Search Documents

Sort by

  • CIM
    Improvements in Acid Rock Drainage Testing For Short- and Long-Term Neutralisation Kinetics

    By Roger St. C. Smart, Paul Weber, Joan E. Thomas, William M. Skinner, Warwick Stewart, Stuart Miller

    For mine sites affected by acid rock drainage (ARD) or with a potential future ARD issue, the prime consideration is not only the classification of different waste rock as potentially acid forming or

    Jan 1, 2004

  • AUSIMM
    Improvements in Blast Fragmentation Models Using Digital Image Processing

    By E Mofya, R Kaunda, P Lever

    One of the fundamental requirements for being able to optimise blasting is the ability to predict fragmentation. An accurate blast fragmentation model allows a mine to adjust the fragmentation size fo

    Jan 1, 2001

  • CIM
    Improvements in Column Flotation Through the Use of Microcel™ Spargers at Antamina

    By David Estrella, Hector M. Lizama, Jhonny Carrión

    "Microcel™ sparging systems were installed on one column of the molybdenum cleaner circuit and one column of the copper first cleaner circuit at Antamina. The Microcel™ system is known to generate fin

    Jan 1, 2008

  • SME
    Improvements In Copper/Lead Separation With Activated Carbon (cda83d32-ab8b-441a-bc6d-9412a16e7289)

    By John A. Meech

    In many multiple-sulphide ore flotation processes, it is desirable to concentrate each of the various valuable minerals into separate products. Although there are a variety of techniques and chemicals

    Jan 1, 1977

  • DFI
    Improvements in Deep Compaction Using Vibratory Pile Hammers (a877ad8a-6d27-4e33-a419-f0edb9bac870)

    By Dennis Nottingham

    "Increased interest in seismic soil liquefaction and preventative soil stabilization sets the stage for improved deep compaction methods using pile driving techniques. In 1971, L.B. Foster Company per

    Jan 1, 2005

  • AUSIMM
    Improvements in estimating strengths of loose tailings: results from the TAILLIQ research project

    By D Reid, J Vinod, M Rahman, A Fourie, T Vo, J Ayala, A Russell

    This paper reports on an industry and Australian Research Council funded research project, TAILLIQ, that is a joint initiative between four Australian Universities. The paper discusses the accuracy wi

    Jul 1, 2021

  • AUSIMM
    Improvements in Flotation Cell Maintenance, Power Consumption and Operation at South32 Cannington

    By M Bird, B Oats, M Sganzerla

    Mining operations are continually aiming to reduce operating costs to improve plant profitability. One way in which the Cannington operation sought to achieve this was by increasing the wear life and

    Sep 7, 2015

  • SME
    Improvements In Geotechnical Aspects Of Contract Documents For Underground Construction

    By Allen W. Hatheway, John A. Albritton, Lloyd B. Underwood

    Missouri River Division (FORD), U.S. Army Corps of Engineers (COE), has completed (October 1982) a study for the U.S. Air Force Ballistic Missile Office, in which desireable and needed changes in cont

    Jan 1, 1983

  • SME-ICGCM
    Improvements in Long Tendon Support with Pumpable Resin

    By Tom Meikle

    Long tendon support systems provide several challenges when used in-cycle as part of the secondary or primary support cycle. A two-component pumpable resin, Carbothix, has been in development for use

    Jan 1, 2012

  • SME
    Improvements in Magnetite Processing Utilising Magnetic Separation Technologies - SME Annual Meeting 2025

    By George Mandarakas, Johan van Zyl, Karl-Heinz Becker

    The world’s climate today has changed compared to 10 or 20 years ago. Many countries face water shortages; water sourcing for mining activities has become harder to secure. ESG’s focus on the industry

    Feb 1, 2025

  • SME
    Improvements In Resource Recovery At Stauffer's Big Island Mine

    By J. F. T. Agapito

    Significant increases in extraction ratio on the order of six to eight percent, equivalent to as much as 142 t/m of panel advance, have occurred at the Big Island Mine during the last five years with

    Jan 1, 1988

  • CIM
    Improvements in Sag Mill Throughput from Finer Feed Size at the Newmont Ahafo Operation

    By Adrian Dance

    Newmont Ghana Gold Limited?s Ahafo operation have been working with Metso Process Technology & Innovation (PTI) since early 2009 to increase mill throughput from a combination of controlled blasting p

    Jan 1, 2012

  • AUSIMM
    Improvements in Service Life and Cost Reduction for Gyratory Primary Crushers through Mantle and Concaves Optimisation – A Case Study

    By I Elias, E Moya, S Chaffer

    This paper is based on a case study from a mine site that operates two gyratory primary crushers. These crushers were encountering problems, which included inconsistent P80, reduced liner life tonnage

    Jul 13, 2015

  • TMS
    Improvements in the Design of Peirce Smith Converters for its Operation in Potrerillos Smelter

    By Orlando C. Rojas

    The Potrerillos Smelter commissioned a new El Teniente converter in 1985. As a result of the use of this technology, the Peirce-Smith converters have been processing only high grade matte or white met

    Jan 1, 1993

  • AUSIMM
    Improvements in the Understanding and Applications of Backfill for Improving Ground Stability in Underground and Open Pit Operations

    The safety culture in mining has progressed towards a zero tolerance of injury. This change has required that some historically inherent risks of mining are engineered out or reduced. One of the signi

    Jun 1, 2010

  • SME
    Improvements Seen in Acid-Mine-Drainage Technology

    By William R. Yernberg

    The Fifth International Conference on acid rock drainage (ICARD 2000) was held May 21-24, 2000, in Denver, CO. The three-day conference consisted of about 150 oral presentations and poster sessions t

    Jan 1, 2000

  • DFI
    Improvements to Commonly Used Cutoff Wall Specifications

    By Michael Kynett, Francke Walberg, Richard Millet, Khaled Chowdhury, Mary Perlea

    "Cutoff walls are the most common seepage improvement measure for levee flood control projects throughout California’s Central Valley. Cutoff walls are widely used because they can be implemented with

    Jan 1, 2015

  • CIM
    Improvements to Efficiency and Production Through Information Technology

    By Scott Beer

    What New Technologies Will Drive Economic Improvements? ??Historical ?1060?s: Mainframe Technologies ?1970?s: Mini Computing ?1980?s: Workstation Computing ?1990?s: Personal Computing ?2000?s:

    May 1, 2009

  • CIM
    Improvements to Production Planning in Oil Sands Mining Through Analysis and Simulation of Truck Cycle Times

    By E. Goris Cervantes

    "A theoretical framework based on a detailed analysis of mine operations data from an oil sands mine in northern Alberta and the static simulation of truck cycle times are developed, verified, and val

    Jan 1, 2019

  • TMS
    Improvements to Stillwater Mining Company's Smelting! Furnace Yielding Increased Capacity and Productivity

    By N. Voennann

    Stillwater Mining Company operates an electric furnace at its smelter in Columbus, Montana to treat a Ni-Cu-platinum group metal concentrate along with secondary PGM bearing materials. Hatch Associate