Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Karst Feature Investigation, Mitigation Design, Specification, and Contract Provisions - NAT2022By Alissa Lockett, Chris D. Breeds
Central Water Integration Project (CWIP) Segment 5-1 is the most critical segment of a regional water supply project that transfers groundwater from Burleson County to northern San Antonio, replacing
Dec 1, 2022
-
Keep ’Em Separated—Managing Contract Interfaces for the Westerly Storage Tunnel (WST) - NAT2022By Ryan P. Sullivan, Ben D. DiFiore, Robert J. Auber, Michael A. Piepenburg, Lisa M. Smiley
Pollution to Lake Erie will be significantly reduced by the Westerly Storage Tunnel (WST) system, which is mainly comprised of a 10,000-ft long tunnel and a dewatering pump station in the downstream t
Dec 1, 2022
-
Keeping It Focused: Conference Reflects On A Year Of Prudent GrowthDespite two large projects represented in the keynote docket, the mood of the 2011 SME Arizona Conference was summed up best by Ferol Baker, general manager of New Mexico Copper Corp. (a wholly owned
Jan 1, 2012
-
Keeping Projects on the RailsBy J Canterford
Although we have access to a wide range of sophisticated process design and improvement tools in combination with a significant range of case studies, the mineral resource industry still manages to be
Aug 8, 2011
-
Keeping up with the Joneses – the value of industry surveys and benchmarkingBy T D. H McGrath, W P. Staunton
Benchmarking, comparing an operation or process with the industry standard, is known to be a useful method for identifying plant optimisation opportunities, and in many cases providing the pathway to
Aug 29, 2018
-
Kell Hydrometallurgical Extraction of Precious and Base Metals from Flotation Concentrates – Piloting, Engineering, and Implementation AdvancesBy K. S. Liddell, L. A. Smith
"Kell is a hydrometallurgical treatment option for the recovery of platinum group metals (PGMs), gold, silver, and base metals from flotation concentrates to refined products on site. The process is c
Jun 1, 2019
-
Kell Hydrometallurgical Process For Extraction Of Platinum Group Metals And Base Metals From Flotation Concentrates ? SynopsisBy K. S. Liddell
The Kell Process has been developed for the extraction of platinum group metals (PGMs) and base metals from sulphide flotation concentrates. The process has been successfully tested on several differe
Jan 1, 2012
-
Kelsey Centrifugal Jig Implementation at Namakwa Sands for Zircon Recovery from Quartz RejectsBy P V. A van der Westhuyzen
Namakwa Sands is a heavy minerals mining and beneficiation business in the Exxaro Sands Division, and operates along the West Coast of South Africa (see Figure 1). The business encompasses mining, min
Oct 5, 2011
-
Kemess South Mine Closure and ReclamationBy Georgia J. Lysay
Kemess South Mine ended operations in March 2011. Final reclamation works began during operations in 2008 in anticipation of closure. The focus of reclamation during mine operations was on the inactiv
May 1, 2011
-
Kempfield Silver, Barite and Base Metal (Pb-Zn) Deposit, Lachlan Orogen, Eastern AustraliaBy D Timms
The Kempfield deposit is located in the Hill End Trough, one of several intracratonic basins developed during Silurian–Devonian time, in the eastern province of the Lachlan Orogen, Eastern Australia.T
Aug 22, 2011
-
Kennecott Process For Recovery Of Copper, Nickel, Cobalt And Molybdenun From Ocean NodulesBy Dr. Jagdish C. Agarwal
Kennecott Copper Corporation has developed a new hydrometallurgical process for extracting nickel, copper, cobalt and molybdenum from maganese nodules. This process (KCC Cuprion Process) utilizes a re
Jan 1, 1978
-
Kennecott Utah Copper Smelter ModernizationBy C. J. Newman
Before 1995, the smelting process at the Kennecott Utah Copper Corp. (KUCC) smelter consisted of Noranda reactors and Pierce-Smith converters. When considering expansion, it was decided that the exis
Jan 1, 1999
-
Kennecott Utah Copper Smelter Modernization (127c52b5-4f83-464f-bcae-2f259e9fd980)By C. J. Newman
Prior to 1995, the smelting process at the Kennecott Utah Copper Corporation (KUCC) smelter consisted of Noranda reactors and Pierce-Smith converters. In the consideration of expansion opportunities,
Jan 1, 1998
-
Kennecott Utah Copper Smelter Modernization (8900290e-0a5a-4331-88e1-53de0cc3185e)By C. J. Newman
Prior to 1995, the smelting process at the Kennecott Utah Copper Corporation (KUCC) smelter consisted of Noranda reactors and Pierce-Smith converters. In the consideration of expansion opportunities,
Jan 1, 1998
-
Kennecott Utah Copper Smelter Rebuild Over 11 Million Tonnes of Concentrate SmeltedBy D. Janney
Kennecott's Utah Smelter commenced operations in June 1995 utilizing Outokumpu Flash Smelting (FSF) and Kennecott-Outokumpu Flash Converting (FCF) technology. After some initial teething and equi
Jan 1, 2007
-
Kennecott?s Cuprion Process For Manganese NodulesBy Gale L. Hubred
Kennecott?s Ledgemont Laboratory developed the Cuprion Process to recover metal values from manganese nodules in the early 1970s. A reducing leach of monovalent cuprous ion attacks the manganese oxid
Jan 1, 2005
-
Kentucky Route 9 - Licking Pike Widening Design Build Slope StabilizationBy Frederick W. Slack
This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage
Jan 1, 2003
-
Key components for an effective filtration and pressurization system for mobile mining equipmentBy A. B. Cecala
Enclosed cabs have been used for many years to isolate workers on mobile equipment in the mining industry for health and safety reasons. These enclosed cabs create a microenvironment for workers where
Jan 1, 2014
-
Key deposit indicators (KDI) and key mining method indicators (KMI) in underground mining method selection - SME Transactions 2010By A. Nieto
This article is a review of previous discussions about underground mining method selection and classification with the purpose to clearly define and classify the two groups of variables (indicators) i
Jan 1, 2010
-
Key Differences Between In Situ Recovery Mining and Conventional MiningBy S Telford, J Weir
Heathgate Resources Pty Ltd (Heathgate) operates the Beverley Uranium Mine in South Australia, located on the plains between the northern Flinders Ranges and Lake Frome some 600 km north of the state
Jan 1, 2008