  • SME
    In Situ Stress Measurement In A Jointed Basalt: The Suitability Of Five Overcoring Techniques

    By T. A. Rundle, K. Kim, W. M. McCabe, E. C. Gregory

    Overcoring tests were conducted at the Near-Surface Test Facility(NSTF) to assess the suitability of five techniques (U.S. Bureau of Mines borehole deformation gauge (BDG), Commonwealth Scientific and

    Jan 1, 1983

  • SME
    In Situ Stress Measurements and Geologic Structures in an Underground Coal Mine in the Northern Wasatch Plateau, Utah

    By K. C. Ko, M. D. Bunnell

    The studied coal mi1e is an underground coal mine located in the northern Wasatch Plateau of central Utah (Figure 1) . Since operation began in 1981, in situ stress conditions have been encountered wh

    Jan 1, 1986

  • CIM
    In Situ Stress Measurements in a Drilling Hole Penetrated to the Tohoku-Oki Earthquake Fault: Indication of Coseismic Stress Change

    By Weiren Lin

    The Mw 9.0 Tohoku-Oki, Japan earthquake occurred on 11 March 2011 produced a maximum coseismic slip of >50 m near the Japan Trench. To investigate why the plate boundary fault between the subducting P

    Jan 1, 2015

  • AUSIMM
    In Situ Stress Measurements Using Oriented Core

    By G Baird, M Seto

    A low-cost methodology that allows the determination of in situ stresses using oriented core specimens has been investigated. The technique can be used to determine the stresses during the early stage

    Jan 1, 2000

  • AIME
    In Situ Stresses In The Klerksdorp Gold Mining District, South Africa - A Correlation Between Geological Structure And Seismicity

    By N. C. Gay, P. J. Van Der Veever

    The Klerksdorp gold mining district, South Africa, experiences a relatively high level of seismicity with many seismic events of magnitude greater than 4. These large events appear to have foci close

    Jan 1, 1982

  • SME
    In Situ Tests Of Salt Deformation For Validation Of A Radioactive Waste Repository Predictive Technology (23fc0c69-47bb-4a25-bde9-7036d4383742)

    By D. E. Munson

    The Waste Isolation Pilot Plant (WIPP) Project was established in 1975 by the Department of Energy (DOE) under Public Law 193 to develop the necessary technology for safe disposal of radioactive waste

    Jan 1, 1991

  • SME
    In soft ground, adaptable muck removal is key

    By Desiree Willis

    At 6 percent downgrade to a low point beneath California?s Sacramento River, the Lower Northwest Interceptor Sewer was a difficult project from the outset. Project owner Sacramento County Regional Sa

    Jun 1, 2010

  • AUSIMM
    In support of frontline leaders

    By A Kite

    Frontline leaders play a critical role in the safe and productive operations of Australia’s mining, resources and heavy industries. These leaders set the workplace culture, especially during night shi

    May 5, 2022

  • AUSIMM
    In-Line Pressure Jig Preconcentration Plant at the Pirquitas Mine

    By A H. Gray

    Gekko Systems Pty Ltd engaged in the test work, design, manufacturing and commissioning of the pre-concentration plant at Silver Standard Resources Inc’s Pirquitas mine in the north western Jujuy prov

    Aug 8, 2011

  • NIOSH
    In-Mine Remote Actuated Stench Gas Warning System - Objective

    Provide an inexpensive, remote actuated, stench-gas system which reduces fire warning time to underground work locations. Approach A mine's pager phone hard-wire network is used to release

    Jan 1, 1984

  • SME
    In-mine study of high-expansion firefighting foam - SME Transactions 2010

    By R. S. Conti, M. R. Krump, C. P. Lazzara Ph. D., R. L. Derick, L. L. Chasko

    A mine fire is one of the most challenging safety issues facing a mine operator and can occur at any location underground. The National Institute for Occupational Safety and Health (NIOSH) and the Twe

    Jan 1, 2010

  • AUSIMM
    In-pit backfilling as part of integrated life-of-mine waste scheduling, closure planning and AMD risk management – Martabe Mine as a case study

    By K Grohs, A Satriawan, S R. Pearce

    Martabe gold and silver mine is operated by PT Agincourt Resources (PTAR) and is situated in northern Sumatra and comprises several deposits in steep terrain, and in a tropical climate, that are requi

    Aug 2, 2023

  • SME
    In-Pit Conveying at the Wyodak Mine-Gillette, Wyoming

    By Ryne Goodnough

    INTRODUCTION The Wyodak Mine is located in the northern Powder River Basin of Wyoming and is thought to be the oldest continuously operating coal mine in the United States, having recorded yearly

    Jan 1, 2004

  • SAIMM
    In-Pit Crusher Location as a Dynamic Location Problem

    By M. Paricheh, M. Rahmanpour

    "The cost efficiency and high reliability of semi-mobile or combined in-pit crushing-conveying (IPCC) and truck systems, compared to conventional truck-shovel systems alone, make them more attractive

    Jan 1, 2017

  • AUSIMM
    In-Pit Crushing and Conveying

    By I Lourel

    In evaluating the installation of an in-pit crushing and conveying (IPCC) system for any mine, a number of options are available for each of the dig side, transport and dump side operations. Some of t

    Jan 1, 2009

  • SME
    In-Pit Crushing And Conveying At Highland Valley Copper (ed32fdb4-81a8-44a9-9ceb-c2871da4e7e5)

    By A. D. MacPhail

    The Highland Valley Copper partnership was formed in July 1986 and was the logical result of a mine with a large ore reserve but no adequate mill, and a mine with a large, modem mill but dwindling ore

    Jan 1, 1993

  • AUSIMM
    In-Pit Crushing and Conveying Bench Operations

    By T Atchison

    In-pit crushing and conveying (IPCC) systems have come under growing scrutiny as a perceived mitigation to fuel and equipment price fluctuations, labour shortages and the need to move everincreasing v

    Jul 11, 2011

  • SME
    In-Pit Crushing And Conveying Systems

    By J. Korak

    Belt conveyor systems, long the standard transportation technique in soft-rock open-pit applications, are encountering growing interest in the hard-rock open-pit sector as economic factors force compa

    Jan 1, 1985

  • AUSIMM
    In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit Closure

    By D J. Robinson, L L. Kuhar

    "Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to

    Nov 15, 2016

  • AUSIMM
    In-pit Tailings Disposal at Langer Heinrich – Tailings Storage Facilities in a Unique Hydrogeological Setting

    By D Luppnow, C Hore

    In-pit tailings storage can provide many advantages when compared to typical above-ground tailings storage facilities (TSFs). As regulations become more restrictive and existing mines expand into new

    Jul 27, 2015