Search Documents

Sort by

  • AUSIMM
    Mathematical Modelling of the Convergence and Vertical Stress Patterns Around a Longwall Panel in New South Wales

    By Pattinaja MA

    Mathematical modelling was carried out to determine the probable convergence and vertical stress patterns around a retreating longwall panel in an underground coal mine in New South Wales. An &apo

    Jan 1, 1986

  • CIM
    Mathematics Model and Programming Realization of the Varying-Rate Gas Drainage Process for a Sealed Lane

    By H. G. Wang

    The production process of a coal mine can often be interrupted by all kinds of events scheduled or unscheduled and thus often needs gas drainage for a temporary or long-term sealed area. Gas drainage

    Aug 1, 2013

  • CIM
    Mattagami River Refractory Clays

    By A. E. Hilder

    Introductory The following pages present the results of field investigations, laboratory and commercial tests, drilling, surveying, and preliminary development of the refractory clays which have been

    Jan 1, 1935

  • CIM
    Mattagarpi Lake Mines Ltd.

    By R H. Hallam

    The Mattagami mining district encompasses a favour-?able belt of folded Keewatin-type rocks, with intercalated sediments and intrusives of late Keewatin age. This environment has been subjected to per

    Jan 1, 1964

  • AUSIMM
    Maturity of Jurisdictional Abandoned Mine Programs in Australia Based on Web-accessible Information

    By C J. Unger, A M. Lechner, A Walton, V Glenn, M Edraki, D R. Mulligan

    In Australia, responsibility for abandoned mines can be unclear. With a few exceptions, state and territory governments have become responsible for abandoned mines on Crown land and private landholder

    Jul 16, 2014

  • AUSIMM
    Maximising asset value through optimal block by block decisions on marginal material

    By F Phillips, E Deucker, J Kato

    It is challenging to determine the optimal mining strategy to maximise value when a mine plan includes mineralised material which does not meet the full cost of mining but has value exceeding the vari

    Mar 15, 2021

  • CIM
    Maximising Concentrate Revenues at the Xstrata Copper Kidd Concentrator

    By G. R. Morin, A. R. Leggett

    "In 2010, closure of the Kidd metallurgical plants along with structural changes to the historical ratios of payable metals led to a review of the operating targets at the Kidd concentrator. Previous

    Jan 1, 2013

  • CIM
    Maximising Hoisting Capacity Whilst Minimising Capital Investment

    By A. A. Wessels, D. P. Allison

    "Mine hoists are built to handle a certain nameplate capacity; they are specified and designed according to the required duty. However, as production capacity increases in other parts of an operation,

    Jan 1, 2019

  • AUSIMM
    Maximising Payable Gold in Base Metal

    Breakwater Resources Ltd is a Canadian base metals producer with Cu-Pb-Zn operations in Canada, Honduras, and Chile. Two of its operations contain economical gold levels which are recovered in both gr

    Aug 1, 2010

  • AUSIMM
    Maximising Productivity through Big Data, Simulation and Predictive Analytics

    By M T. Grigoleit, M S. Schneider

    The iron ore industry in Australia has, in recent years, experienced an unprecedented growth phase. But now that major expansions are moving into the operation phase, new challenges have emerged. Wher

    Jul 13, 2015

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine using Cement Stabilisation

    By P R. Lock

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 km north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦ eas

    Jan 1, 1998

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine Using Cement Stabilisation (484a6aa7-9c11-440d-b7e3-51e52370c111)

    By Lock PR

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 kin north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦

    Jan 1, 1998

  • AUSIMM
    Maximising regional opportunities for in-pit tailings disposal for Queensland coalmines

    By K Baker, J Purtill

    One of the key challenges for the mining industry globally is the rehabilitation of mine waste, and Queensland is no exception. Out of pit waste structures including waste rock dumps and tailings stor

    Aug 2, 2023

  • CIM
    Maximising Return On Your Improvement Efforts

    By Gareth Barnes

    Traditional approach to improvement is driven by good ideas from good people, but whilst the business case may sound good, when the project is complete, we often have not delivered on expectations.  W

    May 4, 2025

  • AUSIMM
    Maximising the value of a drilling program – case study in a challenging environment

    By A A. Latscha, D O’Connor

    Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO

    May 24, 2023

  • IMPC
    Maximising The Value of a Wealth of Information

    By Rob Morrison, Andrew Scott

    "Long before a modern mine commences operations it has already become a wealth of information. After start up, it can generate enormous quantities of data - especially with semi-automated data acquisi

    Jan 1, 2003

  • AUSIMM
    Maximising the value of Rio Tinto’s Yandicoogina orebody – a mine geology perspective

    By A Kleinitz, J Halilovic, K Trappitt

    Mine operators use grade control to determine the destination of each block of material in the mine. In polymetallic mines, grades are best expressed in dollars: the Net Smelter Return, NSR, per tonne

    Mar 22, 2022

  • AUSIMM
    Maximising the Value of æA Wealth of InformationÆ

    By A Scott

    Long before a modern mine commences operations it has already become a wealth of information. After start up, it can generate enormous quantities of data û especially with semi-automated data acquisit

    Jan 1, 2002

  • IMPC
    Maximising the Value of ‘A Wealth of Information’ (1e5cd2ab-37d3-481c-b69f-500fafd475e7)

    By Rob Morrison, Andrew Scott

    "Long before a modern mine commences operations it has already become a wealth of information. After start up, it can generate enormous quantities of data – especially with semi-automated data acquisi

    Jan 1, 2003

  • AUSIMM
    Maximising Value Through Maintaining Your Flotation Equipment

    By B Murphy, S O’Connell, J L. Heath

    In the 1989 best-seller The 7 Habits of Highly Effective People, the author, Stephen Covey, highlights the importance of maintaining not only ‘production’, but also, ‘production capacity’. When operat

    Sep 1, 2014