Search Documents

Sort by

  • NIOSH
    OFR-10-80 Evaluation Of Mine Parameters For Copper-Nickel Deposits For Northern Minnesota

    By C. M. St. John

    A series of analyses of possible mining excavations associated with the development of copper nickel deposits of the MINNAMAX site in Northeastern Minnesota is presented. Specific areas such as roof a

    Jan 1, 1979

  • NIOSH
    OFR-10-82 Automatic Trapped Miner Seismic Signal Detection And Analysis System

    By Tim F. Dyson

    Feasibility of employing automated processing and detection techniques in the mine disaster communications problem is demonstrated. Efficient processing methods are developed. These methods have been

    Jan 1, 1981

  • NIOSH
    OFR-10-84 Concurrent Establishment Of Ground Cover And Hardwood Trees On Reclaimed Mineland And Unmined Reference Sites ? Summary And Conclusions ? Introduction - Background

    By W. R. Byrnes

    This project was initiated on October 1, 1980 and will be completed on December 31, 1983. The project was Initially approved and funded by the Office of Surface Mining and subsequently was moved to th

    Jan 1, 1983

  • NIOSH
    OFR-10-85 Subsurface Leaching Of Pyritic Coal Mine Spoils And Contaminant Migration - Summary

    By Jeffrey P. Schubert

    The study site in northeastern Illinois underwent surface mining for coal in 1943 and was reclaimed by the state of Illinois in 1972-1973. Additional soil amendments and seed were applied to the spoil

    Jan 1, 1984

  • NIOSH
    OFR-10-94 Coal Recoverability And The Definition Of Coal Reserves: Central Appalachian Region, 1993

    By Timothy J. Rohrbacher

    This report presents results from an ongoing U.S. Bureau of Mines study defining domestic coal reserves. Examinations of five 7 ½ -minute central Appalachian quadrangles have been completed to date. O

    Jan 1, 1994

  • NIOSH
    OFR-100(1)-76 Development Of Pre-Mining And Reclamation Plan Rationale For Surface Coal Mines - Volume I Of III - The Rationale For Data Acquisition

    VOLUME I Volume I of this three-volume report is the result of development of a comprehensive, coordinated approach to site data-acquisition activities to produce key plans and reports during the e

    Jan 1, 1976

  • NIOSH
    OFR-100(1)-83 Evaluation Of Proximity Warning Devices (Phase III, Volume 1)

    By J. H. Nixon

    A three phase program evaluated commercial proximity warning devices, developed and designed a microprocessor-based electrostatic field measurement instrument, and utilized this instrument to investig

    Jan 1, 1982

  • NIOSH
    OFR-100(2)-76 Development Of Pre-Mining And Reclamation Plan Rationale For Surface Coal Mines - Volume II Of III - Methods Of Data Acquisition

    VOLUME II Volume II, in conjunction with Volume I, is a general guide to the selection of cost-effective methods of site data acquisition in all geologic environmental, and socio-political circums

    Jan 1, 1976

  • NIOSH
    OFR-100(3)-76 Development Of Pre-Mining And Reclamation Plan Rationale For Surface Coal Mines - Volume III Of III - Legal Controls Of Surface Mining

    VOLUME III The objective of Volume III of this report is to provide a concise review of six major types of legal constraints, controls, and regulations on surface coal mining in the United States,

    Jan 1, 1976

  • NIOSH
    OFR-100(3)-77 Design And Development Of A Machine Familiarization Trainer For Dragline Operators - Phase II Report

    By Peter Murphy

    This report (arid related appendices) provides a description of the functional design specifications, engineering design specifications, and program of instruction for development of a training system

    Jan 1, 1976

  • NIOSH
    OFR-100(3)-82 Inventory Of Coal Waste Embankments, Surface And Underground Openings

    By G. Ahnell

    Throughout portions of four (4) heavily mined Appalachian states subdivided by the Mine Safety and Health Administration (MSHA) as: District 3 -Northern West Virginia and Maryland; District'" -So

    Jan 1, 1982

  • NIOSH
    OFR-100(4)-77 Design And Development Of A Machine Familiarization Trainer For Dragline Operators - Appen A: Program Of Instruction-Modules 10-17 - Appen B: Instructional Time Breakdowns - Phase II Report ? Appen A (Continued) Program Of Instruction

    [Module 10. Internally Cued Operating Contingencies Prerequisite: Modules 1-7 - Estimated Instructional Time: 2.42 hrs. Module Abstract Trainees, using programmed instruction, describe the cues

    Jan 1, 1976

  • NIOSH
    OFR-100-78 Improved Visibility Systems For Large Haulage Vehicles

    By Kent W. Hawley

    An improved visibility system was developed for use on the large (100 ton+) haulage trucks typically operated in open pit and surface mines. The improved visibility system provides the truck driver&ap

    Jan 1, 1978

  • NIOSH
    OFR-100-84 Research Study On The Technology For Control Of Environmental Noise From Off-Road Haul Trucks

    By John L. Dahle

    This report documents the research efforts that were undertaken to design, install and test noise abatement devices for use on off-highway haul trucks operating in surface mines. The objective of the

    Jan 1, 1983

  • NIOSH
    OFR-100-93 Results Of The 1991-92 U.S. Bureau Of Mines Site Specific Mineral Investigations Project In Alaska

    By Steven A. Fechner

    In 1991 and 1992, the Bureau of Mines completed chromium, platinum-group metals (PGM), and tin investigations, and started indium, manganese, titanium, and vanadium investigations in Alaska. These stu

    Jan 1, 1994

  • NIOSH
    OFR-101-79 Development Of Fail Safe Trolley Energizing/De-Energizing System

    By D. S. Kimmel

    The Bureau of Mines sponsored development of a system to remotely energize and de-energize the trolley wire in a section in response to demands from vehicles as they enter and leave the controlled sec

    Jan 1, 1978

  • NIOSH
    OFR-101-80 Environmental Assessment Of In Situ Mining

    By Dennis R. Kasper

    This study evaluates selective environmental impacts of two distinct in situ mining techniques. In situ leaching of uranium, porphyry copper and native copper and in situ borehole (slurry) mining of u

    Jan 1, 1979

  • NIOSH
    OFR-101-84 Development Of A Multiple Unit Continuous Haulage System

    By GJ Hundman

    The Multiple Unit Continuous Haulage (MUCH) System was designed to provide the capacity to continuously convey coal from the mining machine to the main haulage belt. The MUCH System has an operator

    Jan 1, 1983

  • NIOSH
    OFR-102-75 Operating Practice Changes And Control Modifications To Improve The Safety Of Coal Augering Operations ? Introduction And Approach

    Auger operations produced 14 million tons of coal in 1974, or approximately 5% of all surface mined coal. It was the most efficient of all coal mining methods, producing 40.0 tons per man-day. Exhibit

    Jan 1, 1975

  • NIOSH
    OFR-102-80 Evaluation Of The Kloswall Longwall Mining System

    By Paul J. Guay

    This report presents the results of evaluating a longwall mining system specifically designed to extract a very deep web (60 inches or deeper) from a longwall panel. The report includes a productivity

    Jan 1, 1978