of the post-flotation s

    Jan 1, 2019

  • CIM
    Preventing and Managing Fires at Deep and Ultra-Deep Level Gold Mines in South Africa

    By M. G. Beukes

    "In South Africa most of the large gold mines operate between 1500m and 4500m below surface where reef is accessed initially through a vertical shaft system then via a network of tunnels and mined in

    Jan 1, 2019

  • SME
    Ground Penetrating Radar for Karst Detection in Underground Stone Mines

    By R. Bishop, J. Baggett, J. Monsalve, J. Hole, N. Ripepi, A. Abassi

    This work focuses on the operational and safety issues associated with karst voids in large opening underground mines. Issues include water inrush, structural instability, and engineering uncertainty

    Jan 1, 2019

  • SME
    Developing Trees Tolerant to Degraded Mine Soils

    By C. Opoku-Ware, M. Kukay, P. Conrad, F. Inkoom, R. Pal

    Researchers at Montana Tech are investigating the potential for developing trees tolerable to degraded un-reclaimed mine site tailings and soils as a solution to re-establishing long-term tree growth

    Jan 1, 2019

  • CIM
    Start Up, Commissioning and Optimization of the Gravity Circuit at Atlantic Gold’s Moose River Project in Eastern Canada

    By C. Hudson, D. Tremblay, A. Frey

    "A discussion of the design, challenges and successes associated with the commissioning of the gravity recovery circuit at Canada’s newest open pit gold mine - Atlantic Gold’s Moose River Consolidated

    Jan 1, 2019

  • CIM
    Maximising Hoisting Capacity Whilst Minimising Capital Investment

    By A. A. Wessels, D. P. Allison

    "Mine hoists are built to handle a certain nameplate capacity; they are specified and designed according to the required duty. However, as production capacity increases in other parts of an operation,

    Jan 1, 2019

  • CIM
    Gold Recovery Improvement in Heap Leaching Operations

    By A. Ghahreman, M. Oliazadeh

    "Heap leaching is an attractive process for low grade deposits where the metal content of ore does not justify the high cost of milling and agitated leaching. In general, the heap leaching capital cos

    Jan 1, 2019

  • SME
    Long-Term Subaqueous Solute Generation in Pit Lakes: Implications for Modeling and Closure

    By C. P. Newman, T. Gray, G. Beale, T. Cluff

    Predictive geochemical and limnologic modeling of pit lakes is an important aspect of modern permitting. One of the key assumptions of many predictive pit-lake models is that highwalls and pit backfil

    Jan 1, 2019