Search Documents

Sort by

  • AUSIMM
    Preparation of a JORC Code Compliant Resource Statement Based on an Evaluation of Historical Data – A Case Study from the Panguna Deposit, Bougainville, Papua New Guinea

    By P Collier

    From 1972 until 1989 when operations were suspended Bougainville Copper Limited (BCL, owned 53.58 per cent by Rio Tinto Limited) operated a large open pit mine and processing facility at Panguna on Bo

    Aug 22, 2011

  • SME
    Preparation Of Environmental Impact Study (EIS) And Environmental Adjustment And Management Program (PAMA) Guidance Documents For Peru's Ministry Of Energy And Mines

    By R. L. Kloberdanz

    Peruvian legislation requires the preparation of an Environmental Impact Study (EIS) for new and expanding mines/beneficiation facilities and the preparation and implementation of an Environmental Adj

    Jan 1, 1998

  • IMPC
    Preparation of High Quality Magnetite Concentrate from Pyrite Cinder by Composite Pellet Reduction-roasting and Magnetic-separation

    Domestic production of pyrite cinder reached 15.95 million tons in 2006. The pyrite cinder used in cement industry accounts for about 30% production. The remaining 70%, 11.17 million tons, was thrown

    Jan 1, 2014

  • SME
    Preparation of Magnesium Chloride from Magnesite Dust Using Hydrochloric Acid Leaching and Spray Drying

    By Ch. R. V. S. Nagesh, Ramesh Naidu Mandapati, Venkata Swamy Nalajala, Tondepu Subbaiah, Naga Jyothi Kothamasu

    Leaching studies of magnesite obtained from Tamilnadu Magnesite Limited, Salem, have been carried out using hydrochloric acid leaching and percentage of magnesium chloride recovered was estimated. The

    Jun 7, 2022

  • SME
    Preparation Of Oklahoma Metallurgical Coal Howe Mine Pilot Plant

    By James Yancik

    The Howe Coal Company located in Leflore County, Oklahoma is mining the Oklahoma Lower Hartshorne Coal bed which ranges in thickness from 38" to 42" and dips approximately 7 degrees to the Northeast.

    Jan 1, 1969

  • IMPC
    Preparation of Porous Silica with Nanofibrous Morphology from Chrysotile by Selective Leaching

    By Y. X. Yang

    Porous silica was obtained by acid leaching of chrysotile. The porous silica had been characterized by chemical analysis, powder X-ray diffraction (XRD), Fourier transform infrared spectros-copy (FT-I

    Jan 1, 2014

  • IMPC
    Preparation ZnO Nanoparticles Using Blendes as Raw Material

    By W. Z. Yin

    It is investigated systemically in this paper that the granularity of the precursor, ZnC2O4?2H2O, is influenced by synthetic conditions. Instantaneously adding of precipitation agent is able to contro

    Jan 1, 2014

  • IMPC
    Preparation, Structure and Mechanical Properties of PET/Kaolin Nanocomposites

    By Y. P. Lu

    PET/kaolin nanocomposites were prepared with melt blending and the structure of the composites was characterized through IR techniques. The results showed that there is stable chemical bonding between

    Jan 1, 2014

  • SME
    Preparatory Work Required for a Long-Term District Recirculation Test in a Gassy Underground Metal-Non Metal Mine

    By Christopher J. Pritchard

    Federal mine safety regulations prohibit the recirculation of face air In a gassy Class III metal-non metal mine. Tg Soda Ash, Inc, operates a 2.0M ton/yr (2.2 million st/yr) underground gassy Class I

    Jan 1, 1995

  • ISEE
    Preparing a Written Blast Plan

    By David Ziegler

    Rough sketches, field notes, an on-site conference or a phone call may no longer suffice to establish your blast plan at a job site. More and more, general contractors, site supervisors, owner re p re

    Jan 1, 2004

  • ISEE
    Preparing a Written Blast Plan (1b8a88a8-1e7f-429f-bd71-b32f7b3dbf86)

    By David Ziegler

    A formal blast plan is sometimes required for projects involving rock excavation. A written blast plan submitted with a bid proposal can also be an important sales tool. A blast plan will cover the ba

    Jan 1, 2003

  • AUSIMM
    Preparing Effective Specifications for Occupational Health and Environmental Noise Objectives in Mining Project Design and Delivery

    By C Tickell

    Achieving occupational health and environmental noise objectives is a major consideration in the planning or operational phase of resource development and industrial projects to meet the needs of the

    May 9, 2016

  • AUSIMM
    Preparing for Progressive Mine Rehabilitation Sign-off in Queensland

    By P Swart, A Fletcher, P D. Erskine

    Glencore Coal Assets Australia (GCAA) operates five coalmines in Queensland and has rehabilitated thousands of hectares of mined land across these sites. Accordingly, GCAA seeks to continually improve

    Jun 28, 2016

  • AUSIMM
    Preparing for Uncertain Mineral Futures - A Survey of AusIMM Members on the Future Issues and Drivers for the Australian Minerals Industry

    By C Mason, A Littleboy

    This paper presents the results of a large scale survey of The Australasian Institute for Mining and Metallurgy (AusIMM) membership. This survey aimed to understand and define the key issues and drive

    Jan 1, 2009

  • AUSIMM
    Preparing Mining Engineers for the e-World

    By M Boyd

    The University of Wollongong was named University of the Year 2000, for its work in preparing students for the e-world. Computer facilitated learning is being introduced into subjects throughout the e

    Jan 1, 2002

  • IMPC
    Preparing Strontium Carbonate with Celestite Concentrate by Agglomeration-reduction Roasting Process

    By G. H. Li

    Preparation strontium carbonate with celestite concentrate by flotation is studied by agglomeration-reduction roasting process. It is shown that, the drop strength of green pellet is greater than 4 ti

    Jan 1, 2014

  • SME
    Preprint - Washington, D.C. Impact On Mining In Alaska

    By Ernest N. Wolff

    You here are all familar with the myriad of new laws, some enacted and some pending, that affect the mining industry. These laws, for example those dealing with suspended matter, affect us in Alaska a

    Jan 1, 1973

  • AIME
    Prereduced Iron Ore Pellets: State Of The Art – Part II

    By Morris M. Fine, Norwood B. Melcher

    It is out of the question, at this time, to select any one prereduction process as superior to the others. It is apparent that several share a basic similarity and that within the groups listed in Par

    Jan 8, 1966

  • NIOSH
    Prereduced Iron Ore Pellets: Preparation, Properties, Utilization

    By M. M. Fine

    A process for simultaneously reducing and indurating iron are pellets was developed by Bureau of Mines laboratory research and confirmed on a continuous pilot plant basis. Moist iron are concentrate w

    Jan 1, 1970

  • DFI
    Prescriptive Specification Design: The Impact on Cost and Constructability – Case History

    By Shawna Munn, Nadir Ansari, Allison Bennett

    "This paper outlines how specification driven design has made Toronto Area transit infrastructure projects more expensive than similar private projects, and provides a case study of the results of an

    Jan 1, 2017