Search Documents

Sort by

  • CIM
    Orano Mining R&d And Innovation Portfolio And Deployment Methodology

    By Hervé Toubon, Matthieu Davrinche, Jim Corman, Mamane Bello Boubacar Kinassa, Pierre Amadieu

    Orano Mining maintains a significant level of Innovation and Development Research for its sites in Canada, Niger, Kazakhstan, Mongolia, and France. This effort is formalized within the six major thema

    Jan 1, 2020

  • CIM
    Predictive Modeling For In Situ Recovery Operation

    By Gwenaële Petit, Ulan Massimkhanov, Gilles Joubert

    For its Zuuvch Ovoo uranium deposit in Mongolia, Badrakh Energy (partly owned by Orano Mining) is working on the prefeasibility study for exploitation by ISR (in situ recovery). As part of this projec

    Jan 1, 2020

  • CIM
    Improving Uranium Processing With Membrane Systems

    By Georges Croisé, Les-Lee Thompson, Adrien Debergé

    Membrane filtration systems have regained focus in recent years as an effective means of liquid-liquid separation to increase the concentration of valuable elements, recover reagents or remove impurit

    Jan 1, 2020

  • CIM
    Uranium In Argentina: Resources, Demand And Perspectives For Nuclear Supply

    By L. López

    Argentina reported about 40,000 tonnes of uranium (tU) as reasonably assured resources and inferred resources for the production cost category <130 US$/kgU in the OECD-NEA/IAEA classification scheme.

    Jan 1, 2020

  • CIM
    Alkyl Arsines And U

    By J. Gogal

    Cameco's Cigar Lake Operation (CLO) started commercial uranium ore production in 2015. Initial mining was focused in areas of the ore body with relatively low concentrations of elements of concern (EO

    Jan 1, 2020

  • CIM
    Radium In Mining Effluents: Promising Water Treatment And Environmental Monitoring

    By J. Schick, V. Granger

    Nowadays, all French former uranium mining sites are remediated and redeveloped. If needed, mining waters containing radium have to be treated before discharged into the environment. Classical radium

    Jan 1, 2020

  • CIM
    What Will Future Uranium Mining Projects Look Like?

    By M. Fairclough, B. Moldovan

    Insights into uranium mining projects of the future can be gained by a careful statistical analysis of past and present deposits, as well as an examination of recent trends for uranium resource evalua

    Jan 1, 2020

  • CIM
    Two-stage Counter-current Leaching Of Uranium Ore From Global Atomic’s Dasa Project

    By J. A. Brown, F. P. Kerr, M. A. Archer

    Extensive testwork on Global Atomic’s Dasa Project in Niger has been conducted at SGS Minerals laboratory in Lakefield, Ontario. Much of this testwork has focused on a two-stage counter-current leach

    Jan 1, 2020

  • CIM
    The Research And Development Of World Uranium Processing Technologies

    By J. Zhang, T. Oleniuk

    It is well-known that Saskatchewan has the world’s richest uranium deposits and advanced processing technologies. Unlike the Saskatchewan deposits, complicated mineralogy is common for other places in

    Jan 1, 2020

  • CIM
    Technical Advancements Towards Achieving 1500 T/a Production Rate At The Honeymoon Isr Operation

    By A. Rao, J. A. Davidson, B. L. Jones, K. W. Bowes, D. Craib

    Supported by ANSTO, Groundwater Science and Inception Consulting Engineers, Boss has embarked on a series of technical projects aimed at reinforcing the Project’s capability to meet its export permit

    Jan 1, 2020

  • CIM
    Improving Pumping Capacity And Reliability In The Mcclean Lake Leach Circuit

    By J. Aydt, W. McCombe, H. McLaughlin, L. Nightingale-Mercer

    The McClean Lake mill is located approximately 850 kilometers north of Saskatoon, Saskatchewan, Canada and is operated by Orano Canada Inc. (Orano). The mill was designed to process high grade uranium

    Jan 1, 2020

  • CIM
    Continuous Uranyl Peroxide Precipitation From Combined Solvent Extraction Strip Liquor And Ion Exchange Eluate For The Honeymoon Uranium Project

    By K. Bowes, M. D. Maley, R. J. Ring

    The Honeymoon Uranium Project is an acid In-Situ Recovery (ISR) mine in South Australia. It was previously operated for approximately 18 months before being placed on care and maintenance in 2014, it

    Jan 1, 2020

  • CIM
    Uranium Mine Remediation In Northern Australia

    By Peter Waggitt

    Northern Australia has been home to uranium mining for over 70 years, more or less continuously. In the early days, post World War 2, there was little effort made to remediate workings at the end of o

    Jan 1, 2020

  • CIM
    Contaminant Dynamics In The Flooded Mine Pit At Abandoned Gunnar Uranium Site, N. Saskatchewan

    By Anton Sizo, Alexey Klyashtorin

    The Gunnar uranium mine operated from 1953 to 1961 on the shore of Lake Athabasca, in 1964 the site was abandoned, and the mine pit flooded. In 1981, the pit was found to be stratified with a chemocli

    Jan 1, 2020

  • CIM
    Determination Of Radium In Uranium Mill Effluents By Icp-ms

    By Mike Broczkowski, Laura Dewhirst, Kieran Large, Angelo R. Fernando, Heather Daigneault, Jim Johnson, Randy Wiens

    The radioactive isotope radium 226 is a contaminant of potential concern in effluent waters from metal mining operations in Canada. Acceptable release levels of radium 226 are governed by Metal and Di

    Jan 1, 2020

  • CIM
    Steel From Uranium?

    By Mike Dry, Rod Dry

    If humanity is truly serious about reducing emissions of carbon dioxide into the atmosphere, today’s power plants burning fossil fuels will have to be replaced by power plants that do not emit CO₂. Un

    Jan 1, 2020

  • CIM
    The Free, Prior, And Informed Consent (Fpic) Provisions Of The United Nations Declaration On The Rights Of Indigenous Peoples (Undrip) And The Deployment Of Smrs In Northern Canada - A Review Of Potential Challenges

    By Horatio Sam-Aggrey, Margot Hurlbert

    Small Modular Reactors (SMRs) have been touted as having the potential to spearhead a nuclear renaissance. Proponents of this view cite the relative advantages of SMRs over larger nuclear plants as re

    Jan 1, 2020

  • CIM
    Material Characterization – An Absolute Mustfor Predicting The Flow Behaviour Of Your Hazardous Material

    By C. Holmes, T. Holmes

    Engineered-in material handling problems are responsible for significant unrealized value in mineral processing plants. At the root, is a lack of awareness and understanding of bulk material handling

    Jan 1, 2020

  • CIM
    Electrolytic Reduction, Precipitation, And Thermal Decomposition Of Uranous Sulfate: A Pathway For Closed Loop Sulfuric Acid Recycle

    By A. D. Burns, K. M. Nikolaisen

    Electrolytic reduction followed by the addition of sulfuric acid and the application of heat can be used to selectively crystallize uranous sulfate from solution. This approach, when coupled with down

    Jan 1, 2020

  • CIM
    Challenges In Settling Leached Cigar Lake Ore

    By B. Holaday, H. McLaughlin

    Orano Canada Inc. (Orano) operates the McClean Lake mill, located in the Athabasca Basin region of northern Saskatchewan. It processes high concentration uranium ore, delivered in slurry form from the

    Jan 1, 2020