Search Documents

Sort by

  • AUSIMM
    Improving Autogenous/Semi-Autogenous Grinding Performance and Energy Efficiency with Optimised Pulp Lifter Design

    The comminution process indicates that the most energy-efficient comminution system would be one where the particles leave the breakage field as soon as they reach product size. Contrary to the free f

    Jan 1, 2009

  • AUSIMM
    Improving Blasting by a Team Approach at the Henty Gold Mine

    By R Wedmaier

    Henty Gold Mine is an underground operation producing 100 000 ounces of gold per annum. The original mining method used was flatbacking with paste fill. However, a non-entry method û uphole benching û

    Jan 1, 2001

  • AUSIMM
    Improving compliance in mining through an effective geoscientific information management framework

    By S Mundell, A Atkins, S van de Water

    Geoscientific information management enables the capture, management and delivery of the original geoscientific observations and measurements of the earth’s natural resources. However, original observ

    Nov 8, 2021

  • CIM
    Improving Concentrate Loadout Availability with Specialised Containers and an Upgraded Filter Press at the Nunavik Nickel Project Concentrator

    By M. Girard, C. Farsangi, N. Singh

    "Canadian Royalties Inc. owns and exploits the Nunavik Nickel Project: a copper and nickel deposit in Nunavik, Québec. The nickel and copper concentrates are filtered by plate and frame filter presses

    Jan 1, 2019

  • AUSIMM
    Improving Consistency of Delivery at Mt Rawdon Operation

    By M Boon, M Franklin

    This paper outlines the journey of cultural maturation and management system development at the Mt Rawdon (MRO) gold mine from its acquisition by Evolution Mining Limited (Evolution) in late 2011 to 2

    Jun 22, 2016

  • CIM
    Improving Construction Environmental Metrics Through Integration of Discrete Event Simulation and Life Cycle Analysis

    By H. Golzarpoor

    Life Cycle Analysis (LCA) is a methodology for evaluating the environmental impacts associated with a product during its life cycle. LCA is identified as the most reliable method for verifying environ

    Aug 1, 2013

  • SME
    Improving Contracting Methods - The Engineer's Viewpoint

    By Thomas R. Kuesel

    In simpler times, construction was a cooperative undertaking. The frontier tradition of barn-raising is the construction equivalent of the academic ideal of a single student seated on a log with Horac

    Jan 1, 1983

  • SME
    Improving Contracting Methods--The Owner's Viewpoint

    By Sammie D. Guy

    This paper discusses the subject of "Improving Contracting Methods" from the owners point of view, particularly the public. An overview is given of the work of the U.S. National Committee on Tunneling

    Jan 1, 1983

  • SME
    Improving Conveyor Transfer Point Performance in Hard Rock Mines

    By R. Shields

    "Hard rock mines move large volumes of material. But the conveyors essential to this movement suffer lots of problems, including carryback, spillage, dust, and belt wander. Many of these issues are cr

    Jan 1, 2017

  • SME
    Improving Conveyor Transfer Point Performance in Hard Rock Mines (3df8afc1-5943-4b67-9bd9-6a87144e0c1e)

    By R. Shields

    "Hard rock mines move large volumes of material, which can cause the conveyors that are essential to this movement to suffer lots of problems, including carryback, spillage, dust and belt wander. Many

    Jan 11, 2017

  • AUSIMM
    Improving Cooling Tower Performance with Innovative Horizontal Outflow Design

    By T Hirsi, M Weatherseed, T Ritasalo

    Cooling tower design has not advanced significantly in the last decade. Recognising this, Outotec has developed an innovative horizontal outflow cooling tower with increased performance compared to co

    Sep 7, 2015

  • AUSIMM
    Improving crusher throughput using a problematic ore index based on simple, first principles geology

    By T Walton, C Perring, M Pepper, G Gerber

    The Yandicoogina Channel Iron Deposit (CID) is an accumulation of iron pisolites cemented by a goethite-rich matrix. The Yandicoogina CID’s are found in a palaeochannel that meanders within a broad st

    Mar 22, 2022

  • SME
    Improving Diesel Quality Reduces Cost and Emissions

    By R. L. Miller

    "Why should we care about diesel quality amidst the complexity of mining for minerals? Mining companies use a large amount of diesel fuel in their worldwide operations, both for moving ore from the mi

    Jan 1, 2017

  • CIM
    Improving Double Bench Face Performance at the Ekati Diamond MineTM Site

    By Judy K. Todd

    Double benching has been utilized as an excavation technique in open pit mines for many years. This process involves drilling, blasting, and excavating the material for the design bench height. A seco

    May 1, 2002

  • AUSIMM
    Improving drill productivity and delivering better geophysical data faster

    By T A. J Hopper, S Mukkisa, K-O Ott, D Palmer

    RIG Technologies has developed new technology that can successfully acquire high quality natural gamma ray (GR) and hole deviations, downhole while drilling, on reverse circulation drills. This techno

    Nov 8, 2021

  • ISEE
    Improving Drilling and Blasting By Using TQM and Appropriate IT

    By John Hutchings

    Drilling and blasting is a clearly delineated work process, which has well defined inputs and outputs. Drilling and blasting is also a process with a number of steps each of which has measurable outco

    Jan 1, 2004

  • AUSIMM
    Improving Drive Stability through Efficient Development Blasting Design and Practices

    By P Klaric

    Drive stability is critical in block/panel cave mining. The production levels of these mines are required to remain operational for the entire life-of-mine which can be in excess of 30 years. It is th

    Aug 24, 2015

  • NIOSH
    Improving Dust Control Technology For U.S. Mines - The Bureau Of Mines Respirable Dust Research Program, 1969-82 - Introduction

    By John A. Breslin

    This report summarizes the principal activities and significant results of the Bureau of Mines respirable dust research program since passage of the Federal Coal Mine Health and Safety Act of 1969 and

    Jan 1, 1982

  • AUSIMM
    Improving dust management in gate road development – a computational fluid dynamics-virtual reality based training tool for mine workforce

    By M Qiao, A Sugden, W Zong, J Hines, J Roberts, T Ren

    Long-term exposure to respirable dust continues to present an occupational health and safety hazard to mine workers in underground mines. Workers who are exposed to mine dust can develop occupational

    Apr 16, 2024

  • AUSIMM
    Improving Efficiency of Sealing Off Water by Pregrouting

    AND INTRODUCTION The Lochiel coal deposit, a large Tertiary soft brown coal deposit in the mid north of South Australia, is currently being investigated by the Electricity Trust of South Australia (

    Jan 1, 1988