Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimisation of the Prominent Hill SAG MillBy Mark Weidenbach
OZ Minerals owns and operates the Prominent Hill copper-gold concentrator in South Australia, built in 2008 and commissioned in early 2009. The concentrator operates via semi autogenous grinding in a
Jan 1, 2012
-
Optimisation of the Sepon Copper Milling CircuitBy A Jakowetz
OxianaÆs Sepon Copper Operation (part of the combined Sepon Gold and Copper Operation) is located in Savannaket Province, in southern central Lao PDR. The site is relatively remote, being some five ho
Jan 1, 2006
-
Optimisation Opportunities for High Pressure Grinding Rolls CircuitsBy B Davis, A H. Benzer, A N. Mainza, C M. Evertsson, L M. Tavares, M M. Hilden, M S. Powell, C Rule, G Asbj÷rnsson
The Mogalakwena North Concentrator of Anglo Platinum Operations was built with the capability to allow for future projected expansion. Several research groups, currently working with Anglo American on
Oct 29, 2012
-
Optimised Process Control in Iron Ore via Online Analysis of Light ElementsBy L Köresaar, J Moilanen
With lower and increasingly variable Fe grades in iron ore resources, the monitoring of Si, Al, Mg and other light elements to meet quality requirements is gaining importance in the iron ore beneficia
Jul 13, 2015
-
Optimising a Combined Open Pit and Underground Strategic PlanBy M Maulen, K van Olden, T Elkington
A large open pit is planned at the site of an existing underground mine. Strategic planning work has been undertaken to investigate the project value associated with an expansion of underground operat
Jan 1, 2009
-
Optimising Assessment and Selection with Indigenous People in Remote CommunitiesBy P Davidson
For many years, in numerous settings, the need for a language-fair and culture-fair assessment test has been identified as a significant issue for employment and selection for training of remote indig
Jan 1, 2006
-
Optimising Carbon Management – Increasing Gold Recovery and Decreasing Costs with the Carbon ScoutBy T D. H McGrath, O Baker, W P. Staunton, C Ypelaan
"The carbon-in-pulp process has been used extensively in the gold industry since the late 1970s to recovery leached gold from solution. Despite more than 30 years of experience in operating carbon cir
Oct 10, 2016
-
Optimising Circuit Design for Gravity Gold RecoveryTo determine the optimal circuit configuration for gravity gold recovery consideration should be given to a range of factors in addition to the efficiency of the gravity circuit, including capital cos
Jan 1, 2011
-
Optimising Flotation Innovations and the Role of Plant TestworkOptimising flotation designs and innovations is a complex process involving many parameters, one of which is ensuring sufficient testwork is carried out at plant level before these innovations are lau
Jan 1, 2014
-
Optimising flotation plant operation by using a digital twin in the control roomBy R Tooher, S J. Oliver
The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p
Aug 29, 2018
-
Optimising Land for Beneficial Use During and After MiningBy J Purandare, D Murdoch
The goal of the life-of-mine plan is to ensure that while the site is left safe, stable and non-polluting, the landscape is such that optimal use can be made of the site post-mining and closure. Howev
Jun 28, 2016
-
Optimising Leach Pad Construction Methods for Site Specific ApplicationsBy Thompson P, Sharma Y
The paper describes the methodology and results from a study carried out by Telfer Gold Mine to optimise the materials and costs involved in construction of the pad for their dump leach operations.
Jan 1, 1994
-
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer ProgrammingBy Y Li, S Ramazan, E Topal
A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t
Nov 24, 2014
-
Optimising the Management of CIP/CIL CircuitsBy K. Barbetti
"The carbon-in-pulp (CIP) process has been the dominant gold recovery process since the early 1980s. CIP has proven to be very adaptable for a wide range of ores and circuit configurations. The key pe
Jan 1, 2017
-
Optimising the operation of paste thickening at the Yara Siilinjärvi PlantBy E Ruhanen, S Kauvosaari, M Kosonen, C Meintjes
The Yara Siilinjärvi plant is located in the central part of Finland. Siilinjärvi is Western Europe's only apatite mine and annually it produces 1 Mt of apatite concentrate, which create
Aug 29, 2018
-
Optimising the Operation of Paste Thickening at the Yara Siilinjärvi Plant (8a3674cf-2785-43be-b17f-05be124f63bf)"Yara Siilinjärvi in Finland is the Western Europe's only apatite mine. Annually it produces one million tons of apatite concentrate, which creates 10 million tons of tailings. At the beginning of 201
Jan 1, 2019
-
Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fillBy D Pateman, F de Fredrick
The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)
Mar 15, 2021
-
Optimización de Análisis Granulométrico de Stockpiles mediante equipos no tripulados UAV en mineríaBy Jairo Romero, Fernando Pajuelo
Los avances en tecnologías digitales han permitido nuevos métodos de trabajo para realizar pruebas, como el análisis granulométrico. Por esta razón, este estudio propone aprovechar la fotogrametría me
Sep 29, 2023
-
Optimización de la conminución para maximizar la molienda SAG en Minera Las Bambas: integración de los procesos de mina y plantaBy Zetti Gavelan, Eric Ruiz, Emilio Delgado, Ely Loayza, Jesús Cruces
Debido a la variabilidad de la competitividad del yacimiento que está formado por skarn y pórfidos, para mejorar el concepto de conminución en Las Bambas el proceso de reducción de tamaño se inició en
Mar 30, 2020
-
Optimización de las actividades de perforación y voladura en la UM San Rafael mediante la implementación en campo del modelo de rotura y la predicción de cavidadesBy Frank Gómez, Solange Ríos, Jean Valencia
La eficiencia y evolución de las actividades de perforación y voladura son de gran relevancia en la actualidad debido al impacto que causa en los procesos posteriores dentro de las operaciones mineras
Sep 30, 2022