Search Documents

Sort by

  • CIM
    Locational aspects of mine development economics: Nova Scotia's competitive position in Canada

    By Michel L. Bilodeau, Brian W. Mackenzie, Dallas W. Davis

    "The paper formulates an evaluation procedure for examining the effects of location on the economics of developing mineral deposits. This methodology is applied to assess locational aspects of Nova Sc

    Jan 1, 1986

  • CIM
    Loch Lomond celestite properties

    By STEPHEN V. FORGERON

    The Loch Lamond celestite properties in central Cape Breton Island were mined by Kaiser Celestite Mining Limited from 1970 until 1976. Poor market conditions in J976forced operations to cease. Kaiser

    Jan 1, 1984

  • AUSIMM
    Lode Structures and Ore Shoots at Vatukoula, Fiji

    Vatukoula is a gold mining township situated at the south-west periphery of a Tertiary caldera which measures 3 miles by 4 miles. Erosion of the caldera resulted in the formation of a topographic depr

    Jan 1, 1967

  • AIME
    Logging and Log Interpretation - Gas Detection by Dual-Spacing Neutron Logs in the Greater Oficina Area, Venezuela

    By Edward B. Walker, Michel Grosmangin

    The geological and economic conditions peculiar to the Greater Oficina area are presented to demonstrate the necessity of a low-cost, well-site method of distinguishing gas-bearing formations. The met

    Jan 1, 1958

  • IOM3
    Logging the mechanical character of rock

    By J. A. Franklin, E. Broch, G. Walton

    To make the best use of rock core, the mechanical character of the rock should be evaluated concurrently with conventional geological observations. The advent of simple techniques, such as the point l

    Dec 1, 1971

  • AUSIMM
    Logistics in Mining Towards 2000 'The Low Cost Provider'

    A combination of the needs of business, employee desires and safety and health considerations is stimulating increasing attention to the time spent by people at work and the timing of that work. Pa

    Jan 1, 1996

  • CIM
    Logtung: A porphyry W-Mo deposit in the southern Yukon

    By S. R. Noble, F. R. Harris, E. T. C. Spooner

    "The Logtung deposit discovered in 1976, is an example of large tonnage (162 million tonnes), low grade (0.13% WO3 and 0.052% MoS;) W(scheelite)-Mo mineralization related to multiple felsic intrusions

    Jan 1, 1995

  • DFI
    London One New Change - Energy Piles® And Open Loop Wells Used For Ground Source Heating And Cooling

    By Peter Smith

    One New Change is a landmark retail / commercial development in the City of London. Integral to the structure is the three double storey basement from which the building is serviced. The building cons

    Jan 1, 2010

  • SME
    Long Distance Pipe Jacking In Sayreville, New Jersey

    By Siegmund Babendererde

    1. Introduction In Sayreville, New Jersey, the Middlesex County Utilities Authority put the construction of a 1041 m long sewer outlet to tender in June 1989. It had an internal diameter of 3,36 m

    Jan 1, 1991

  • SME
    Long Haul TBM: Use of a Rebuilt Main Beam Machine at the DigIndy Tunnel System in Indianapolis, IN - NAT2024

    By Christian Heinz, Doug Harding

    TBMs can last for decades and be rebuilt project after project with proper maintenance. How successful can rebuilt TBMs be? At the DigIndy Tunnel System in Indianapolis, Indiana, USA, a rebuilt TBM wa

    Jun 23, 2024

  • AUSIMM
    Long hole plug – addressing the hazard of bogged rods in ‘upholes’

    By G Noonan, S Thomas, M Limbert

    Stuck drill rods (often referred to as bogged rods) in production ‘upholes’ are a common problem in the underground mining industry. Bogged and broken off drill rods have the potential to fall out of

    Oct 16, 2017

  • AUSIMM
    Long Shaft ù A Deep Level Mining Success Story

    By G McLeay, T Moran

    Long Shaft has traditionally been seen as one of the most challenging mines in the Kambalda area with operations having been suspended by the previous owners in 1999. When mining recommenced in Octobe

    Jan 1, 2005

  • SME
    Long Term Behaviour of a Fully Instrumented Test Room in Potash

    By Dennis Z. Mraz, Maurice B. Dusseault

    INTRODUCTION In 1982 and 1983, as part of the mine design program for a New Brunswick potash mine, series of laboratory tests were conducted on potash and salt samples obtained during the mine exp

    Jan 1, 1986

  • AUSIMM
    Long Term Mine Planning at BHP Iron Ore Ltd's Mt Whaleback Mine

    By R D ROSENTHAL

    BHP Iron Ore Ltd's Mt Whaleback is the largest single open-pit iron ore mine in the Pilbara region of Northwestern Western Australia. A division of BHP Minerals, one of three core businesses o

    Jan 1, 1992

  • DFI
    Long Term Performance of Grouts and the Effects of Grout By-Products

    By Stephan A. Jefferis

    I presume that the questioner is not asking about the reduction of sulfate in groundwater to hydrogen sulfide as a result of biological activity promoted by organics in the grout hardener and that the

    Feb 10, 2003

  • SME
    Long Term Performance of the Nickel Rim Reactive Barrier: A Summary

    By Shawn Benner, David Blowes, Carol Ptacek

    A full-scale reactive barrier was installed into an aquifer impacted by acid mine drainage in August 1995 at the Nickel Rim mine site near Sudbury, Ontario. The primary mechanism of water quality impr

    Jan 1, 2000

  • AUSIMM
    Long Tunnel extended Gold Mine, Walhalla-A Recovery and Rehabilitation Project

    By Griffiths J. B

    From its mining lease at the northern end of Cohens Reef at Walhalla in the North Gippsland Mountains, the Long Tunnel Extended Gold Mining Company produced 13,695 kg of gold, which at 1980 prices

    Jan 1, 1981

  • AUSIMM
    Long-Hole Drilling for Gas Emission Control at Appin Colliery NSW, Australia

    By Saghafi A, Kelly M, Williams R. J

    A two year program of research into the feasibility of long-hole drilling for improved gas emission control has been undertaken at Appin Colliery. State of the art equipment was employed involving

    Jan 1, 1988

  • SME
    Long-Range Hydrophobic Forces In Amine Flotation Of Quartz

    A Mark IV surface force apparatus (SF A) was used to conduct direct force measurements in dodecylamine hydrogenchloride collector solution between mica surfaces at varying pHs. It has been found that

    Jan 1, 1996

  • IOM3
    Long-team open-pit production scheduling through dynamic phase-bench sequencing

    By Qing Wang

    In this method the state of an open-pit mine is represented by the number of benches that are mined in each predesigned mining phase (or pushback). Consequently, a specific mining schedule can be repr

    Jul 1, 1996